Quantity | Price |
---|
Automation Assembly Machine
Product Description
Function:
PLC control system, automatically complete material feeding and assembling; such as wall switch bottom cover, the positive and negative terminal, ground terminal, wing panels, spring, spring fittings, buttons, terminal screws and other parts.
Application:
Apply to electrical switches production areas to achieve automated assembly of wall switch.
Technical parameters:
Production capacity: | 20 ~ 25pcs / min |
Driving pressure: | 4.5 ~ 6.5kgf / cm2 |
Operating voltage: | 110V ~ 250V |
Feeding mode: | vibratory bowl feeder |
Dimensions: | 1400 (L) X1600 (W) X1600 (H) (mm) |
Weight: | about 400kg |
Machine Structure:
1 Electronic control: Taiwan Weinview touch screen, PLC control;
2 Gas into components: AIRTAC brand cylinder drive, Panasonic or Keyence optical fiber sensor;
3 Two to four vibrator automatic feeding rubber core, terminal, vibration plate painting, baking rack side pass;
4 Structure sliding part choose D2 high speed steel, stable wear, good fixity;
5 One year warranty;
6 Alarm indication;
The machine features:
1 This series machine is designed and manufactured specifically for the switching industry
2 Automatic feed terminal, loaded terminal / riveting / one-time processing complete
3. Automatic detecting, automatic start when there is material detected, and auto stop when lack of material
4. Automatic counting, set output
5 using the touch screen, intuitive interface, simple and safe operation,
6 automatic alarming in case of abnormal shutdown and reporting abnormal information
Product image:
At Afrimart, we strive to process all orders promptly. Once the payment has been successfully cleared into our account, your order will be processed within 2 to 5 business days. Please note that this processing time excludes weekends and public holidays.
Following the processing of your order, the estimated delivery lead time ranges between 35 to 60 days. However, please be aware that this timeframe is subject to variations due to potential delays in shipping and customs clearance. While we aim to adhere to the original delivery schedule, unforeseen circumstances may occasionally extend the delivery window beyond the anticipated 35 to 60 days.
In the event of high demand or other factors leading to longer shipping times for certain items, we will communicate any expected delays during the initial order confirmation. We appreciate your understanding and patience as we work to ensure your order arrives as swiftly as possible.