Quantity | Price |
---|
Brand Name | HNOC |
Name | gummy bear machine |
Type | Automatic |
Capacity | 150-600kg/h |
Material | 304 Stainless Steel |
Usage | Candy make |
key words | High Productivity |
HS Cord | 84382000 |
Size | 6690*700*1400 mm |
MOQ | 1 set |
Model | HNOC-150 | HNOC-300 | HNOC-450 | HQ-600 |
standard production volume(kg/hour) | 150 | 300 | 450 | 600 |
The sugar levels | 2-6g | 2-6g | 2-6g | 2-6g |
pouring rate | 45-55n/min | 45-55n/min | 45-55n/min | 45-55n/min |
Steam demand | 0.2m³/min, 0.4-0.6Mpa | 0.2m³/min, 0.4-0.6Mpa | 0.2m³/min, 0.4-0.6Mpa | 0.2m³/min ,0.4-0.6Mpa |
Work environment requirements | Temperature:20-25℃ humidity :55% | Temperature:20-25℃ humidity :55% | Temperature:20-25℃ humidity :55% | Temperature:20-25℃ humidity :55% |
Total Power | 18kw/380V | 27kw/380V | 34kw/380V | 38kw/380V |
Overall length | 15m | 17m | 17m | 20m |
Overall weight | 3500kg | 4000kg | 4500kg | 5000kg |
1. Introduction of the whole production line:
The hard candy production line consists of an electric sugar pot, a cooling table, a heat preservation roller, a drawing machine, a forming machine, a cooling screen and a packaging machine, which can produce round and oval hard candy.The whole production line of electrical integrated control, easy to control the operation, is small and medium-sized
Ideal equipment for a candy factory.
2. Main technical parameters:
Production: 150-500 kg/h
Whole line power: 5.4KW
Full line size :6690*700*1400 mm
3. Main production process:
Boil sugar → cool it → roll sugar → pull the jelly into a sugar bar → punch the sugar bar into a round or oval hard candy → cool it → package the finished product
At Afrimart, we strive to process all orders promptly. Once the payment has been successfully cleared into our account, your order will be processed within 2 to 5 business days. Please note that this processing time excludes weekends and public holidays.
Following the processing of your order, the estimated delivery lead time ranges between 35 to 60 days. However, please be aware that this timeframe is subject to variations due to potential delays in shipping and customs clearance. While we aim to adhere to the original delivery schedule, unforeseen circumstances may occasionally extend the delivery window beyond the anticipated 35 to 60 days.
In the event of high demand or other factors leading to longer shipping times for certain items, we will communicate any expected delays during the initial order confirmation. We appreciate your understanding and patience as we work to ensure your order arrives as swiftly as possible.