B21, China Town Mall, Midrand
Welcome to Afrimart OnlineWrap new offers/gift every single day on Weekends.New Coupon Code: Fast024
Something you love is now on sale! Buy Now !
pillow briquette production line 10Tonhour 40KW 60 mm in diameter

0 Customer Reviews

  • Shipping Timeframes: All orders are processed within 2-5 business days (excluding weekends and holidays). After your order has been processed, the estimated delivery time is before 18 Feb, 2026, depending on customs, Please note that due to high demand, some items may experience longer shipping times, which will be communicated at order confirmation email.
  • Order Processing Time: Please allow 2-5 business days for us to process your order before it is shipped . Orders placed after 16:00 on Fridays, or during weekends and public holidays, will begin processing on the next business day. Processing times may be extended during peak seasons or sales events.
  • Manufacturing Time: Some products needs manufacturing time, the manufacturing process will take approximately 10-30 business days depending on the product. This timeframe may vary depending on the complexity of the product and current demand. but this will be communicated with you during order confirmation.
  • Returns and Exchanges: We offer a 30-day return policy for most items. If you are not completely satisfied with your purchase, you may return it within 30 days of receipt for a refund or exchange. Items must be unused, in their original packaging, and accompanied by proof of purchase. Return shipping costs are the responsibility of the customer, unless the item was damaged or defective upon arrival.
1. What is the production capacity of the pillow briquette production line?

The pillow briquette production line has a production capacity of 10 tons per hour.

2. What is the power requirement for the pillow briquette production line?

The production line requires a power input of 40KW.

3. What is the diameter of the briquettes produced by this line?

The briquettes produced have a diameter of 60 mm.

4. What types of materials can be processed with this production line?

This production line is designed to process a variety of biomass materials, including wood chips, sawdust, and agricultural residues.

5. Is the pillow briquette production line suitable for small-scale production?

While it is primarily designed for larger production, it can also be used in small-scale setups depending on the operational needs.

6. What are the main components of the production line?

The main components include a crusher, dryer, briquette machine, and packaging system.

7. How much space do I need to set up the production line?

The space required depends on the specific layout, but typically you should allocate a minimum area of 100 square meters for efficient operation.

8. What are the operational requirements for this production line?

The line requires an adequate power supply, proper ventilation, and a consistent feed of raw materials for optimal operation.

9. What is the maintenance schedule for the pillow briquette production line?

Regular maintenance should be performed every 500 hours of operation, including checking belts, lubricating parts, and inspecting for wear.

10. Are there any safety features included with the production line?

Yes, the production line is equipped with safety features such as emergency stop buttons, safety guards, and overload protection.

11. Can the production line be customized for specific requirements?

Yes, customization options are available based on specific production needs, including modifications to capacity and machine configurations.

12. What is the warranty period for the pillow briquette production line?

The production line typically comes with a warranty period of 1 year, covering parts and labor.

13. Is training provided for operating the production line?

Yes, training is provided for operators to ensure safe and efficient use of the production line.

14. What is the delivery time for the pillow briquette production line?

The typical delivery time is 4 to 6 weeks after order confirmation, depending on manufacturing schedules.

15. What are the payment terms for purchasing the production line?

Payment terms can vary, but typically a deposit is required upon order confirmation with the balance due before shipment.

0

0 Overall Rating
  • 5
    0%
    0
  • 4
    0%
    0
  • 3
    0%
    0
  • 2
    0%
    0
  • 1
    0%
    0

Review this product

For you to write a review, you need to login first

Login

Latest Order Arrivals

Discover our latest orders

12 Heads Embroidery Machine
12 Heads Embroidery Machine
Dewatering Pump Machine
Dewatering Pump Machine
Order Collection
Order Collection
Portable Water Drilling Rig
Portable Water Drilling Rig
Order Usefully Collected
Order Usefully Collected
Batch of Orders
Batch of Orders
Agriculture Processing Machines
Agriculture Processing Machines
Meat Grinder Machine
Meat Grinder Machine
Water Pump Equipment
Water Pump Equipment
Packaging Machine and accessories
Packaging Machine and accessories
Fabrics Manufacturing Equipment
Fabrics Manufacturing Equipment
Mining Equipments
Mining Equipments
Food Processing Machine
Food Processing Machine
Batch of Orders
Batch of Orders
Batch of Orders
Batch of Orders
Latest Orders Labelled
Latest Orders Labelled
wheel alignment machines
wheel alignment machines
new arrivals
new arrivals
Pre Orders Offloading
Pre Orders Offloading
Latest Arrivals
Latest Arrivals
Latest Arrivals
Latest Arrivals
Latest Arrivals
Latest Arrivals

Related Products

Recently Viewed Products