Quantity | Price |
---|
Introducing the Big Size Bronze German Draft Beer Making Machine, a top-tier brewhouse system designed for brewpubs, bars, and restaurants. This versatile equipment allows you to brew exceptional beer with ease.
Comprehensive Brewhouse System: The setup includes a mash tank, lauter tank, kettle, whirlpool tank, hops adding system, and all necessary pipelines. This complete system ensures efficient brewing processes.
Flexible Vessel Combinations: Choose from various configurations to suit your brewing needs:
Multiple Heating Methods: The brewhouse offers three heating options for maximum flexibility:
High-Quality Materials:
Platform Design: The platform is constructed from SS304, ensuring a robust and safe working environment.
Agitation Options: The top-mounted agitator system enhances mixing efficiency, while a bottom-mounted option is available if preferred.
Advanced Control Systems: Choose between PLC automatic control, semi-automatic control, or manual control for tailored operation.
The Big Size Bronze German Draft Beer Making Machine is the ideal solution for any establishment looking to produce high-quality beer. With its robust construction and flexible configurations, this brewhouse system will meet all your brewing needs.
In conclusion, if you want a reliable and efficient brewing system, this machine is an excellent investment. Brew your favorite beers with confidence and precision!
Technical Data Related
1.Malt Milling System | Mill machine | Stainless steel/Carbon steel |
Grist case | Stainless steel | |
Flexible conveyor | Outer PPR or Stainless steel | |
2.Brewhouse System | Mashtun | -Inner:3mm;outer:2mm -Motor agitation -Steam jackets/Electric elements/Fire direct heating |
Lauter tun | -Inner:3mm;outer:2mm -Rack system; -False bottom filter | |
Kettle tun | -Inner:3mm;outer:2mm -Steam jackets/Electric elements/Fire direct heating | |
Whirlpool tun | -Inner:3mm;outer:2mm -Side tangent whirlpool inlet | |
Hot water tank | -Inner:3mm;outer:2mm -Steam jackets/Electric elements/Fire direct heating | |
Accessories | -Mash pump;;Heat exchange plate;Hop back system; Brewhouse Pipes; | |
3.Fermentation System | Fermentation tank | -Pressure:3Bar; -Inner:3mm;outer:2mm;with insulation; -Cooling jackets; |
Accessories | Yeast Saving Tank; | |
4.Cooling System | Glycol water tank | -Inner:3mm;outer:2mm |
Accessories | Chiller; Glycol water pump; Pipes & Valves; | |
5.CIP System | Acid tank | Pump; Pipes & Valves |
Caustic tank | ||
Trolley | ||
Accessories of the CIP System | ||
6.Control System | -Automatic/Semi-auto | |
7.Filtering System | Candle type diatomite filter/Membrane filter/Bag filter | |
Bright beer tank | Double-layer with insulation; | |
8.Filling System | Glass bottle line | -Capacity:800-1200 BPH -Washing heads:8;Filling heads:8;Capping heads:3 -Optional: Capacity:1500-2000 BPH -Washing heads:16;Filling heads:16;Capping heads:6 |
Canning line | Capacity:1000-1500 CPH -Filling heads:12;Capping heads:1 | |
Keg system | Keg filling machine;Keg washing machine;Keg washing and filling unity machine; |
Afrimart Online stands as Africa's foremost e-commerce hub, featuring an expansive array of product categories spanning electronics, machinery, toys, furniture, and more. Committed to excellence, our platform delivers swift and streamlined logistics and customs clearance solutions, offering a comprehensive one-stop service for cross-border imports.
Leveraging over three decades of international trade expertise, we ensure a seamless and hassle-free importing experience, providing top-tier products at competitive prices to meet the diverse needs of African consumers.
At Afrimart, we strive to process all orders promptly. Once the payment has been successfully cleared into our account, your order will be processed within 2 to 5 business days. Please note that this processing time excludes weekends and public holidays.
Following the processing of your order, the estimated delivery lead time ranges between 35 to 60 days. However, please be aware that this timeframe is subject to variations due to potential delays in shipping and customs clearance. While we aim to adhere to the original delivery schedule, unforeseen circumstances may occasionally extend the delivery window beyond the anticipated 35 to 60 days.
In the event of high demand or other factors leading to longer shipping times for certain items, we will communicate any expected delays during the initial order confirmation. We appreciate your understanding and patience as we work to ensure your order arrives as swiftly as possible.