The Francis turbine fills a large gap between the Pelton and Kaplan and it is widely used. They operate in water head from 10 to 600 meters, and are primarily used for electric power generation. Their power output can be calculated from the water head and flow rate and typically range from 10 to more than 700 megawatts. One of the distinct advantages of the Francis turbine with respect to other water turbines is that they can also be used as water pump. This makes them ideal for a pumped storage systems.
Francis turbines may be designed for a wide range of heads and flows. This, along with their high efficiency, has made them the most widely used turbine in the world. In contrast to the Pelton turbine, the Francis turbine operates at its best completely filled with water at all times. The turbine and the outlet channel may be placed lower than the lake or sea level outside, breducing the tendency for cavitation.
In addition to electrical production, they may also be used for pumped storage, where a reservoir is filled by the turbine (acting as a pump) driven by the generator acting as a large electrical motor during periods of low power demand, and then reversed and used to generate power during peak demand. These pump storage reservoirs act as large energy storage sources to store "excess" electrical energy in the form of water in elevated reservoirs.
Material
Steel plate/Stainless steel
Shaft type
Vertical/Horizontal
Power range
50KW-20MW
Speed range
150RPM-1000RPM
Inlet direction
Vertical/Horizontal
Frequency
50hz/60hz
Efficiency
85%-93%
Runner range
30cm-200cm
Guide vane
Counter Weight
Application
On-grid/Off-grid
Recommend Products
Case & Exhibition
Company & Factory
Hongya Power Generating Equipment To Utilities Limited(HPGE), is a professional manufacturer with 16 years experience of mini hydraulic generator generator set.HPGE have 200 workers, which the R&D part is 25%.We have the equipment inclueded: Francis, pelton, turgo, Kaplan turbine, synchronous generator, speed governor, brushless excitor, hydraulic hardware etc with unit turbine generator set capacity under 20mw.HPGE offer a comprehensive range of hydroelectric power plant service such as: Project consultant of mini Hpp; Site management studies; equipment Design; Hydroelectric equipment Manufacture; Project management; Installation guidance; Commission and start operation; Operation guidance; Hydroelectric equipment maintenance etc.
We cooperate with more than 300 hydro power plants with more than 600 turbine generators sets, areas covering more than 20 provinces of China and also international markets such as Russia, Belarus, Turkey, Albania,Vietnam Indonesia, Nepal, Laos, Sri Lanka, Cuba and Brazil etc.
Shipping Timeframes: All orders are processed within 2-5 business days (excluding weekends and holidays). After your order has been processed, the estimated delivery time is before 17 Feb, 2025, depending on customs, Please note that due to high demand, some items may experience longer shipping times, which will be communicated at order confirmation email.
Order Processing Time: Please allow 2-5 business days for us to process your order before it is shipped . Orders placed after 16:00 on Fridays, or during weekends and public holidays, will begin processing on the next business day. Processing times may be extended during peak seasons or sales events.
Manufacturing Time: Some products needs manufacturing time, the manufacturing process will take approximately 10-30 business days depending on the product. This timeframe may vary depending on the complexity of the product and current demand. but this will be communicated with you during order confirmation.
Returns and Exchanges: We offer a 30-day return policy for most items. If you are not completely satisfied with your purchase, you may return it within 30 days of receipt for a refund or exchange. Items must be unused, in their original packaging, and accompanied by proof of purchase. Return shipping costs are the responsibility of the customer, unless the item was damaged or defective upon arrival.
0
0 Overall Rating
5
0%
0
4
0%
0
3
0%
0
2
0%
0
1
0%
0
Review this product
For you to write a review, you need to login first
Afrimart Online stands as Africa's foremost e-commerce hub, featuring an expansive array of product categories spanning electronics, machinery, toys, furniture, and more. Committed to excellence, our platform delivers swift and streamlined logistics and customs clearance solutions, offering a comprehensive one-stop service for cross-border imports.
Leveraging over three decades of international trade expertise, we ensure a seamless and hassle-free importing experience, providing top-tier products at competitive prices to meet the diverse needs of African consumers.
At Afrimart, we strive to process all orders promptly. Once the payment has been successfully cleared into our account, your order will be processed within 2 to 5 business days. Please note that this processing time excludes weekends and public holidays.
Following the processing of your order, the estimated delivery lead time ranges between 35 to 60 days. However, please be aware that this timeframe is subject to variations due to potential delays in shipping and customs clearance. While we aim to adhere to the original delivery schedule, unforeseen circumstances may occasionally extend the delivery window beyond the anticipated 35 to 60 days.
In the event of high demand or other factors leading to longer shipping times for certain items, we will communicate any expected delays during the initial order confirmation. We appreciate your understanding and patience as we work to ensure your order arrives as swiftly as possible.