The twin-shaft shredder is mainly used for the shredding and processing of solid wastes such as bulk garbage, domestic waste, industrial waste, electronic waste, waste plastic, and scrap metal, and realizes volume reduction and secondary recycling.
Working principle
The material enters the box through the feeding system, the box carries the shredding blade, and the material is shredded into small pieces through the comprehensive action of the shredding blade, such as tearing, squeezing, and shearing, and is discharged from the lower box.
Structure Introduction
Model
Power (kw)
Rotating speed (r/min)
Capaticy (t)
Cutter diameter (mm)
Reducer
Dimensions (m)
ZS400
4-11*2
12-25
1.5-1
Ο200
250*2
1.8*1.5*1.6
ZS600
4-15*2
10-24
2-3
Ο200
350*2
2.6*2*1.9
ZS800
4-22*2
10-24
3-4
Ο360
500*2
2.8*2*1.9
ZS1000
6-30*2
8-22
4-5
Ο400
600*2
3*2*1.9
ZS1200
6-37*2
8-22
6-10
Ο450
650*2
3.4*2.2*2.2
ZS1400
6-45*2
2-24
10-18
Ο520
750*2
4*3*2.4
ZS1600
6-55*2
8-24
10-18
Ο560
750*2
5*3*2.4
ZS1900
6-75*2
6-20
14-22
Ο650
800*2
6*3.5*2.5
ZS2200
6-110*2
6-20
18-26
Ο750
850*2
7.5*4*4.5
Applicable materials
The shredder can easily pre-shred: materials; electronic waste; metal; aluminum cans; wood; waste tires, rubber;Waste home appliances; waste paper; textiles; animal bones and organic waste.
Blade selection
According to the material characteristics, choose different knife rollers to enhance the shredding effect and increase the output
1. The 10mm-20mm blade is suitable for thinner and more easily broken products, such as medical servers and circuit boards.
2. 40mm-50mm thick blade are commonly used for general products, such as plastic products, films, plastic barrels, tires, wood boards, etc.
3. Blades above 75mm are suitable for thicker plastic or metal composite products, as refrigerators, metal cans , with a thickness of less than 10m.
Details create quality
High-quality blades
By studying the thickness, shape, arrangement order, etc., a unique rotary blade is designed for processing, with strong shearing force and sharp blade. With special alloy steel tools, it can easily crush more than 50 materials.
Large feeding port
The combined structure of the extra-thick plate precision processing frame, the large-angle hexagonal column rotating shaft, and the large-diameter sturdy input hopper, so you can put large-scale raw materials.
High-strength and stable bearings
The spindle adopts 40cr quenching and tempering to enhance the stability of the spindle. The bearing seat can be easily maintained and replaced by removing the blades and other parts. The sealing structure can block the contact of broken objects and grease, handling of liquid materials can also protect the bearings and gears.
Intelligent electrical control system
The electrical control system adopts branded electrical components and an intelligent control system. It is equipped with protections such as main motor start-up protection, automatic loosening of feeding and anti-overload, motor jam and overload, automatic reverse reversal and re-shredding of materials (the number of reversal is adjustable)
Design Scheme
We can plan the production line for you according to your raw materials and site, such as waste sorting production line,Waste recycling projects such as plastic crushing and cleaning production lines, metal crushing and sorting production lines, etc.
Shipping Timeframes: All orders are processed within 2-5 business days (excluding weekends and holidays). After your order has been processed, the estimated delivery time is before 20 Feb, 2025, depending on customs, Please note that due to high demand, some items may experience longer shipping times, which will be communicated at order confirmation email.
Order Processing Time: Please allow 2-5 business days for us to process your order before it is shipped . Orders placed after 16:00 on Fridays, or during weekends and public holidays, will begin processing on the next business day. Processing times may be extended during peak seasons or sales events.
Manufacturing Time: Some products needs manufacturing time, the manufacturing process will take approximately 10-30 business days depending on the product. This timeframe may vary depending on the complexity of the product and current demand. but this will be communicated with you during order confirmation.
Returns and Exchanges: We offer a 30-day return policy for most items. If you are not completely satisfied with your purchase, you may return it within 30 days of receipt for a refund or exchange. Items must be unused, in their original packaging, and accompanied by proof of purchase. Return shipping costs are the responsibility of the customer, unless the item was damaged or defective upon arrival.
0
0 Overall Rating
5
0%
0
4
0%
0
3
0%
0
2
0%
0
1
0%
0
Review this product
For you to write a review, you need to login first
Afrimart Online stands as Africa's foremost e-commerce hub, featuring an expansive array of product categories spanning electronics, machinery, toys, furniture, and more. Committed to excellence, our platform delivers swift and streamlined logistics and customs clearance solutions, offering a comprehensive one-stop service for cross-border imports.
Leveraging over three decades of international trade expertise, we ensure a seamless and hassle-free importing experience, providing top-tier products at competitive prices to meet the diverse needs of African consumers.
At Afrimart, we strive to process all orders promptly. Once the payment has been successfully cleared into our account, your order will be processed within 2 to 5 business days. Please note that this processing time excludes weekends and public holidays.
Following the processing of your order, the estimated delivery lead time ranges between 35 to 60 days. However, please be aware that this timeframe is subject to variations due to potential delays in shipping and customs clearance. While we aim to adhere to the original delivery schedule, unforeseen circumstances may occasionally extend the delivery window beyond the anticipated 35 to 60 days.
In the event of high demand or other factors leading to longer shipping times for certain items, we will communicate any expected delays during the initial order confirmation. We appreciate your understanding and patience as we work to ensure your order arrives as swiftly as possible.