Quantity | Price |
---|
Introduction of the Potato Chips Production Line:
This automatic potato chips production line is specially designed for processing potatoes into delicious potato chips, potato crisps or French fries. Apart from making potato chips and French fries, you could also make Frozen French fries (equipped with a freezer).
The production capacities of our potato chips processing line are 100kg/h, 200-260kg/h, 350-400kg/h, and 500-800kg/h.
It has some advantage such as large capacity, large output, a high degree of automatic, labor-saving and high return rate, etc.
Machine Technology
Technical Data for 500kg/h Automatic Potato Chips Making Machine
– Length of the entire production line is about 58 meters.
– Water consumption: 1 cubic meters per hour.
– Workers needed are about 4-6 people.
– Land needed to install potato chips production line is 200 square meters.
– Electric consumption is 300 Kw/h.
– Oil consumption is 25-30 liters per hour (Mixed oil for palm oil).
NO. | Name Equipments | Power | Weight | Size |
1 | Potato Washing &
Peeling Machine | 4.5KW | 630 KG | 3400*900*1400 mm |
2 | Potato Slicing Machine | 1.2KW | 120 KG | 950*800*950 mm |
3 | Impurity Removal | 2.3KW | 500 KG | 2600*1000*1300mm |
4 | Rinsing Machine | 6.8KW | 800 KG | 4000*1200*1300mm |
5 | Blanching Machine | 120KW | 1400 KG | 5000*1200*1300mm |
6 | Vibrating Dewatering Machine | 0.5KW | 230 KG | 1800*1000*1300mm |
7 | Electrical Frying Machine | 180KW | 1500 KG | 5000*1100*2200mm |
8 | Vibrating Deoiling Machine | 0.5KW | 230 KG | 1800*1000*1300mm |
9 | Potato Chips Freezer | 100KW | 5000KG | 8500*3300*3000mm |
10 | Potato Chips Packing | 6KW | 1200KG | 3000*3000*2600mm |
At Afrimart, we strive to process all orders promptly. Once the payment has been successfully cleared into our account, your order will be processed within 2 to 5 business days. Please note that this processing time excludes weekends and public holidays.
Following the processing of your order, the estimated delivery lead time ranges between 35 to 60 days. However, please be aware that this timeframe is subject to variations due to potential delays in shipping and customs clearance. While we aim to adhere to the original delivery schedule, unforeseen circumstances may occasionally extend the delivery window beyond the anticipated 35 to 60 days.
In the event of high demand or other factors leading to longer shipping times for certain items, we will communicate any expected delays during the initial order confirmation. We appreciate your understanding and patience as we work to ensure your order arrives as swiftly as possible.