B21, China Town Mall, Midrand
Welcome to Afrimart OnlineWrap new offers/gift every single day on Weekends.New Coupon Code: Fast024
Something you love is now on sale! Buy Now !
Solar Powered Construction Pile Driver Post Driver and Fence Piling Tool with Engine Pump Bearing Core Components

0 Customer Reviews

  • Shipping Timeframes: All orders are processed within 2-5 business days (excluding weekends and holidays). After your order has been processed, the estimated delivery time is before 04 Feb, 2026, depending on customs, Please note that due to high demand, some items may experience longer shipping times, which will be communicated at order confirmation email.
  • Order Processing Time: Please allow 2-5 business days for us to process your order before it is shipped . Orders placed after 16:00 on Fridays, or during weekends and public holidays, will begin processing on the next business day. Processing times may be extended during peak seasons or sales events.
  • Manufacturing Time: Some products needs manufacturing time, the manufacturing process will take approximately 10-30 business days depending on the product. This timeframe may vary depending on the complexity of the product and current demand. but this will be communicated with you during order confirmation.
  • Returns and Exchanges: We offer a 30-day return policy for most items. If you are not completely satisfied with your purchase, you may return it within 30 days of receipt for a refund or exchange. Items must be unused, in their original packaging, and accompanied by proof of purchase. Return shipping costs are the responsibility of the customer, unless the item was damaged or defective upon arrival.
1. What is the Solar Powered Construction Pile Driver used for?

This machine is designed for driving piles and installing posts and fences quickly and efficiently. Typical applications include piling for solar panel foundations, fence and barrier installations, foundations for structures, landscaping projects, and road or bridge construction.

2. Is this machine fully solar-powered or does it use another power source?

It is a solar-capable system designed to reduce fuel consumption and operating emissions. The unit also includes a diesel engine (auxiliary) and a hydraulic power train to guarantee performance under heavy loads or low-sun conditions — effectively making it a solar-assisted (hybrid) pile driver.

3. What are the core components of the machine?

The core components listed are the engine, bearings, and hydraulic pump. The full system also includes solar panels/energy management for solar operation, the hydraulic drive and hammer/DTH tooling, chassis and travel system, and operator controls.

4. What are the machine's size and weight specifications?

Operating dimensions are 4800 × 1980 × 2900 mm and the operating weight is 7,500 kg. For transport/shipping the single package size is listed as 530 × 220 × 280 cm (shipping crate/cradle dimensions may be larger than the assembled footprint).

5. What piling speed and travel speed can I expect?

The listed piling speed is up to approximately 6 m/min, though actual speed depends on soil conditions, pile type and operator technique. Walking/travel speed is 0–2.5 km/h.

6. What functions and optional attachments are available?

Standard functions include hydraulic pile driving and optional DTH (down-the-hole) drilling. Hydraulic hammer models 75/85/100 are listed as optional, allowing selection of hammer size to match pile type and job requirements.

7. How is the machine transported between sites?

Due to its weight (7,500 kg) and size, transport typically requires a heavy-duty flatbed trailer and appropriate lifting equipment (crane or forklift rated for the load). Check local road permits for oversized/overweight loads. Shipping crate dimensions should be used for logistics planning.

8. What routine maintenance does this pile driver require?

Regular maintenance includes daily inspection of hydraulic hoses and fittings, checking engine oil and coolant, greasing bearings and pivot points, monitoring hydraulic fluid levels and cleanliness, cleaning solar panels, and periodic replacement of wear parts such as hammer bits, seals and filters. Follow the manufacturer's maintenance schedule for service intervals.

9. Are spare parts and service available?

Hengwang supplies core spare parts (engine components, pump, bearings and wear parts). For availability, lead times and recommended spare parts kits, contact the supplier or authorized dealer. It's recommended to stock common wear items on-site for minimised downtime.

10. What safety precautions should operators follow?

Operators should be trained and certified for pile-driving and hydraulic equipment. Use appropriate PPE (hard hat, safety boots, ear and eye protection), secure the machine on stable ground, use outriggers or mats as needed, follow lockout/tagout procedures when servicing, and observe hydraulic pressure limits and safe distances from the operating pile hammer.

11. Can the machine work on uneven or soft ground?

Yes — the hydraulic chassis and slow travel speed allow operation on varied terrain, but ground stabilization (mats, cribbing, anchors) is recommended on very soft or highly uneven sites. For steep slopes or very soft soils, consult the supplier and perform a site assessment to determine safe deployment.

12. How does solar integration affect fuel consumption and runtime?

Solar charging and energy recovery reduce diesel usage and extend operational runtime, but actual fuel savings depend on solar irradiance, battery/storage capacity and the intensity of piling work. For precise runtime estimates and battery specs, request the detailed electrical/energy specification sheet from the manufacturer.

13. What environmental and noise considerations are there?

Solar-assisted operation lowers fuel consumption and related emissions compared with diesel-only machines. Pile driving and drilling are inherently noisy operations; noise levels vary by hammer option and site conditions. Follow local environmental and noise regulations and use noise mitigation measures where required.

14. Does the manufacturer provide operator training and commissioning?

Suppliers commonly offer operator training, on-site commissioning, and technical support. Contact Hengwang or your dealer to arrange training packages, start-up assistance and operator manuals specific to your machine configuration.

15. How do I choose between DTH drilling and hydraulic hammer options?

Choice depends on job requirements: DTH drilling is preferred for boreholes and rock drilling, while hydraulic hammers are ideal for driving piles/posts into softer soils or where displacement driving is required. Consider soil/rock conditions, pile material and project specifications; the supplier can recommend the appropriate hammer model (75/85/100) or DTH package.

0

0 Overall Rating
  • 5
    0%
    0
  • 4
    0%
    0
  • 3
    0%
    0
  • 2
    0%
    0
  • 1
    0%
    0

Review this product

For you to write a review, you need to login first

Login

Latest Order Arrivals

Discover our latest orders

12 Heads Embroidery Machine
12 Heads Embroidery Machine
Dewatering Pump Machine
Dewatering Pump Machine
Order Collection
Order Collection
Portable Water Drilling Rig
Portable Water Drilling Rig
Order Usefully Collected
Order Usefully Collected
Batch of Orders
Batch of Orders
Agriculture Processing Machines
Agriculture Processing Machines
Meat Grinder Machine
Meat Grinder Machine
Water Pump Equipment
Water Pump Equipment
Packaging Machine and accessories
Packaging Machine and accessories
Fabrics Manufacturing Equipment
Fabrics Manufacturing Equipment
Mining Equipments
Mining Equipments
Food Processing Machine
Food Processing Machine
Batch of Orders
Batch of Orders
Batch of Orders
Batch of Orders
Latest Orders Labelled
Latest Orders Labelled
wheel alignment machines
wheel alignment machines
new arrivals
new arrivals
Pre Orders Offloading
Pre Orders Offloading
Latest Arrivals
Latest Arrivals
Latest Arrivals
Latest Arrivals
Latest Arrivals
Latest Arrivals

Related Products

Recently Viewed Products