π Important:
All orders, emails, and quotations will be processed and responded to once we reopen on 3rd January 2025.
Thank you for your understanding and patience!
π Festive Closing Notice:
We will be closed from 21st December 2024 to 3rd January 2025.
Wishing you a joyous holiday season! π
Wire rope electric hoist refers to the electric hoist with wire rope to pull the rope, which is mainly composed of motor, transmission mechanism, reel device, wire rope and limit switch. It is widely used in factories, cargo stations, docks, power stations, logging yards and other places.
2. The control box can cut off the main circuit in an emergency to ensure the safe operation of the electric hoist.
3. Use high quality lifting wire rope, durable.
4. The lifting motor adopts tapered rotor brake asynchronous motor, without external brake, and integrates power and braking force.
Load Capacity(t)
0.5
1
2
3
5
10
Fiducial Working Level
M3
M3
M3
M3
M3
M3
Hoisting Height(m)
6/9/12/
18/24/30
6/9/12/
18/24/30
6/9/12/
18/24/30
6/9/12/
18/24/30
6/9/12/
18/24/30
6/9/12/
18/24/30
Hoisting Speed(m/min)
8(8/0.8)
8(8/0.8)
8(8/0.8)
8(8/0.8)
8(8/0.8)
7(7/0.7)
Operating Speed(m/min)(Suspended Type)
20(20/6.7)
30(30/10)
20(20/6.7)
30(30/10)
20(20/6.7)
30(30/10)
20(20/6.7)
30(30/10)
20(20/6.7)
30(30/10)
20(20/6.7)
30(30/10)
Multiplying Powerof Chain Wheel
2/1
2/1
2/1
2/1
2/1
4/2
Type and Power ofHoisting Electric Motor (KW)
ZDY11-4(0.8)
ZDY22-4(1.5)
ZDY31-4(3)
ZDY32-4(4.5)
ZDY41-4(7.5)
ZDY51-4(13)
ZDSI-0.2/0.8
(0.2/0.8)
ZDSI-0.2/1.5
(0.2/1.5)
ZDSI-0.4/3
(0.4/3)
ZDSI-0.4/4.5
(0.4/4.5)
ZDSI-0.8/7.5
(0.8/7.5)
ZDSI-1.5/1.3
(1.5/1.3)
Motor Type and Power(Suspended Type)(kw)
ZDY11-4(0.2)
ZDY11-4(0.2)
ZDY12-4(0.4)
ZDY12-4(0.4)
ZDY21-4(0.8)
2*ZDY21-4(0.8)
Lever of Protection
IP44 IP54
IP44 IP54
IP44 IP54
IP44 IP54
IP44 IP54
IP44 IP54
Type of I-Steel Track
116a-128b
116a-128b
120a-145c
120a-145c
125a-163c
140a-163c
Min. Turning Radius(m)
1/1/1/
1.8/2.5/3.2
1/1/1.2/
1.8/2.5/3.2
1.2/1.2/1.5/2.0/2.8/3.5
1.2/1.2/1.5/
2.0/2.8/3.5
1.5/1.5/1.5/2.5/3.0/4.0
1.5/1.5/1.5/
2.5/3.0/4.0
Net Weight(kg)
135/140/155/175/180/185
190/195/205/220/235/255
250/265/300/320/340/360
320/340/350/380/410/440
590/630/650/700/750/800
820/870/960/
1015/1090/1125
Details Images
Shipping Timeframes: All orders are processed within 2-5 business days (excluding weekends and holidays). After your order has been processed, the estimated delivery time is before 20 Feb, 2025, depending on customs, Please note that due to high demand, some items may experience longer shipping times, which will be communicated at order confirmation email.
Order Processing Time: Please allow 2-5 business days for us to process your order before it is shipped . Orders placed after 16:00 on Fridays, or during weekends and public holidays, will begin processing on the next business day. Processing times may be extended during peak seasons or sales events.
Manufacturing Time: Some products needs manufacturing time, the manufacturing process will take approximately 10-30 business days depending on the product. This timeframe may vary depending on the complexity of the product and current demand. but this will be communicated with you during order confirmation.
Returns and Exchanges: We offer a 30-day return policy for most items. If you are not completely satisfied with your purchase, you may return it within 30 days of receipt for a refund or exchange. Items must be unused, in their original packaging, and accompanied by proof of purchase. Return shipping costs are the responsibility of the customer, unless the item was damaged or defective upon arrival.
0
0 Overall Rating
5
0%
0
4
0%
0
3
0%
0
2
0%
0
1
0%
0
Review this product
For you to write a review, you need to login first
Afrimart Online stands as Africa's foremost e-commerce hub, featuring an expansive array of product categories spanning electronics, machinery, toys, furniture, and more. Committed to excellence, our platform delivers swift and streamlined logistics and customs clearance solutions, offering a comprehensive one-stop service for cross-border imports.
Leveraging over three decades of international trade expertise, we ensure a seamless and hassle-free importing experience, providing top-tier products at competitive prices to meet the diverse needs of African consumers.
At Afrimart, we strive to process all orders promptly. Once the payment has been successfully cleared into our account, your order will be processed within 2 to 5 business days. Please note that this processing time excludes weekends and public holidays.
Following the processing of your order, the estimated delivery lead time ranges between 35 to 60 days. However, please be aware that this timeframe is subject to variations due to potential delays in shipping and customs clearance. While we aim to adhere to the original delivery schedule, unforeseen circumstances may occasionally extend the delivery window beyond the anticipated 35 to 60 days.
In the event of high demand or other factors leading to longer shipping times for certain items, we will communicate any expected delays during the initial order confirmation. We appreciate your understanding and patience as we work to ensure your order arrives as swiftly as possible.