π Important:
All orders, emails, and quotations will be processed and responded to once we reopen on 3rd January 2025.
Thank you for your understanding and patience!
π Festive Closing Notice:
We will be closed from 21st December 2024 to 3rd January 2025.
Wishing you a joyous holiday season! π
Hot filament chemical vapor deposition (HFCVD) has many advantages such as mature technology and simple equipment. It is one of the most widely used methods for preparing diamond thin films in industry. Designed for the synthesis of nanodiamond coatings, CVD diamond films, microcrystalline CVD diamond coatings, graphene, carbon nanotubes (CNTs) and various other thin film coatings. As the hardest substance in all known materials, diamond also has high thermal conductivity, high elastic modulus, good wear resistance, corrosion resistance, low friction coefficient and chemical stability, and is an excellent material for cutting. The equipment includes a reaction chamber, a support system, a water system, a gas system, and an automatic control system. The equipment is compact in structure and reasonable in layout. After years of equipment research and development by the engineer team, repeated deliberation, many experiments, combined with the computer-aided design system, have been checked and verified countless times. The equipment has excellent deposition performance and reliable safety. This product is an excellent device integrating energy saving, reliability, convenience and intelligence.
HFCVD Product features:
This product is a double-layer stainless steel cavity structure, with a compact and reasonable structure;
This product is divided into two parts: the upper stage and the lower stage. In addition to supporting the reaction chamber, the lower stage is also used to arrange gas valve, water pipeline and various control components. Arrange display panels and power supply devices on the bench to reasonably shield circuit interference;
This product fully disperses the cooling water channel layout (the upper cover of the cavity, the upper and lower layers of the cavity body and the bottom plate, as well as the hot wire elastic device, etc.). Water pumps, water pipes, intelligent monitoring flow meters, water manifolds, etc. are all closed circulation systems.
The gas circuit combination of this product is mainly composed of process gas supply system and vacuum system, reasonable distribution of gas pipelines, effective use of available space, real-time monitoring and precise control of gas flow and pressure.
This product uses a two-stage chip vacuum pump, and the pumping speed is stable at 65m3/h. The ultimate absolute vacuum full pressure is 0.5Pa, and the protection level is IP54.
HFCVD Technical indicators and characteristics:
Vacuum chamber
Structure: cylindrical + upper cover
Material: 304 high-quality stainless steel
Cavity size:Ξ¦640x320mm
Power supply:
AC220V / Three-phase 380V 30KW
Temperature control
Low voltage and high current DC power supply with hot wire temperature up to 2500Β°C.
Deposition substrate surface: about 600β
Cavity wall temperature: <60β
Temperature control accuracy: 0.1β
Temperature measurement system
Far infrared optical temperature measurement + thermocouple monitoring
Hot wire device:
Constant tension array geometry, molybdenum wire, copper feedthrough, tungsten wire bond processing for easy adjustment and maintenance
Observation window
Main observation window Ο190mm Auxiliary observation window Ο45mm
Two-stage rotary vane pump + high vacuum valve combination (safety valve, flow sensor, regulating valve...), digital display composite vacuum gauge,
Maximum pumping speed: 65 m3/h
Equipment pressure maintenance: 12 hours after the pump is stopped, the vacuum is less than or equal to 10Pa;
Exhaust port CF40 Exhaust port KF16
Operating system:
PLC+touch screen man-machine interface semi-automatic control system;
Security system
Alarm and protection: alarm and implement corresponding protection measures for abnormal conditions such as water shortage, overcurrent and overvoltage, and open circuit of pumps and electrodes; perfect logic program interlock protection system;
Footprint size
(Host) L1800ΓW1150ΓH1550(mm).
Total Weight
600kg
Shipping Timeframes: All orders are processed within 2-5 business days (excluding weekends and holidays). After your order has been processed, the estimated delivery time is before 26 Feb, 2025, depending on customs, Please note that due to high demand, some items may experience longer shipping times, which will be communicated at order confirmation email.
Order Processing Time: Please allow 2-5 business days for us to process your order before it is shipped . Orders placed after 16:00 on Fridays, or during weekends and public holidays, will begin processing on the next business day. Processing times may be extended during peak seasons or sales events.
Manufacturing Time: Some products needs manufacturing time, the manufacturing process will take approximately 10-30 business days depending on the product. This timeframe may vary depending on the complexity of the product and current demand. but this will be communicated with you during order confirmation.
Returns and Exchanges: We offer a 30-day return policy for most items. If you are not completely satisfied with your purchase, you may return it within 30 days of receipt for a refund or exchange. Items must be unused, in their original packaging, and accompanied by proof of purchase. Return shipping costs are the responsibility of the customer, unless the item was damaged or defective upon arrival.
0
0 Overall Rating
5
0%
0
4
0%
0
3
0%
0
2
0%
0
1
0%
0
Review this product
For you to write a review, you need to login first
Afrimart Online stands as Africa's foremost e-commerce hub, featuring an expansive array of product categories spanning electronics, machinery, toys, furniture, and more. Committed to excellence, our platform delivers swift and streamlined logistics and customs clearance solutions, offering a comprehensive one-stop service for cross-border imports.
Leveraging over three decades of international trade expertise, we ensure a seamless and hassle-free importing experience, providing top-tier products at competitive prices to meet the diverse needs of African consumers.
At Afrimart, we strive to process all orders promptly. Once the payment has been successfully cleared into our account, your order will be processed within 2 to 5 business days. Please note that this processing time excludes weekends and public holidays.
Following the processing of your order, the estimated delivery lead time ranges between 35 to 60 days. However, please be aware that this timeframe is subject to variations due to potential delays in shipping and customs clearance. While we aim to adhere to the original delivery schedule, unforeseen circumstances may occasionally extend the delivery window beyond the anticipated 35 to 60 days.
In the event of high demand or other factors leading to longer shipping times for certain items, we will communicate any expected delays during the initial order confirmation. We appreciate your understanding and patience as we work to ensure your order arrives as swiftly as possible.