Trapezoidal channel automatic vibrating concrete lining machine U shaped concrete automatic ditch channel lining deviceMain technical performance indicatorsAdapt to the site: the bottom of the canal, the slope of the canal, the highway, etc. can be used. Equipment specifications: According to the width of the working surface, the length of the fuselage can be customized.Equipment structure and working principleThe bottom lining machine consists of four parts: the feeding machine, the spreading machine, the screeding machine and the receiving frame. The loading machine is placed on the slope of the channel, the frame is connected with the booth of the spreader, and there is a walking wheel at the bottom of the frame, which does not need to be towed and automatically controls walking. The spreader, the trowel and the receiving frame are placed in parallel at the bottom of the channel and at a certain distance in the middle. The material is placed in the hopper of the loading machine by the tanker, and is fed into the hopper of the spreading machine with the belt, and then fed along the belt of the spreading machine. The material is introduced into the storage hopper through the baffle plate on the belt, and the vibrating plate is spread by the lower part of the rack. Evenly, it is smoothed by a trowel, and the face frame is manually closed.Molding machine featuresHydraulic propelling walking device, good molding effect.High-power vibrator, high density, smooth construction and surface.Generator, stable, low fuel consumption, low cost of use.The failure rate of the whole machine accessories is low.The control box adopts button control, which is easy to operate.The hopper is equipped with a screw
Shipping Timeframes: All orders are processed within 2-5 business days (excluding weekends and holidays). After your order has been processed, the estimated delivery time is before 21 Jan, 2025, depending on customs, Please note that due to high demand, some items may experience longer shipping times, which will be communicated at order confirmation email.
Order Processing Time: Please allow 2-5 business days for us to process your order before it is shipped . Orders placed after 16:00 on Fridays, or during weekends and public holidays, will begin processing on the next business day. Processing times may be extended during peak seasons or sales events.
Manufacturing Time: Some products needs manufacturing time, the manufacturing process will take approximately 10-30 business days depending on the product. This timeframe may vary depending on the complexity of the product and current demand. but this will be communicated with you during order confirmation.
Returns and Exchanges: We offer a 30-day return policy for most items. If you are not completely satisfied with your purchase, you may return it within 30 days of receipt for a refund or exchange. Items must be unused, in their original packaging, and accompanied by proof of purchase. Return shipping costs are the responsibility of the customer, unless the item was damaged or defective upon arrival.
0
0 Overall Rating
5
0%
0
4
0%
0
3
0%
0
2
0%
0
1
0%
0
Review this product
For you to write a review, you need to login first
Afrimart Online stands as Africa's foremost e-commerce hub, featuring an expansive array of product categories spanning electronics, machinery, toys, furniture, and more. Committed to excellence, our platform delivers swift and streamlined logistics and customs clearance solutions, offering a comprehensive one-stop service for cross-border imports.
Leveraging over three decades of international trade expertise, we ensure a seamless and hassle-free importing experience, providing top-tier products at competitive prices to meet the diverse needs of African consumers.
At Afrimart, we strive to process all orders promptly. Once the payment has been successfully cleared into our account, your order will be processed within 2 to 5 business days. Please note that this processing time excludes weekends and public holidays.
Following the processing of your order, the estimated delivery lead time ranges between 35 to 60 days. However, please be aware that this timeframe is subject to variations due to potential delays in shipping and customs clearance. While we aim to adhere to the original delivery schedule, unforeseen circumstances may occasionally extend the delivery window beyond the anticipated 35 to 60 days.
In the event of high demand or other factors leading to longer shipping times for certain items, we will communicate any expected delays during the initial order confirmation. We appreciate your understanding and patience as we work to ensure your order arrives as swiftly as possible.