π Important:
All orders, emails, and quotations will be processed and responded to once we reopen on 3rd January 2025.
Thank you for your understanding and patience!
π Festive Closing Notice:
We will be closed from 21st December 2024 to 3rd January 2025.
Wishing you a joyous holiday season! π
1. As a Professional Manufacturing Factory, We have more than 10 manufacturing chief engineers with good experiences for control the manufacturing quality.
2. Self-Designed Smoke cleaning system, Waste gas burning system , Special Design of the Reactor inside structure for recycling used plastic and Oil sludge, Vacuum Unit for the carbon discharging system to help more easy-operation and Labor-saving
3. Qualified certificates of ISO9001, ISO14001, CE for the Manufacturing
4. High quality supplier for assuring the good performance of motors, fans, anti-high temperature rollers, ex-pumps,valves and ect.
5. Competitive price, Flexible Modular design, Experience on installation and running projects , 24Hours after-sales service.
Pyrolysis Plant Processing Time ( Take 15Tons capacity as example )
Feeding Time
40Mins-1Hour ( By hydraulic feeder or High temperature feeder)
Pyrolysis Time
11-13Hours for 15Tons capacity, 9-11Hours for 10Tons and 12Tons capacity
Cooling Time
4-5Hours
Carbon discharging time
1Hour by carbon discharger
Machine Manufacturing Time
20-35days
Installation Time
7-15days ( The Reactor and cooling system is modular design,fully finished before shipment)
Warranty Time
12 months for the whole plants, 24hours service for the whole life of the machine
Raw Material can be processed.
Waste tyre, Used scrap rubber, waste Plastic ( MSW, city waste, straw grass). Oil sludge, Oil mud, HFO(heavy fuel oil)
Output yield from different Raw materials :
Waste tyre normally give 40%-45% fuel oil yield, Truck tires or Industrial tires gives around 50% fuel oil yield
Waste plastic gives different oil yield according to different tyre of Plastic
Heavy fuel oil gives around 65-70% Fuel oil yield
Oil sludge gives around 20%-30% fuel oil yield . Due to the water content is higher in the oil sludge, dewater first for the oil sludge thn go for pyrolysis
Tyre as Raw material :
car tyre, truck tyre, rubber cable
Tyre oil : 40%-45%
carbon black : 30%-35%
wire : 10%-15%
waste gas: 1%-3%
Plastic as Raw material :
PVC and PET not acceptable
PE Plastic oil : 80%-85%
( 20%-30% for some other mixed plastic)
Carbon : 5%-10%
Waste gas: 3%-5%
HFO as raw material :
Fuel oil : 65%-70%
carbon residue : 20%-25%
waste gas: 1%-3%
Oil sludge as raw material:
Fuel oil : 20%-30%
residue : 20%-30%
waste water: 20%-30%
waste gas: 1%-3%
Pyrolysis Plant Composition
Feeding system .
Conveyor Belt : to feed whole tyres, packed plastic (1-2Hours to feed 10Tons capacity)
Hydraulic feeder: to feed cutted tyres, non-packed plastic, shredded plastic (40Mins-1Hour to feed 10Tons capacity
High temperature feeder: to feed tyre pellet or some other smaller size raw materials
Screw feeder: to feed liquid raw materials , such as oil sludge, heavy fuel oil
Main parts
Mainly process: Feeding---Pyrolysis in the reactor ---Cooling by cooling pool ---Oil collection ----Smoke cleaning ---Carbon discharging
Carbon Black discharging system .
Screw discharger: for small capacity or single set pyrolysis machine
Vacuum discharger: for 6sets/8sets/10sets pyrolysis machine running together
High temperature discharger : For semi-continuous pyrolysis machine
Shipping Timeframes: All orders are processed within 2-5 business days (excluding weekends and holidays). After your order has been processed, the estimated delivery time is before 25 Feb, 2025, depending on customs, Please note that due to high demand, some items may experience longer shipping times, which will be communicated at order confirmation email.
Order Processing Time: Please allow 2-5 business days for us to process your order before it is shipped . Orders placed after 16:00 on Fridays, or during weekends and public holidays, will begin processing on the next business day. Processing times may be extended during peak seasons or sales events.
Manufacturing Time: Some products needs manufacturing time, the manufacturing process will take approximately 10-30 business days depending on the product. This timeframe may vary depending on the complexity of the product and current demand. but this will be communicated with you during order confirmation.
Returns and Exchanges: We offer a 30-day return policy for most items. If you are not completely satisfied with your purchase, you may return it within 30 days of receipt for a refund or exchange. Items must be unused, in their original packaging, and accompanied by proof of purchase. Return shipping costs are the responsibility of the customer, unless the item was damaged or defective upon arrival.
0
0 Overall Rating
5
0%
0
4
0%
0
3
0%
0
2
0%
0
1
0%
0
Review this product
For you to write a review, you need to login first
Afrimart Online stands as Africa's foremost e-commerce hub, featuring an expansive array of product categories spanning electronics, machinery, toys, furniture, and more. Committed to excellence, our platform delivers swift and streamlined logistics and customs clearance solutions, offering a comprehensive one-stop service for cross-border imports.
Leveraging over three decades of international trade expertise, we ensure a seamless and hassle-free importing experience, providing top-tier products at competitive prices to meet the diverse needs of African consumers.
At Afrimart, we strive to process all orders promptly. Once the payment has been successfully cleared into our account, your order will be processed within 2 to 5 business days. Please note that this processing time excludes weekends and public holidays.
Following the processing of your order, the estimated delivery lead time ranges between 35 to 60 days. However, please be aware that this timeframe is subject to variations due to potential delays in shipping and customs clearance. While we aim to adhere to the original delivery schedule, unforeseen circumstances may occasionally extend the delivery window beyond the anticipated 35 to 60 days.
In the event of high demand or other factors leading to longer shipping times for certain items, we will communicate any expected delays during the initial order confirmation. We appreciate your understanding and patience as we work to ensure your order arrives as swiftly as possible.