Plastic Film Washing Plastic Waste Film Recycling Washing Machine/recycling Washing Line
PP PE film washing recycling machine is widely used for washing and recycling waste PE film and PP woven bags,non-woven bag. This line can separate muds, sands and other impurities from films and bags easily. The whole production line is automatic controlling, compact process. it can process capacity up to 1000 kg/h, the out products can be applied for granulation.
Model
Capacity(kg/h)
Length Line
Power
Work ways
PP/PE 300
300
25
To be determine
Automatic
PP/PE 500
500
50
To be determine
Automatic
PP/PE 1000
1000
65
To be determine
Automatic
SEVENSTARS PP PE washing plant is consist of the following components: • Belt conveyor: For waste material feeding. • Metal Detector – detects metal contamination that may remain in the plastic waste • Crusher: Wet crushing system,It used for material size reduction and pre-washing by water spraying from the top. • Screw conveyor : For PP PE flakes transportion • High speed Friction washer: could achieve a good cleaning effects through the blades on the beating and rub. • Hot Washing Tank/ steam washer – hot washing process with alkaline (caustic) soda to remove glue and oil. • Washing tank/ floating washer: For flakes floating washing and conveying. • Horizontal dewatering machine( Dehydrator):This machine is mainly used for the drying of the pp pe flakes , it throw the water; Sevenstars machinery * Squeezer machine :This machine is mainly used for the drying and granulating of the pp pe flakes , it throw the water less than 3%, instead of the dewatering machine and hot air drying machine in the recycling machine; it will be good for pelletizing line,and increase the capacity of pelletizer.SEVENSTARS from the screen by high speed rotating ,and the plastic get out of the machine enters into the next procedure from the outlet .The machine has a good drying effect and high energy efficiency. The paddle is made of high wear-resistant materials, can be replaced more conveniently. • Hot air dryer-this machine will dry the pet flakes further by hot air. • Blower and transition silo: transportation to storage silo. • Control cabinet: For control the whole system intensively.
Details Images
Crusher machine
Motor power: 37-90kw,Siemens motor China
Mesh screen:φ60mm for film
Rotation diameter of Main shaft: φ580mm
length of main shaft:1750mm
Feeding inlet: 1000mm×800mm
Quantity of rotating blade:10pcs(5group)
Quantity of fixed blade:4pcs(2group)
The material of crushing blade:D2
Crushing with water, the bearing with water cooling design
Floating washing tank
Effective length: 6000mm, Width: 1500mm
Washing roller motor: 2.2KW+3kw,Siemen motor China
Qty of pushing roller : 5 sets
4.Roller move speed control way: by inverter
5.Material for contact with water: Stainless steel 304
The floating washing tank with water level control device
7.Bottom design is Conical type which is easy to discharge the dirty from the washing tank.
Dewatreing machine
Motor speed: 1800rpm
The diameter of the screen hole: 2mm
The thickness of screen mesh : 4mm
The dewatering rate: more than 95%
Continuously discharge the material from side and drainage from the bottom of this machine.
Bearing of the machine:SKF bearing
High speed friction washer
Effective length:3800mm
Screw diameter: φ380mm
Capacity: >600 kg/hour
Motor power:15kw,Siemens motor China
Material for contact with water: Stainless steel 304
This machine with water spray nozzlefrom the top
Rotary speed : 640rpm
Hot air pipe line dryer
This machine is mainly used to use hot air to remove the moisture from PP scraps
1.Total length of stainless steel 316 pipe:15meter
2.The diameter of stainless steel pipe:219mm
3.Heating power of heating box :28Kw
4.The temperature is adjustable by temperature controller
The Moisture of PPscrapswill be less than 1%
6.Power of air blower motor: 9Kw
Control box
Electric elements: Schneider Contactor, Schneider Relay,
Inverter will use ABB brand.
Shipping Timeframes: All orders are processed within 2-5 business days (excluding weekends and holidays). After your order has been processed, the estimated delivery time is before 23 Jan, 2025, depending on customs, Please note that due to high demand, some items may experience longer shipping times, which will be communicated at order confirmation email.
Order Processing Time: Please allow 2-5 business days for us to process your order before it is shipped . Orders placed after 16:00 on Fridays, or during weekends and public holidays, will begin processing on the next business day. Processing times may be extended during peak seasons or sales events.
Manufacturing Time: Some products needs manufacturing time, the manufacturing process will take approximately 10-30 business days depending on the product. This timeframe may vary depending on the complexity of the product and current demand. but this will be communicated with you during order confirmation.
Returns and Exchanges: We offer a 30-day return policy for most items. If you are not completely satisfied with your purchase, you may return it within 30 days of receipt for a refund or exchange. Items must be unused, in their original packaging, and accompanied by proof of purchase. Return shipping costs are the responsibility of the customer, unless the item was damaged or defective upon arrival.
0
0 Overall Rating
5
0%
0
4
0%
0
3
0%
0
2
0%
0
1
0%
0
Review this product
For you to write a review, you need to login first
Afrimart Online stands as Africa's foremost e-commerce hub, featuring an expansive array of product categories spanning electronics, machinery, toys, furniture, and more. Committed to excellence, our platform delivers swift and streamlined logistics and customs clearance solutions, offering a comprehensive one-stop service for cross-border imports.
Leveraging over three decades of international trade expertise, we ensure a seamless and hassle-free importing experience, providing top-tier products at competitive prices to meet the diverse needs of African consumers.
At Afrimart, we strive to process all orders promptly. Once the payment has been successfully cleared into our account, your order will be processed within 2 to 5 business days. Please note that this processing time excludes weekends and public holidays.
Following the processing of your order, the estimated delivery lead time ranges between 35 to 60 days. However, please be aware that this timeframe is subject to variations due to potential delays in shipping and customs clearance. While we aim to adhere to the original delivery schedule, unforeseen circumstances may occasionally extend the delivery window beyond the anticipated 35 to 60 days.
In the event of high demand or other factors leading to longer shipping times for certain items, we will communicate any expected delays during the initial order confirmation. We appreciate your understanding and patience as we work to ensure your order arrives as swiftly as possible.