Auto Feeding Plastic Metal Separator Detector Machine for granule
Economical pipe plastic metal separator and its magnetic system separate can remove metal particles that may present in the plastic granuate (even when the metal particles are enclosed in the product). Metal separator can prevent metal entering injection moulding machines, which can reduce damages to moulds , hot nozzles and valves. Companies can also use this machine to protect extruders, injection moulding and blow moulding machines.
Typical Application Areas: Plastic industry, food industry, chemical industry,
Features:
1. The metal separator can be installed directly over the feeder of an injection moulder,an extruder or a blow moulder.
2. It detects all magnetic and non-magnetic metal contaminants (steel, stainless steel, aluminium,etc.)-even when they are enclosed in the product. Metal contaminants are rejected when they enter the "reject board" separator unit.
3. It can work alone or combine with other machines.
Advantages:
1.High sensitivity for all metal with high noise immunity against vibrations and electric smog
2.Patent-registered metal separator guarantees security, operation even when dealing with high quantities of grinding
4.Adapter plates for different models of conveyors and machines available (optional).
5.Auto-Set(Auto-teach function) or manual product compensation(no fixed setting) for improved adaptaion to the intrinsic conductivity of the product to be inspected.
6.Easy operation.
Technical Parameters:
Model
PEC2005A-25
PEC2005A-35
PEC2005A-50
PEC2005A-70
PEC2005A-100
Input Pipe(mm)
Φ25mm
Φ35mm
Φ50mm
Φ70mm
Φ100mm
Sensitivity
Fe
Φ0.2mm
Φ0.3mm
Φ0.5mm
Φ0.7mm
Φ1.0mm
SUS
Φ0.5mm
Φ0.8mm
Φ1.0mm
Φ1.2mm
Φ1.5mm
Max Pass Through L/H
250kg/H
300-400kg/H
700-800kg/H
1000-1500kg/H
2000-2500kg/H
Power Supply
220V/50~60Hz
220V/50~60Hz
220V/50~60Hz
220V/50~60Hz
220V/50~60Hz
Temperature
-10~+80ºC
-10~+80ºC
-10~+80ºC
-10~+80ºC
-10~+80ºC
Outlet Period (adjusted)
0.3-5 S
0.3-5 S
0.3-5 S
0.3-5 S
0.3-5 S
Compressed air
3~5Bar
3~5Bar
3~5Bar
3~5Bar
3~5Bar
Dimensions of machine (mm)
318X230X326
318X230X326
318X230X326
378X270X350
390X280X385
Shipping Timeframes: All orders are processed within 2-5 business days (excluding weekends and holidays). After your order has been processed, the estimated delivery time is before 18 Jan, 2025, depending on customs, Please note that due to high demand, some items may experience longer shipping times, which will be communicated at order confirmation email.
Order Processing Time: Please allow 2-5 business days for us to process your order before it is shipped . Orders placed after 16:00 on Fridays, or during weekends and public holidays, will begin processing on the next business day. Processing times may be extended during peak seasons or sales events.
Manufacturing Time: Some products needs manufacturing time, the manufacturing process will take approximately 10-30 business days depending on the product. This timeframe may vary depending on the complexity of the product and current demand. but this will be communicated with you during order confirmation.
Returns and Exchanges: We offer a 30-day return policy for most items. If you are not completely satisfied with your purchase, you may return it within 30 days of receipt for a refund or exchange. Items must be unused, in their original packaging, and accompanied by proof of purchase. Return shipping costs are the responsibility of the customer, unless the item was damaged or defective upon arrival.
0
0 Overall Rating
5
0%
0
4
0%
0
3
0%
0
2
0%
0
1
0%
0
Review this product
For you to write a review, you need to login first
Afrimart Online stands as Africa's foremost e-commerce hub, featuring an expansive array of product categories spanning electronics, machinery, toys, furniture, and more. Committed to excellence, our platform delivers swift and streamlined logistics and customs clearance solutions, offering a comprehensive one-stop service for cross-border imports.
Leveraging over three decades of international trade expertise, we ensure a seamless and hassle-free importing experience, providing top-tier products at competitive prices to meet the diverse needs of African consumers.
At Afrimart, we strive to process all orders promptly. Once the payment has been successfully cleared into our account, your order will be processed within 2 to 5 business days. Please note that this processing time excludes weekends and public holidays.
Following the processing of your order, the estimated delivery lead time ranges between 35 to 60 days. However, please be aware that this timeframe is subject to variations due to potential delays in shipping and customs clearance. While we aim to adhere to the original delivery schedule, unforeseen circumstances may occasionally extend the delivery window beyond the anticipated 35 to 60 days.
In the event of high demand or other factors leading to longer shipping times for certain items, we will communicate any expected delays during the initial order confirmation. We appreciate your understanding and patience as we work to ensure your order arrives as swiftly as possible.