Quantity | Price |
---|
The ozone UV sterilization cabinet is designed to deliver efficient, thorough, and rapid sterilization for a variety of tools and materials. With its humanized design, automatic control system, and durable construction, this cabinet provides a reliable sterilization solution suitable for medical, laboratory, and professional settings.
Parameter | BJPX-SVO60 | BJPX-SVO80 |
---|---|---|
Capacity | 70L | 90L |
Internal Size (W×D×H) | 398×398×452 mm | 398×498×452 mm |
External Size (W×D×H) | 495×501×760 mm | 495×601×760 mm |
Sterilization Method | Ozone | Ozone |
Shelves | 2 pcs (optional 3 pcs, adjustable) | 2 pcs (optional 3 pcs, adjustable) |
Material | Work Zone: 304 stainless steel, 1.0mm thick; Main Body: Cold-rolled steel with coating | Work Zone: 304 stainless steel, 1.0mm thick; Main Body: Cold-rolled steel with coating |
Ozone Concentration | >60㎎/m³ | >60㎎/m³ |
Ozone Leakage | <0.16㎎/m³ | <0.16㎎/m³ |
Sterilization Level | Medium and low level | Medium and low level |
Indicator Bacteria | E. Coli, S. Aureus, C. Albicans | E. Coli, S. Aureus, C. Albicans |
Sterilization Rate | Over 99.99% for bacteria, viruses, fungi | Over 99.99% for bacteria, viruses, fungi |
Control System | Automatic | Automatic |
Power Supply | AC 220V±10%, 50/60Hz | AC 220V±10%, 50/60Hz |
Package Size (W×D×H) | 626×620×860 mm | 726×620×860 mm |
Gross Weight | 50 kg | 55 kg |
This ozone UV sterilization cabinet is ideal for sterilizing medical instruments, laboratory tools, and other materials requiring a sterile environment. Its adjustable design and robust sterilization capabilities make it an essential tool for hospitals, clinics, laboratories, and professional establishments.
At Afrimart, we strive to process all orders promptly. Once the payment has been successfully cleared into our account, your order will be processed within 2 to 5 business days. Please note that this processing time excludes weekends and public holidays.
Following the processing of your order, the estimated delivery lead time ranges between 35 to 60 days. However, please be aware that this timeframe is subject to variations due to potential delays in shipping and customs clearance. While we aim to adhere to the original delivery schedule, unforeseen circumstances may occasionally extend the delivery window beyond the anticipated 35 to 60 days.
In the event of high demand or other factors leading to longer shipping times for certain items, we will communicate any expected delays during the initial order confirmation. We appreciate your understanding and patience as we work to ensure your order arrives as swiftly as possible.