Introduction of BL-10 Construction Equiment Supplier Concrete Cement Foam Machine Foam Generator Machine
1. Installation: Mount the auger feeder on the feeding inlet of foamed concrete mixer, with the outlet of mixer connected with the inlet of screw mortar pump (ID64 plastic tube, PVC hose, 2-3m in length) and placed a little higher than the pump inlet; connect the mortar pump outlet with a discharge tube (ID50 plastic tube, PVC hose) no more than 100m in length; arrange the cement foaming machine around the mortar pump, with its discharge tube fixed on the feeding tube of foam mixer in the mortar pump; then, connect the equipments to power sources and check carefully for safety. zmwm06
2. Connect a water pipe to the water inlet of foamed concrete mixer for adding water through the inlet and regulating water flow with the inlet valve.
3. Place a big volume plastic drum or plastic cloth pool near the cement foaming machine, prepare the foaming solution in a proportion of 1kg foaming agent to 40kg water and mix evenly; then, immerse the liquid inlet pipe and return pipe of the foaming machine (two yellow pipes) in the foaming solution.
4. Add water in the mixer and start up the equipment to check whether the machines run normally, the mortar pump draws water normally, the foaming machine foams normally, the feeder, mixer and foaming machine rotate reversely, and the direction of rotation is correct, or the equipment should be put out of service
5. Normal production can be started if the equipments are proved to be under normal conditions. Turn on the power of mixer and start it up, open the inlet value for adding water, then energize the auger feeder for loading (do not load any material before the mixer is started up, but the machine should be started and water be added before loading, so as to avoid motor burnout); add cement and other necessary materials in the hopper of feeder, adjust the damper at the hopper opening to control material flow; turn on the foaming machine after mortar is mixed evenly; open the outlet valve of mixer and switch on the screw mortar pump after foaming becomes normal for construction of thermal insulation of the roof or cast-in-place wall by pumping.
Parameter
Parameter of BL-10 Construction Equiment Supplier Concrete Cement Foam Machine Foam Generator Machine
Item
Product Name
Describe
1
Foam Generator
Size:1000*600*780mm
Weigh:150kg
Pressure :0.8aps
Max.foaming capacity:30m3/H
Power:380V/50HZ /3KW
2
Mixer
Size:2300*700*1300mm
Weight:280kg
Capacity:0.8m3
Power:380V/50HZ/3KW
Speed :≤50r/min
3
Mortar pump
Size:1500*300*400mm
Weight:110kg
Pressure :0.6aps
Max. Transportation capacity:8-10m3/h
Power:380V/50HZ/3KW
4
Feeder
Size:2700*600*600mm
Weight:120kg
Power:380V/50HZ/3KW
Company Strength
Shipping Timeframes: All orders are processed within 2-5 business days (excluding weekends and holidays). After your order has been processed, the estimated delivery time is before 20 Jan, 2025, depending on customs, Please note that due to high demand, some items may experience longer shipping times, which will be communicated at order confirmation email.
Order Processing Time: Please allow 2-5 business days for us to process your order before it is shipped . Orders placed after 16:00 on Fridays, or during weekends and public holidays, will begin processing on the next business day. Processing times may be extended during peak seasons or sales events.
Manufacturing Time: Some products needs manufacturing time, the manufacturing process will take approximately 10-30 business days depending on the product. This timeframe may vary depending on the complexity of the product and current demand. but this will be communicated with you during order confirmation.
Returns and Exchanges: We offer a 30-day return policy for most items. If you are not completely satisfied with your purchase, you may return it within 30 days of receipt for a refund or exchange. Items must be unused, in their original packaging, and accompanied by proof of purchase. Return shipping costs are the responsibility of the customer, unless the item was damaged or defective upon arrival.
0
0 Overall Rating
5
0%
0
4
0%
0
3
0%
0
2
0%
0
1
0%
0
Review this product
For you to write a review, you need to login first
Afrimart Online stands as Africa's foremost e-commerce hub, featuring an expansive array of product categories spanning electronics, machinery, toys, furniture, and more. Committed to excellence, our platform delivers swift and streamlined logistics and customs clearance solutions, offering a comprehensive one-stop service for cross-border imports.
Leveraging over three decades of international trade expertise, we ensure a seamless and hassle-free importing experience, providing top-tier products at competitive prices to meet the diverse needs of African consumers.
At Afrimart, we strive to process all orders promptly. Once the payment has been successfully cleared into our account, your order will be processed within 2 to 5 business days. Please note that this processing time excludes weekends and public holidays.
Following the processing of your order, the estimated delivery lead time ranges between 35 to 60 days. However, please be aware that this timeframe is subject to variations due to potential delays in shipping and customs clearance. While we aim to adhere to the original delivery schedule, unforeseen circumstances may occasionally extend the delivery window beyond the anticipated 35 to 60 days.
In the event of high demand or other factors leading to longer shipping times for certain items, we will communicate any expected delays during the initial order confirmation. We appreciate your understanding and patience as we work to ensure your order arrives as swiftly as possible.