Our Full-Automatic Wafer Production Line is designed to meet the needs of the domestic biscuit manufacturing industry, while incorporating best practices from global wafer production lines. It boasts reliable performance, a compact structure, high yield, low energy consumption, and simple operation.
Key components include:
Baking Oven
Cooling Tower
Sheet Picking Machine
Cream Spreading Machine
Cooling Cabinet
Cutting Machine
Batter Mixer
Cream Mixer
Smash Machine
The system uses SEW Germany-driven motors and SKF France bearings. The PLC programming ensures that the process is fully automated and easy to control, significantly enhancing production efficiency.
High Quality and High Capacity Biscuit Machine Hollow Wafer Machine:
We specialize in producing superior quality Chocolate Coating Hollow Wafer Machines. These machines enrobe wafers in a crispy chocolate layer, with a smooth and soft chocolate filling inside—perfect for creating a sweet, delightful experience.
Our production line is designed for stable performance and reliable results. With SEW motors, SKF bearings, and an automated PLC system, this equipment is easy to operate and highly efficient.
Complete Line Parameters:
Capacity: 10.0 tons (24 hours)
Power Supply Requirement: 380V, 50HZ
Motor Power: 63.0KW
Production Demoulding Rate: ≥98%
LPG Consumption: 23kg/h
Natural Gas Consumption: 20-30 m³/h
Baking Time/Baking Speed: 90 seconds
Baking Plate Size: 470×325mm
Complete Line Dimensions (L×W×H): 46.5m×5.0m×2.5m
Gross Weight of Hollow Wafer Machine: 20 tons
Chocolate Enrobing Wafer Ball Machine:
Our line also includes equipment for producing chocolate-coated wafer balls, ensuring that your production capabilities meet every demand in wafer and chocolate coating.
Capacity
10.0 tons(24 hours)
Power supply requirement
380V, 50HZ
Motor power
63.0KW
Production demoulding
≥98%
LPG consumption
23kg/h
Natural Gas consumption
20-30 m³/ h
Baking time/Baking speed
90seconds
Baking plate size
470*325mm
Complete line dimension (L×W×H):
46.5m×5.0m×2.5m
hollow wafer machine gross weight
20 tons
Shipping Timeframes: All orders are processed within 2-5 business days (excluding weekends and holidays). After your order has been processed, the estimated delivery time is before 23 Apr, 2025, depending on customs, Please note that due to high demand, some items may experience longer shipping times, which will be communicated at order confirmation email.
Order Processing Time: Please allow 2-5 business days for us to process your order before it is shipped . Orders placed after 16:00 on Fridays, or during weekends and public holidays, will begin processing on the next business day. Processing times may be extended during peak seasons or sales events.
Manufacturing Time: Some products needs manufacturing time, the manufacturing process will take approximately 10-30 business days depending on the product. This timeframe may vary depending on the complexity of the product and current demand. but this will be communicated with you during order confirmation.
Returns and Exchanges: We offer a 30-day return policy for most items. If you are not completely satisfied with your purchase, you may return it within 30 days of receipt for a refund or exchange. Items must be unused, in their original packaging, and accompanied by proof of purchase. Return shipping costs are the responsibility of the customer, unless the item was damaged or defective upon arrival.
0
0 Overall Rating
5
0%
0
4
0%
0
3
0%
0
2
0%
0
1
0%
0
Review this product
For you to write a review, you need to login first
At Afrimart, we strive to process all orders promptly. Once the payment has been successfully cleared into our account, your order will be processed within 2 to 5 business days. Please note that this processing time excludes weekends and public holidays.
Following the processing of your order, the estimated delivery lead time ranges between 35 to 60 days. However, please be aware that this timeframe is subject to variations due to potential delays in shipping and customs clearance. While we aim to adhere to the original delivery schedule, unforeseen circumstances may occasionally extend the delivery window beyond the anticipated 35 to 60 days.
In the event of high demand or other factors leading to longer shipping times for certain items, we will communicate any expected delays during the initial order confirmation. We appreciate your understanding and patience as we work to ensure your order arrives as swiftly as possible.