Quantity | Price |
---|
Usage scenarios | commercial/household |
control mode | Machinery control |
Time | 0-15 housrs adjustable |
Temperature range | 40~90℃(104~194℉) |
Trays | 16trays (40*40cm) |
Product Size | 545*420*630mm |
Package | 605*470*690mm 23.5KG |
Product Keywords | food dehydrator,stainless steel dryer machine,vegetable and fruit dryer |
parameter
Product Name | Food Dehydrator |
Model No. | ST-02 |
Material | Full stainless steel |
Power | 1000W |
Voltage / Frequency | 100-240V~50/60Hz |
Temperature Ranges | 40~90℃ (104~194℉) |
Max. Timing | 15hrs |
Noise Level | 45~50dB |
Capacity | 100L |
Airflow System | Horizontal |
Total Racks | 16 levels |
Rack Size(L X W) | 395X395mm(15.5X15.5") |
Housing finish | Brushed finish |
Logo Craftmanship | Laser-engraved |
Product Dimension(W X H X D)
Packing Dimension(W X H X D) | 545X420X630mm (21.4X16.5X24.8")
605X470X690mm (23.8X18.5X27.1") |
AC Power Cord | 1.5m lengt
PVC sleeveh based on specific plug standard choice |
ODM project process
1.Communication Requirements: Customer provide sample or design paper with details requirements.
2.factory quoting: quotation is passed by customer and factory provide die design.
3.making prototype: within 5-7days, provide the 1:1 mock-up
4.confirmation of prototype: customer confirm the 1:1 mock-up after several adjustment
5.Opening mould. Produce the mould according to the confirmation of 1:1 mock-up,takes around 1-2months
6.testing mould. Try the mould repeatedly and make sure there is no flaws on finished products.
7.Trial production. Small mass production after passing the mould testing and do fully product test
8.Mass production. Start mass production after passing the trial production, and customer pay the deposit.
9.Inpection&delivery. Delivery within 4 weeks, customer arrange the balance payment.
Afrimart Online stands as Africa's foremost e-commerce hub, featuring an expansive array of product categories spanning electronics, machinery, toys, furniture, and more. Committed to excellence, our platform delivers swift and streamlined logistics and customs clearance solutions, offering a comprehensive one-stop service for cross-border imports.
Leveraging over three decades of international trade expertise, we ensure a seamless and hassle-free importing experience, providing top-tier products at competitive prices to meet the diverse needs of African consumers.
At Afrimart, we strive to process all orders promptly. Once the payment has been successfully cleared into our account, your order will be processed within 2 to 5 business days. Please note that this processing time excludes weekends and public holidays.
Following the processing of your order, the estimated delivery lead time ranges between 35 to 60 days. However, please be aware that this timeframe is subject to variations due to potential delays in shipping and customs clearance. While we aim to adhere to the original delivery schedule, unforeseen circumstances may occasionally extend the delivery window beyond the anticipated 35 to 60 days.
In the event of high demand or other factors leading to longer shipping times for certain items, we will communicate any expected delays during the initial order confirmation. We appreciate your understanding and patience as we work to ensure your order arrives as swiftly as possible.