Quantity | Price |
---|
PRODUCT OVERVIEW
Customizable household waste, general waste and municipal solid waste incinerator
Customizable household waste, general waste and municipal solid waste incinerator(HTP Waste Incinerator) is based on the mainstream domestic waste treatment processes, combined with the current situation of domestic waste treatment, and has been developed through years of research and development experiments and data accumulation. Based on the principle of pyrolysis and gasification,the equipment converts solid domestic waste into 90% gas and 10% ash, so as to achieve the goal of reducing and harmless treatment of domestic waste.
PRODUCT DISPLAY
HTP-10T
HTP-15T
HTP-20T
00:00
00:55
HTP Waste Incinerator has obtained 5 invention patents and 6 utility model patents.
PRODUCT ADVANTAGES
Technology + Structure + Control
HYHH is committed to serve the environmental protection, and root in continued innovation in products and technologies.
01 Rapid pyrolysis total gasification technology
02 Improved oxygen supply control technology
03 Low nitrate reaction technology
04 Homogeneous combustion technology
05 Waste heat utilization technology
06 Combined flue gas ultra-clean technology
07 Fully-closed reaction technology
08 Intelligent control technology
Aiming at the characteristics of small output, complex composition and large fluctuation of domestic waste in countyside, solving the problem of small-sacle domestic waste treatment in the whole process. Through the links of standing, crushing, magnetic separation and screening, the garbage is homogenized to ensure the stability of the garbage into the furnace. Can be applied to a variety of materials : such as rubber and plastic, paper, knitting, plastic, etc.
HTP Waste Incinerator is an integrated design with double-chamber that effectively increases the heat storage capacity. Hot air from the waste heat recovery is used to supply hot oxygen in the post-combustion chamber for fuel-free operation. The reaction process has low nitrate, no denitrification treatment, and reduced operation and construction costs. Operating costs are lower than other similar products.
The Incinerator’s volume reduction rate of the waste can reach more than 95%, and has a mass reduction rate over 90%.
There is no odor leakage in the fully-closed micro-negative pressure state of the unloading workshop. The collected leachate is sprayed back into the incinerator to achieve “zero” discharge of wastewater. Two stages of deacidification and dust removal achieve ultra-clean emission of flue gas. Flue gas emissions are in line with local standards. The generated hot water can be used for heating to achieve resource utilization.
The central control room enables the start-up and stop of most devices, automatic water replenishment and dosing of devices. It is equipped with a variety of online instruments such as temperature, pressure and oxygen content to monitor the operational status of the system in real time.
PRODUCT PARAMENTERS
Model | HTP-3T | HTP-5T | HTP-10T | HTP-15T | HTP-20T |
Process | High Temperature Pyrolytsis | ||||
Recommended Operational Temperature (℃) | 850~1100 | 850~1100 | 850~1100 | 850~1100 | 850~1100 |
Gas Retention Time (s) | ≥2s | ≥2s | ≥2s | ≥2s | ≥2s |
Capacity (t/d) | 3 | 5 | 10 | 15 | 20 |
Installed Power (kW) | 50 | 85 | 135 | 158 | 186 |
Control Method | PLC Intelligentize/touch screen/buttons | ||||
Area of Equipment (m2) | 100 | 170 | 200 | 300 | 350 |
Area of The Factory (m2) | 250 | 300 | 500 | 750 | 850 |
Weight (t) | 30 | 45 | 50 | 65 | 70 |
APPLICATION SCOPE
Decentralized point source domestic waste treatment and reuse, such as towns,villages, islands, expressway service areas, infected areas, logistics concentration areas, construction sites.
SUCCESSFUL PROJECT
Domestic waste incinerator project
Household waste incinerator project
Flue gas treatment system
At Afrimart, we strive to process all orders promptly. Once the payment has been successfully cleared into our account, your order will be processed within 2 to 5 business days. Please note that this processing time excludes weekends and public holidays.
Following the processing of your order, the estimated delivery lead time ranges between 35 to 60 days. However, please be aware that this timeframe is subject to variations due to potential delays in shipping and customs clearance. While we aim to adhere to the original delivery schedule, unforeseen circumstances may occasionally extend the delivery window beyond the anticipated 35 to 60 days.
In the event of high demand or other factors leading to longer shipping times for certain items, we will communicate any expected delays during the initial order confirmation. We appreciate your understanding and patience as we work to ensure your order arrives as swiftly as possible.