Industrial Tumble Dryer Energy Saving (100kg-130kg)
The Industrial Tumble Dryer Energy Saving (100kg-130kg) is a high-quality, efficient solution for drying linens. This industrial dryer is designed to save energy and time while ensuring effective and precise drying results. With advanced features and a durable structure, it is the perfect choice for commercial laundry facilities, hotels, and hospitals.
Key Features:
Computerized control for precise time, temperature, and humidity settings
Multiple automatic programs for efficient drying
Forward wind design for faster and more even drying
Dual heat sinks for heating and heat recovery
Dual frequency converter control for over 40% energy savings
Automatic door opening and material tilting for full automation
Programmable time, temperature, and humidity settings
English language option
Quick 30-45 minute cycle time
Simple and easy control panel
Strong and safe structure
Easy maintenance
Temperature control
Optional humidity control
Specifications:
Mode
Unit
HBG-100
HBG-130
Dry capacity
kg
100
130
Basket Size
mm
Φ1480x1200
Φ1500x1000
Dry time
min
30-40
30-40
Motor power
kw
2.2
3.0
Inverter power
kw
5.5kw 3.5kw
5.5kw 3.5kw
Fan Power
kw
5.5
5.5
Steam consumption
kg/h
120
140
Steam pressure
Mpa
0.4-0.6
0.4-0.6
Right elevation
Left elevation
Back elevation
High power engine,
Customized for industrial Dryer
Button panel,
easy operate,
tem/time control
High grade Stainless Steel 304
High quality and strong Bearing from Tanwai China
Strict professional electric box,with two inverter
two big gas burner
Shipping Timeframes: All orders are processed within 2-5 business days (excluding weekends and holidays). After your order has been processed, the estimated delivery time is before 24 Apr, 2025, depending on customs, Please note that due to high demand, some items may experience longer shipping times, which will be communicated at order confirmation email.
Order Processing Time: Please allow 2-5 business days for us to process your order before it is shipped . Orders placed after 16:00 on Fridays, or during weekends and public holidays, will begin processing on the next business day. Processing times may be extended during peak seasons or sales events.
Manufacturing Time: Some products needs manufacturing time, the manufacturing process will take approximately 10-30 business days depending on the product. This timeframe may vary depending on the complexity of the product and current demand. but this will be communicated with you during order confirmation.
Returns and Exchanges: We offer a 30-day return policy for most items. If you are not completely satisfied with your purchase, you may return it within 30 days of receipt for a refund or exchange. Items must be unused, in their original packaging, and accompanied by proof of purchase. Return shipping costs are the responsibility of the customer, unless the item was damaged or defective upon arrival.
0
0 Overall Rating
5
0%
0
4
0%
0
3
0%
0
2
0%
0
1
0%
0
Review this product
For you to write a review, you need to login first
At Afrimart, we strive to process all orders promptly. Once the payment has been successfully cleared into our account, your order will be processed within 2 to 5 business days. Please note that this processing time excludes weekends and public holidays.
Following the processing of your order, the estimated delivery lead time ranges between 35 to 60 days. However, please be aware that this timeframe is subject to variations due to potential delays in shipping and customs clearance. While we aim to adhere to the original delivery schedule, unforeseen circumstances may occasionally extend the delivery window beyond the anticipated 35 to 60 days.
In the event of high demand or other factors leading to longer shipping times for certain items, we will communicate any expected delays during the initial order confirmation. We appreciate your understanding and patience as we work to ensure your order arrives as swiftly as possible.