Quantity | Price |
---|
High Temperature 1500kg Industrial Electric Scrap Cast Iron Foundry Smelting Reheating Crucible Copper Melt Induction Furnace
1.There is a large leakage of magnetic flux during the operation of the aluminum-clad induction furnace. The case (aluminum) will be oxidized strongly under high temperature conditions, which will result in the decrease of metal toughness.If the aluminum shell is not thick enough, it will deform and be damaged.
3.The copper tube of the sensor should be of good quality.This will save electricity.Long service life. If not good use of copper pipe.It can cause the device to consume a lot of power.There is a breakdown and maintenance is inconvenient.
2.Good insulation treatment gives workers safe work and production, and the furnace will not leak electricity even if it works for many years.If power leakage is found and needs to be stopped for maintenance, it will be very troublesome and will also bring economic losses to the factory.
Product Advantage
1.Main control board built-in multifunctional protection system - the complete chenghua veneer, rectifier, inverter, protection and starting control into an organic whole, intermediate frequency furnace control board over voltage, over current, load pressure limiting, current limiting, frequency sweep, frequency, intermediate frequency lock detection, restart, power, system and other status indication, make the medium frequency furnace has high reliability, high precision, easy to debug, less relay component, adjust the intuitive, easy maintenance.
2.Water pipes need to be of good quality.So that it is not easy to age leakage.Make the equipment safer.
3.Copper bars need to be of high quality so that they can save energy and electricity.
At Afrimart, we strive to process all orders promptly. Once the payment has been successfully cleared into our account, your order will be processed within 2 to 5 business days. Please note that this processing time excludes weekends and public holidays.
Following the processing of your order, the estimated delivery lead time ranges between 35 to 60 days. However, please be aware that this timeframe is subject to variations due to potential delays in shipping and customs clearance. While we aim to adhere to the original delivery schedule, unforeseen circumstances may occasionally extend the delivery window beyond the anticipated 35 to 60 days.
In the event of high demand or other factors leading to longer shipping times for certain items, we will communicate any expected delays during the initial order confirmation. We appreciate your understanding and patience as we work to ensure your order arrives as swiftly as possible.