LiFePO4 Battery 100kWh, 200kWh, 300kWh with AC Power Output GRES Integrated Battery Energy Storage System
GRES is an intelligent and modular power supply equipment integrating lithium battery and MPCS. According to different application scenarios, lithium battery, bidirectional DC / AC converter, bidirectional DC / DC converter, Static switch and Power management system can be arbitrarily combined to realize grid connected power supply, off grid power supply and off grid uninterrupted power supply power supply, static reactive power compensation, harmonic suppression and other functions. The system can have access to new energy, power grid, diesel generator and to rreasonable configuration, scientific utilization, to provide users with green, environmental protection, noise free, high reliability and high security power services.
LiFePO4 Battery Energy Storage System
Using Lithium-ion phosphate battery cell, long life cycle and high safety;
Each battery module is with 5.12kWh, the pack has a built-in BMU system, which can collect the voltage and temperature of each cell, and manage the cell balance, so as to ensure the normal operation of the whole pack safely and efficiently.
15 modules are connected in series to form one cluster, with control box and second level BMS(BCU);
Several clusters connected in parallel to be different capacity.
Multifunctional PCS
Bidirectional AC / DC converter can realize the bidirectional conversion from DC to AC and AC to DC. It can not only convert AC to DC to charge battery, but also convert DC to AC to supply power to load or feed back to power grid.
PV Control Module (MPPT)The function of DC / DC module is to filter the power from photovoltaic panel, increase its voltage for bidirectional DC / AC converter or store energy for lithium battery.Static Transfer SwitchSeamless on/off grid automatically switch.
HVAC
The battery compartment integrates 1200W industrial air conditioner to meet the stable operation of the system in different environments and prolong the service life of the system.
PMS(Power Management System)
System operation data monitoring, operation strategy management, historical data record, system status record, etc.
Specification
Parameter
GRES-75-50
GRES-150-100
GRES-225-150
GRES-300-200
PV parameters (Optional)
MPPT voltage range
DC200V~DC700V
Full power MPPT voltage range
DC370V~DC700V
MPPT channel Qty
1/2/3
Single-circuit MPPT maximum current(A)
135A
AC parameters (grid connected)
Rated output power (kW)
50
100
150
200
Max output power (kW)
55
110
165
220
Rated grid voltage (V)
3W+N+PE, 380
Grid voltage range
±15%
Rated grid frequency (Hz)
50
Grid frequency range (Hz)
±2
Current waveform distortion rate
<3%(Rated voltage)
DC component
<0.5%In
Power factor
>0.99(Rated voltage)
Power factor adjustable range
1(lead)~1(lag)
Overload capacity
110% Long term
AC parameters (off grid)
Rated output power (kW)
50
100
150
200
Max output power (kW)
55
110
165
220
Rated grid voltage (V)
3W+N+PE, 380
Current waveform distortion rate
<3%(Linear Load)
Rated frequency(Hz)
50
Overload capacity
110% Long term
Battery
Battery type
Lithium iron phosphate
Energy of each module(kWh)
5.12
Module qty
15
30
45
60
Total power (kWh)
76.8
153.6
230.4
307.2
Running Time (h)
1.5(Optional by Changing module qty)
Cyclelife
25℃0.5C/0.5C100%DODEOL80%≥4000s
System efficiency
Max efficiency
95%
Protection
DC Switch
YES
AC switch
YES
Grid monitoring
YES
Surge protection
DC /AC 2nd level
Basic Parameters
Dimension(W*D*H)(mm)
1680*1500*1700
1680*2270*1700
1680*3050*1700
1680*3830*1700
Weight (kg)
1395
2470
3545
4620
Isolated transformer
NO
On/off grid switching
STS
Protection
Outdoor IP54
Working temperature
-20~55℃(>45℃derating)
Relative humidity
0~95% ( (no condensing)
Cooling
Intelligent air cooling (intelligent heating optional )
Max working altitude(m)
4000(>2000 derating)
Display
Touch screen
Communication
RS485、CAN、LAN
Communication Protocol
Modbus-RTU、Modbus-TCP、CAN2.0B
Application
LiFePO4 Battery 100kWh, 200kWh, 300kWh with AC Power Output GRES Integrated Battery Energy Storage System
Peak and frequency regulation, smoothing new energy generation;
Industrial and commercial demand management, peak shaving;
Power quality improving, and backpower supply at user side;Mobile energy storage, electric rescue;
Building microgrid system.
Successful Cases
LiFePO4 Battery 100kWh, 200kWh, 300kWh with AC Power Output GRES Integrated Battery Energy Storage System
Our GRES integrated BESS has been sold to Europe (Germany, Italy, Netherland, Poland, UK, Bulgaria, Czech, Spain etc), Asia (Thailand, Indonesia, Singapore etc), Africa (Ethiopia, South Africa, Zambia, Chad etc)
Shipping Timeframes: All orders are processed within 2-5 business days (excluding weekends and holidays). After your order has been processed, the estimated delivery time is before 20 Jan, 2025, depending on customs, Please note that due to high demand, some items may experience longer shipping times, which will be communicated at order confirmation email.
Order Processing Time: Please allow 2-5 business days for us to process your order before it is shipped . Orders placed after 16:00 on Fridays, or during weekends and public holidays, will begin processing on the next business day. Processing times may be extended during peak seasons or sales events.
Manufacturing Time: Some products needs manufacturing time, the manufacturing process will take approximately 10-30 business days depending on the product. This timeframe may vary depending on the complexity of the product and current demand. but this will be communicated with you during order confirmation.
Returns and Exchanges: We offer a 30-day return policy for most items. If you are not completely satisfied with your purchase, you may return it within 30 days of receipt for a refund or exchange. Items must be unused, in their original packaging, and accompanied by proof of purchase. Return shipping costs are the responsibility of the customer, unless the item was damaged or defective upon arrival.
0
0 Overall Rating
5
0%
0
4
0%
0
3
0%
0
2
0%
0
1
0%
0
Review this product
For you to write a review, you need to login first
Afrimart Online stands as Africa's foremost e-commerce hub, featuring an expansive array of product categories spanning electronics, machinery, toys, furniture, and more. Committed to excellence, our platform delivers swift and streamlined logistics and customs clearance solutions, offering a comprehensive one-stop service for cross-border imports.
Leveraging over three decades of international trade expertise, we ensure a seamless and hassle-free importing experience, providing top-tier products at competitive prices to meet the diverse needs of African consumers.
At Afrimart, we strive to process all orders promptly. Once the payment has been successfully cleared into our account, your order will be processed within 2 to 5 business days. Please note that this processing time excludes weekends and public holidays.
Following the processing of your order, the estimated delivery lead time ranges between 35 to 60 days. However, please be aware that this timeframe is subject to variations due to potential delays in shipping and customs clearance. While we aim to adhere to the original delivery schedule, unforeseen circumstances may occasionally extend the delivery window beyond the anticipated 35 to 60 days.
In the event of high demand or other factors leading to longer shipping times for certain items, we will communicate any expected delays during the initial order confirmation. We appreciate your understanding and patience as we work to ensure your order arrives as swiftly as possible.