GJJ SC200/200TD
1, The transmission mechanism adopts two-drive or three-drive form, the rack and pinion force is uniform, safe and smooth.
2、To ensure the safe operation of the elevator, safety switches such as overload and speed limit are set in the circuit. When the above situation occurs in the operation, the elevator will avoid accidents immediately and automatically. Each door on the cage is also equipped with a limit switch, so that when any door opens abnormally, the cage cannot start or stop running immediately.
3、Each cage is equipped with fall arrester, which can effectively prevent the cage from falling and ensure the safe and reliable operation of the elevator.
4、The electric control system of the elevator is simple, easy to operate and maintain, and reliable. When the elevator is in normal operation, the elevator can be operated by handle or button inside the cage, and it can be stopped at any time at any position where it needs to be stopped; at the upper and lower terminal stations, the upper and lower terminal limit switches will control the automatic stopping; if the upper and lower terminal limit switches do not work due to failure, the limit switches set on the elevator can cut off the power supply in time to make it braked.
5、Steel structure design is scientifically and closely calculated to meet the requirements of reasonable structure, reliable strength and light weight.
6、The lift can install or dismantle the rail frame by itself using the boom on the cage. The rest of the parts can be easily installed and disassembled, and the parts are easy to replace.
Model | Unit | SC200/200TD(0-36m/min) |
Quantity | Unit | 1 |
Payload | kg | 2*2000 |
Erect payload | kg | 2*1000 |
Payload of crane fram | kg | 200 |
mast installation height | m | 60 |
Safety device | SAJ40-1.2 | |
Cage size | mm | 3200×1500×2350 |
Mast specification | mm | 650×650×1508 |
Quantity of tie-in | set | Ⅱ Models(2900mm-3600mm) |
Cable protection frame | set | 7 |
Cable | m | 2×70(3*16+2*6) |
Guide rail frame selection
A variety of guide frame size selection, recommended 650 * 650 * 1508mm.
Quantity of tie-in
A variety of Quantity of tie-in size selection, recommended Ⅱ Models.
At Afrimart, we strive to process all orders promptly. Once the payment has been successfully cleared into our account, your order will be processed within 2 to 5 business days. Please note that this processing time excludes weekends and public holidays.
Following the processing of your order, the estimated delivery lead time ranges between 35 to 60 days. However, please be aware that this timeframe is subject to variations due to potential delays in shipping and customs clearance. While we aim to adhere to the original delivery schedule, unforeseen circumstances may occasionally extend the delivery window beyond the anticipated 35 to 60 days.
In the event of high demand or other factors leading to longer shipping times for certain items, we will communicate any expected delays during the initial order confirmation. We appreciate your understanding and patience as we work to ensure your order arrives as swiftly as possible.