π Important:
All orders, emails, and quotations will be processed and responded to once we reopen on 3rd January 2025.
Thank you for your understanding and patience!
π Festive Closing Notice:
We will be closed from 21st December 2024 to 3rd January 2025.
Wishing you a joyous holiday season! π
Strut channel roll forming machine is also called like seismic support roll forming machine or seismic channel roll forming machine, its product is used to mount, brace, support, and connect lightweight structural loads in building construction. Ourstrut channel roll forming machine is suitable to produce strut channels with 12 gauge(2.6mm) or 14 gauge(1.9mm) thick sheet metal (normally range 2-2.5mm), raw material could be Hot-rolled and cold rolled steel, Hot-dip galvanized sheet, Pre-Galvanized Steel, Mill(Plain/Black) Steel, Aluminum, Stainless Steel etc. And according to slot type, our machine could produce solid channel, slotted channel, half slotted channel, long slotted channel, punched channel, punched and slotted channel etc.
The C profile strut channel machine is to make size 85x150 mmm, 85x180mm, 110x120mm, 110x150mm and 110x180mm, material thicknesses: 2.00 and 2.50 mm hot-dip galvanized And the machine is according to the EN 2081:2011 or EN ISO 4042:2001
Forming stations
About 20-22 stations or according to you profile drawings
Cold rolled or hot rolled steel,galvanized steel,SS316L, Mild Steel
Whole line working speed
8-10m/min
Length precision
6+-1.0mm
Punching system
110 tons punching press machine(option)
Cutting system
servo Tracking cutting
Inverter
Siemens,Mitsubishi, panasonic (option Brand)
PLC
Siemens,Mitsubishi, panasonic (option Brand)
Main Power with reducer
22KW WH Chinese Famous
Cutting holder
Servo following cutting
Motor power of hydraulic station
5.5KW
Cutting type
Hydraulic drive, cut after forming
Material of cutting blade
Cr12Mov , quenching process
Product Display
Application
Strut Channel systems are used for light and medium-duty application, generally for support of pipework, ventilation systems, air-condition systems, wiring, plumbing, electrical conduits, cable trays, rooftop installations, etc.
Shipping Timeframes: All orders are processed within 2-5 business days (excluding weekends and holidays). After your order has been processed, the estimated delivery time is before 24 Feb, 2025, depending on customs, Please note that due to high demand, some items may experience longer shipping times, which will be communicated at order confirmation email.
Order Processing Time: Please allow 2-5 business days for us to process your order before it is shipped . Orders placed after 16:00 on Fridays, or during weekends and public holidays, will begin processing on the next business day. Processing times may be extended during peak seasons or sales events.
Manufacturing Time: Some products needs manufacturing time, the manufacturing process will take approximately 10-30 business days depending on the product. This timeframe may vary depending on the complexity of the product and current demand. but this will be communicated with you during order confirmation.
Returns and Exchanges: We offer a 30-day return policy for most items. If you are not completely satisfied with your purchase, you may return it within 30 days of receipt for a refund or exchange. Items must be unused, in their original packaging, and accompanied by proof of purchase. Return shipping costs are the responsibility of the customer, unless the item was damaged or defective upon arrival.
0
0 Overall Rating
5
0%
0
4
0%
0
3
0%
0
2
0%
0
1
0%
0
Review this product
For you to write a review, you need to login first
Afrimart Online stands as Africa's foremost e-commerce hub, featuring an expansive array of product categories spanning electronics, machinery, toys, furniture, and more. Committed to excellence, our platform delivers swift and streamlined logistics and customs clearance solutions, offering a comprehensive one-stop service for cross-border imports.
Leveraging over three decades of international trade expertise, we ensure a seamless and hassle-free importing experience, providing top-tier products at competitive prices to meet the diverse needs of African consumers.
At Afrimart, we strive to process all orders promptly. Once the payment has been successfully cleared into our account, your order will be processed within 2 to 5 business days. Please note that this processing time excludes weekends and public holidays.
Following the processing of your order, the estimated delivery lead time ranges between 35 to 60 days. However, please be aware that this timeframe is subject to variations due to potential delays in shipping and customs clearance. While we aim to adhere to the original delivery schedule, unforeseen circumstances may occasionally extend the delivery window beyond the anticipated 35 to 60 days.
In the event of high demand or other factors leading to longer shipping times for certain items, we will communicate any expected delays during the initial order confirmation. We appreciate your understanding and patience as we work to ensure your order arrives as swiftly as possible.