1) Automatic rotary packing machine adopt precision indexing device and PLC to control each action and working station to make sure the machine operates easily and does accurately. 2) The speed of this machine is adjusted by frequency conversion with the range, and the actual speed depends on type of products and pouch.. 3) Automatic checking system can check bag situation, filling and sealing situation. The system shows 1.no bag feeding, no filling and no sealing. 2.no bag opening/opening error, no filling and no sealing 3.no filling, no sealing.. 4) The product and pouch contact parts are adopted stainless steel and other advanced material to guarantee the hygiene of products.
We can customize the suitable one for you according to your requiredment.
Powder type: milk powder, glucose, monosodium glutamate, seasoning, washing powder, chemical materials, fine white sugar, pesticide, fertilizer, etc.
Class of pickles, pickled cabbage, kimchi, pickled cabbage, radish, etc.
Various bag types are available:All type of heat sealable performed side seal bags,block bottom bags,zip-lock recloseable bags,stand-up pouch with or without spout,paper bags etc.
The Main Technical Parameters
Model
MR8-200/300RW
Bag Size
Width:80-210/200-300mm, Length:100-300/100-350mm
Filling Volume
5-2500g (Depending on type of products)
Capacity
30-60bags/min (The speed depends on type of products and packaging material used) 25-45bags/min (For zipper bag)
Package Accuracy
Error≤±1%
Total Power
2.5KW (220V/380V,3PH,50HZ)
Demension
1710*1505*1640 (L*W*H)
Weight
1480KGS
Compress Air Requirement
≥0.8m³/min supply by user
We can customize the suitable one for you according to your requiredment.
Just Tell us : Weight or Bag Size required.
Parts of Machine
Parts
PLC
Touch Screen
Frequency Conveter
Vacuum Pump
Printer
Main Motor
Temperature Controllor
Proximoty Swith
Magnetic Value
Cylinder
Brand
SIEMENS
SIEMENS
TOSHIBA
ORION
SHENG LONG
EVERGEAR
AISET
OMRON
FESTO
AIRTAC
Oringin
Germany
Germany
Japan
Japan
China
China
China
Japan
Germany
China
Can replace parts as needed
Work Process
Safety Measures
1.no bag feeding, no filling and no sealing.
2.no bag opening/open error, no filling and no sealing
3.no filling, no sealing
Product
Process
Station 1 Bag Feeding Station 2 Date Printing (option)and Open zipper bag Station 3 Open bag Station 4 Filling Materials Station 5,6,7 :Vibration,Air Removal,Nitrogen Filling,Close Zipper,Hole Punching,Heat Sealing Remark:No.5.6.7.Stations are based on customer requirements for adjusting. Station 8 Heat Sealing and Product Output
Stations are based on customer requirements for adjusting.
Shipping Timeframes: All orders are processed within 2-5 business days (excluding weekends and holidays). After your order has been processed, the estimated delivery time is before 12 Mar, 2025, depending on customs, Please note that due to high demand, some items may experience longer shipping times, which will be communicated at order confirmation email.
Order Processing Time: Please allow 2-5 business days for us to process your order before it is shipped . Orders placed after 16:00 on Fridays, or during weekends and public holidays, will begin processing on the next business day. Processing times may be extended during peak seasons or sales events.
Manufacturing Time: Some products needs manufacturing time, the manufacturing process will take approximately 10-30 business days depending on the product. This timeframe may vary depending on the complexity of the product and current demand. but this will be communicated with you during order confirmation.
Returns and Exchanges: We offer a 30-day return policy for most items. If you are not completely satisfied with your purchase, you may return it within 30 days of receipt for a refund or exchange. Items must be unused, in their original packaging, and accompanied by proof of purchase. Return shipping costs are the responsibility of the customer, unless the item was damaged or defective upon arrival.
0
0 Overall Rating
5
0%
0
4
0%
0
3
0%
0
2
0%
0
1
0%
0
Review this product
For you to write a review, you need to login first
Afrimart Online stands as Africa's foremost e-commerce hub, featuring an expansive array of product categories spanning electronics, machinery, toys, furniture, and more. Committed to excellence, our platform delivers swift and streamlined logistics and customs clearance solutions, offering a comprehensive one-stop service for cross-border imports.
Leveraging over three decades of international trade expertise, we ensure a seamless and hassle-free importing experience, providing top-tier products at competitive prices to meet the diverse needs of African consumers.
At Afrimart, we strive to process all orders promptly. Once the payment has been successfully cleared into our account, your order will be processed within 2 to 5 business days. Please note that this processing time excludes weekends and public holidays.
Following the processing of your order, the estimated delivery lead time ranges between 35 to 60 days. However, please be aware that this timeframe is subject to variations due to potential delays in shipping and customs clearance. While we aim to adhere to the original delivery schedule, unforeseen circumstances may occasionally extend the delivery window beyond the anticipated 35 to 60 days.
In the event of high demand or other factors leading to longer shipping times for certain items, we will communicate any expected delays during the initial order confirmation. We appreciate your understanding and patience as we work to ensure your order arrives as swiftly as possible.