The Carbon Steel Sand Dewatering Machine is designed for efficient dehydration of sand, widely used in the mining and metallurgy industries. Also known as the Sand Dehydrated Machine, it is made from stainless steel, ensuring rust resistance and a long service life. This machine is capable of continuously processing materials, making it highly efficient for various industrial applications.
Technical Parameters
Model
Diameter (Inch)
Sieve Area (m²)
Screen Mesh
Layer
Motor Power (kw)
B-16
16
0.0907
2-500
1-5
0.18
B-24
24
0.2289
0.25
1-5
0.25
B-30
30
0.4183
0.55
1-5
0.55
B-40
40
0.6359
1.1
1-5
1.1
B-48
48
0.9400
1.1
1-5
1.1
B-60
60
1.5386
1.5
1-5
1.5
B-72
72
2.2687
4
1-5
Customizable
Product Advantages
Durable Construction: Made entirely of stainless steel, the machine is rust-proof and designed to last longer.
High Efficiency: Ensures a high throughput with continuous operation.
Ease of Maintenance: Mirror polished surface for easy cleaning and maintenance.
Continuous Operation: Capable of continuous working, making it ideal for large-scale industrial applications.
Product Components
Dam-board: Ensures smooth discharge of the dehydrated sand from the outlet.
Frame with Net Rack and Screen Cloth: Supports the structure and holds the screen cloth for effective filtration.
Observation Hole: Allows operators to observe the motion of materials safely and easily.
Product Uses
This versatile sand dewatering machine is used in various industries for dehydration and separation:
Chemical Industry: Colophony, dope, industry leechdom, cosmetics, paint.
Abrasive Materials and China Industry: Alumina, quartz, slurry, kaolin, carborundum, sprayer dust.
Paper Making Industry: White soil slurry, black and white liquid, paper-making liquid, and wastewater recycling.
Metallurgy and Mining: Aluminum powder, ceruse, copper powder, welding rod powder, manganese dioxide, copper electrolytes, electromagnetic materials, kaolin, lime, heavy calcium carbonate.
The Carbon Steel Sand Dewatering Machine is a highly effective and efficient solution for various industries that require sand dehydration. Its durable, stainless steel construction, continuous operation, and ease of maintenance make it an excellent choice for mining, metallurgy, and chemical processing operations.
Dam-board make the dehydrated sand be discharged smoothly from the outlet.
Frame, with net rack and screen cloth.
Observation hole with glass cover, can see the motion of materials easily and safely.
Shipping Timeframes: All orders are processed within 2-5 business days (excluding weekends and holidays). After your order has been processed, the estimated delivery time is before 01 Apr, 2025, depending on customs, Please note that due to high demand, some items may experience longer shipping times, which will be communicated at order confirmation email.
Order Processing Time: Please allow 2-5 business days for us to process your order before it is shipped . Orders placed after 16:00 on Fridays, or during weekends and public holidays, will begin processing on the next business day. Processing times may be extended during peak seasons or sales events.
Manufacturing Time: Some products needs manufacturing time, the manufacturing process will take approximately 10-30 business days depending on the product. This timeframe may vary depending on the complexity of the product and current demand. but this will be communicated with you during order confirmation.
Returns and Exchanges: We offer a 30-day return policy for most items. If you are not completely satisfied with your purchase, you may return it within 30 days of receipt for a refund or exchange. Items must be unused, in their original packaging, and accompanied by proof of purchase. Return shipping costs are the responsibility of the customer, unless the item was damaged or defective upon arrival.
0
0 Overall Rating
5
0%
0
4
0%
0
3
0%
0
2
0%
0
1
0%
0
Review this product
For you to write a review, you need to login first
At Afrimart, we strive to process all orders promptly. Once the payment has been successfully cleared into our account, your order will be processed within 2 to 5 business days. Please note that this processing time excludes weekends and public holidays.
Following the processing of your order, the estimated delivery lead time ranges between 35 to 60 days. However, please be aware that this timeframe is subject to variations due to potential delays in shipping and customs clearance. While we aim to adhere to the original delivery schedule, unforeseen circumstances may occasionally extend the delivery window beyond the anticipated 35 to 60 days.
In the event of high demand or other factors leading to longer shipping times for certain items, we will communicate any expected delays during the initial order confirmation. We appreciate your understanding and patience as we work to ensure your order arrives as swiftly as possible.