The SM2-2 1200W Wind Turbine System is a powerful and reliable solution for harnessing wind energy in your home. Designed to provide sustainable power, this wind turbine system offers efficient energy generation with a high-quality build. Ideal for residential use, it works effectively in areas with moderate wind speeds.
Key Features:
Efficient Power Output: With a 1200W capacity, the system generates reliable energy for home use.
Multiple Voltage Options: Available in 12V, 24V, and 48V configurations to suit different energy needs.
Optimized Blade Design: Features 3 blades made from durable nylon fiber, designed for maximum performance and longevity.
Low Start-up Speed: The turbine begins operating at a low wind speed of just 2.5m/s.
Safe Operation: The system is built to withstand high wind speeds, with a safe wind speed tolerance of up to 45m/s.
3-Phase Permanent Magnet Generator: The generator type ensures smooth and efficient power conversion.
Durable Materials: Constructed with rare earth NdFeB for the rotor, offering strength and durability for long-term use.
Rotor Diameter: With a 1.67-meter rotor diameter and 810mm blade length, the system is capable of capturing significant wind energy.
Item
SM3-1000
SM2-2-1200
SM4-1200
SM5-1500
SM6-2000
SM8-2500
SM10-3000
Rated Power
1000W
1200W
1200W
1500W
2000W
2500W
3000W
Maximum Power
1100W
1300W
1300W
1600W
2200W
2700W
3300W
Rated Voltage
12-24V
12-48V
12-48V
24-96V
24-96V
24-96V
48-96V
Blade Length
810mm
810mm
810mm
950mm
1000mm
1080mm
1200mm
Rotor diameter
1.67m
1.67m
1.67m
1.95m
2.05m
Start-up Wind Speed
4m/s
4m/s
4m/s
4m/s
4m/s
4m/s
4m/s
Rated Wind Speed
12m/s
12m/s
12m/s
12m/s
12m/s
12m/s
12m/s
Product Assembly Weight
14kg
14kg
24kg
31kg
41kg
58kg
65kg
Quantity of Blades
3
Blades Material
Nylon Fiber
Generator Type
Three Phase Permanent Magnet AC Synchronous Generator
Magnet Material
NdFeB
Generator Case
Casting Aluminum Alloy
Control System
Electromagnet
Overspeed Protection
Electromagnetic brake
Working Temperature
-25~+45ºC
Overload Protection
Electromagnetic Brake And The Unloading Unit
The SM2-2 1200W Wind Turbine System is designed to meet the growing demand for clean energy solutions. It’s ideal for residential setups, providing reliable, renewable energy for your home while reducing your reliance on conventional power sources.
Product Info Gallery
High Quality
Application Scenario
Shipping Timeframes: All orders are processed within 2-5 business days (excluding weekends and holidays). After your order has been processed, the estimated delivery time is before 24 Apr, 2025, depending on customs, Please note that due to high demand, some items may experience longer shipping times, which will be communicated at order confirmation email.
Order Processing Time: Please allow 2-5 business days for us to process your order before it is shipped . Orders placed after 16:00 on Fridays, or during weekends and public holidays, will begin processing on the next business day. Processing times may be extended during peak seasons or sales events.
Manufacturing Time: Some products needs manufacturing time, the manufacturing process will take approximately 10-30 business days depending on the product. This timeframe may vary depending on the complexity of the product and current demand. but this will be communicated with you during order confirmation.
Returns and Exchanges: We offer a 30-day return policy for most items. If you are not completely satisfied with your purchase, you may return it within 30 days of receipt for a refund or exchange. Items must be unused, in their original packaging, and accompanied by proof of purchase. Return shipping costs are the responsibility of the customer, unless the item was damaged or defective upon arrival.
0
0 Overall Rating
5
0%
0
4
0%
0
3
0%
0
2
0%
0
1
0%
0
Review this product
For you to write a review, you need to login first
At Afrimart, we strive to process all orders promptly. Once the payment has been successfully cleared into our account, your order will be processed within 2 to 5 business days. Please note that this processing time excludes weekends and public holidays.
Following the processing of your order, the estimated delivery lead time ranges between 35 to 60 days. However, please be aware that this timeframe is subject to variations due to potential delays in shipping and customs clearance. While we aim to adhere to the original delivery schedule, unforeseen circumstances may occasionally extend the delivery window beyond the anticipated 35 to 60 days.
In the event of high demand or other factors leading to longer shipping times for certain items, we will communicate any expected delays during the initial order confirmation. We appreciate your understanding and patience as we work to ensure your order arrives as swiftly as possible.