Pillow bag, standing bag (gusseted), punch, linked bag
Range of measuring (g)
500
Maximum width of packing film (mm)
320
Thickness of film (mm)
0.04-0.08
Air consumption
0.4m3/min 0.6MPa
Packing Material
laminated film such as POPP/CPP, POPP/ VMCPP, BOPP/PE, PET/ AL/PE , NY/PE, PET/ PET,
Power Parameter
220V 50/60Hz 2.2KW
Package Volume (mm)
1300(L)×820(W)×1400(H)
Gross Weight (kg)
250
TECHNICAL FEATURE
1. Adopting PLC from Japan or Germany to make machine run stable. Touch screen from Tai Wan to make operation easy.
2. Sophisticated design on electronic and pneumatic control system makes the machine with high level of precision, reliability and stability.
3. Single-belt pulling with servo of high precise positioning makes film transporting system stable, servo motor from Siemens or Panasonic.
4. Perfect alarm system to make problem solved quickly.
5. Adopting intellectual temperature controller,the temperature is controlled to ensure neat sealing.
6. Machine can make pillow bag and standing bag (gusseted bag) according to customer's requirements. Machine also can make bag with punching hole & linked bag from 5-12bags and so on.
7. Working with weighing or filling machines such as multihead weigher, volumetric cup filler, auger filler or feeding conveyor, process of weighing, bag making, filling, date printing, charging (exhausting), sealing, counting and delivering finished product can be completed automatically.
Machine working process
ZH-V320 vertical packing machine is widely used, can make pillow bag,gusset bag,punching bag ,connecting bag.
As shown in the image, the packing machine makes the film into various types of bags through the molding machine.
The picture is to combine the vertical packing machine with the multihead weigher ,material conveying ,weighing ,filling ,bag -making ,date -printing ,finished product outputting are all completed automatically .
Packing system unite:
1.Z shape bucket elevator
2.10 heads multihead weigher
3.Working platform
4.Vertical packing machine
5.Product conveyor
Shipping Timeframes: All orders are processed within 2-5 business days (excluding weekends and holidays). After your order has been processed, the estimated delivery time is before 20 Jan, 2025, depending on customs, Please note that due to high demand, some items may experience longer shipping times, which will be communicated at order confirmation email.
Order Processing Time: Please allow 2-5 business days for us to process your order before it is shipped . Orders placed after 16:00 on Fridays, or during weekends and public holidays, will begin processing on the next business day. Processing times may be extended during peak seasons or sales events.
Manufacturing Time: Some products needs manufacturing time, the manufacturing process will take approximately 10-30 business days depending on the product. This timeframe may vary depending on the complexity of the product and current demand. but this will be communicated with you during order confirmation.
Returns and Exchanges: We offer a 30-day return policy for most items. If you are not completely satisfied with your purchase, you may return it within 30 days of receipt for a refund or exchange. Items must be unused, in their original packaging, and accompanied by proof of purchase. Return shipping costs are the responsibility of the customer, unless the item was damaged or defective upon arrival.
0
0 Overall Rating
5
0%
0
4
0%
0
3
0%
0
2
0%
0
1
0%
0
Review this product
For you to write a review, you need to login first
Afrimart Online stands as Africa's foremost e-commerce hub, featuring an expansive array of product categories spanning electronics, machinery, toys, furniture, and more. Committed to excellence, our platform delivers swift and streamlined logistics and customs clearance solutions, offering a comprehensive one-stop service for cross-border imports.
Leveraging over three decades of international trade expertise, we ensure a seamless and hassle-free importing experience, providing top-tier products at competitive prices to meet the diverse needs of African consumers.
At Afrimart, we strive to process all orders promptly. Once the payment has been successfully cleared into our account, your order will be processed within 2 to 5 business days. Please note that this processing time excludes weekends and public holidays.
Following the processing of your order, the estimated delivery lead time ranges between 35 to 60 days. However, please be aware that this timeframe is subject to variations due to potential delays in shipping and customs clearance. While we aim to adhere to the original delivery schedule, unforeseen circumstances may occasionally extend the delivery window beyond the anticipated 35 to 60 days.
In the event of high demand or other factors leading to longer shipping times for certain items, we will communicate any expected delays during the initial order confirmation. We appreciate your understanding and patience as we work to ensure your order arrives as swiftly as possible.