Reverse osmosis (RO) is a process whereby water is passed through a membrane under pressure in cross-flow fashion. With its exceptional purifying efficiency, reverse osmosis is one of the most economical methods for the removal of up to 99% of impurities.
reverse osmosis membrane ULP-8040HF is applicable to the desalination of municipal water, groundwater with salt concentration less than 1500ppm, and can be widely used in residential dual water supplying system, pure water preparation plant, industry, food production and other fields etc.
How it works
During reverse osmosis, feedwater is pumped past the input side of an RO membrane under pressure (typically 4-15 bar, 60-220 psi) in cross-flow fashion. Typically 15-30% of feedwater passes through the membrane as permeate and the exits the membrane as the concentrate that contains most of the salts, organics and essentially all particulates. RO membranes are typically thin film polyamide and are stable over a wide pH range, however, they can be damaged by oxidizing agents such as chlorine, so pretreatment is usually required to protect the membrane. RO membranes are used to remove water contaminants and reject water contaminants that are less than 1 nm in diameter. Typically over 90% of ionic impurity, most organic impurity, and nearly all particulates, bacteria and bio-molecules are removed from the filtrate or permeate water; these are carried out of the RO module in a waste or concentrate water stream.Water purification membrane osmosis reverse
Model & Parameters
Series
Model
Active Membrane
Area ft2(m2)
Permeate Flow
GPD(m3/d)
Salt Rejection
Rate (%)
XLP
XLP-8040
440(40.9)
11000(41.6)
99.2
ULP
ULP-8040MR-2
440(40.9)
10000(37.8)
99.6
ULP-8040-HF
440(40.9)
12500(47.3)
99.5
ULP-80400-2
400(37.2)
11500(43.5)
99.3
BW
BW-8040MR
365(33.9)
9500(35.9)
99.7
BW-8040
400(37.2)
10500(39.7)
99.6
BW-8040HF
440(40.9)
13000(49.2)
99.5
FR
BW-8040FR
365(33.9)
9500(35.9)
99.7
BW-8040XLFR
400(37.2)
10500(39.7)
99.7
SW
SW-8040HR
400(37.2)
6500(24.6)
99.8
SW-8040MR
400(37.2)
7500(28.3)
99.75
Standard Test Condition
Series
Model
Temperature 25 ℃, PH 7.5-8.0
Series
Model
Concentration of Solution (NaCl)
Operating Pressure psi(MPa)
Recovery Rate(%)
XLP
XLP-8040
500
100(0.69)
15
ULP
ULP-8040MR-2
1500
150(1.03)
15
ULP-8040-HF
ULP-80400-2
BW
BW-8040MR
2000
225(1.55)
15
BW-8040
BW-8040HF
FR
BW-8040FR
2000
225(1.55)
15
BW-8040XLFR
SW
SW-8040HR
32000
800(5.5)
8
SW-8040MR
Engineering Case
Groundwater Treatment
The ground water is features of high hardness, with process of "disc filter + UF + RO" ,
adopting RO Membrane Element-ULP-8040HF it’s running since April 2016, the stable rejection rate is 98.5%, permeate water is stable as well.
membrane osmosis reverse
Surface Water Treatment
"UF +RO” double membrane" treatment Process. Its daily treatment capability reaches to 50,000 tons.
membrane osmosis reverse
Landfill Leachate Treatment
Its leachate processing capacity up to 1,800 tons per day, the treated wastewater fully meet the national discharged standards, which regard as a demonstrative project for treatment of solid wastes disposal by the National Ministry of Housing and Urban-Rural Development.
membrane osmosis reverse
Food Process Water
The pure water system of Shanghai Production Base is applying "ULP-8040" RO membrane element with 200 tons per hour output from June, 2013. So far, membrane system is working under a well condition, which has gained the recognition of their leader for stable membrane performance.
membrane osmosis reverse
Shipping Timeframes: All orders are processed within 2-5 business days (excluding weekends and holidays). After your order has been processed, the estimated delivery time is before 01 Feb, 2025, depending on customs, Please note that due to high demand, some items may experience longer shipping times, which will be communicated at order confirmation email.
Order Processing Time: Please allow 2-5 business days for us to process your order before it is shipped . Orders placed after 16:00 on Fridays, or during weekends and public holidays, will begin processing on the next business day. Processing times may be extended during peak seasons or sales events.
Manufacturing Time: Some products needs manufacturing time, the manufacturing process will take approximately 10-30 business days depending on the product. This timeframe may vary depending on the complexity of the product and current demand. but this will be communicated with you during order confirmation.
Returns and Exchanges: We offer a 30-day return policy for most items. If you are not completely satisfied with your purchase, you may return it within 30 days of receipt for a refund or exchange. Items must be unused, in their original packaging, and accompanied by proof of purchase. Return shipping costs are the responsibility of the customer, unless the item was damaged or defective upon arrival.
0
0 Overall Rating
5
0%
0
4
0%
0
3
0%
0
2
0%
0
1
0%
0
Review this product
For you to write a review, you need to login first
Afrimart Online stands as Africa's foremost e-commerce hub, featuring an expansive array of product categories spanning electronics, machinery, toys, furniture, and more. Committed to excellence, our platform delivers swift and streamlined logistics and customs clearance solutions, offering a comprehensive one-stop service for cross-border imports.
Leveraging over three decades of international trade expertise, we ensure a seamless and hassle-free importing experience, providing top-tier products at competitive prices to meet the diverse needs of African consumers.
At Afrimart, we strive to process all orders promptly. Once the payment has been successfully cleared into our account, your order will be processed within 2 to 5 business days. Please note that this processing time excludes weekends and public holidays.
Following the processing of your order, the estimated delivery lead time ranges between 35 to 60 days. However, please be aware that this timeframe is subject to variations due to potential delays in shipping and customs clearance. While we aim to adhere to the original delivery schedule, unforeseen circumstances may occasionally extend the delivery window beyond the anticipated 35 to 60 days.
In the event of high demand or other factors leading to longer shipping times for certain items, we will communicate any expected delays during the initial order confirmation. We appreciate your understanding and patience as we work to ensure your order arrives as swiftly as possible.