It is a compact crawler drilling rig designed for installing photovoltaic piles and ground screws for solar power stations, residential solar projects and other photovoltaic foundation applications.
Key specs: brand XRCore, model XR-300C, weight 5600 kg, engine Weichai 4108 diesel, max drilling depth 3500 mm, drill hole diameter 90–300 mm, adjustable drilling speed up to 1200 r/min, travel speed 20–30 km/h, track width 400 mm, 360° rotation, hydraulic motor pressurization system.
It can drill holes with diameters from 90 mm to 300 mm and reach depths up to 3500 mm, depending on soil conditions and tooling.
The XR-300C is powered by a Weichai 4108 diesel engine and uses a hydraulic motor pressurization system to drive drilling and rotation functions.
Yes — it is designed for a wide range of soil conditions (sandy, loamy, clay). For very hard rock or highly compacted strata, specialized rock bits, pre-drilling or consultation with the supplier is recommended.
The compact crawler design and 5600 kg weight make it relatively easy to maneuver on site. For road transport, use an appropriate flatbed trailer or low-loader and follow local transport regulations. Use lifting equipment rated for the machine weight when loading/unloading.
It offers 360-degree rotation for precise positioning and an adjustable drilling speed range to match different soil types and tooling requirements.
The drilling speed is adjustable up to approximately 1200 r/min, allowing operators to optimize speed for different soil conditions and auger sizes.
The machine is compatible with standard auger bits and ground screw tooling within the 90–300 mm diameter range. For special tooling, extensions or pile-driving accessories, consult the supplier for available options and compatibility.
Regular maintenance includes engine servicing per manufacturer intervals, checking and changing hydraulic oil and filters, greasing pivot points, inspecting and maintaining the tracks, and replacing worn auger bits or cutting edges. Follow the operator manual for detailed schedules.
Operators should be trained and familiar with the machine manual, wear appropriate PPE, secure the work area, use emergency stop procedures as needed, check stability on slopes, and ensure proper lifting techniques during transport and setup.
The machine's travel speed is listed at 20–30 km/h, suitable for relocating on site or short transfers; road transport should be done on a trailer per local regulations.
Contact the XRCore dealer or the machine supplier for spare parts, service agreements and technical support. Provide the model (XR-300C) and serial number when requesting parts or service information.
While specific certification depends on local regulations, operators should receive training on machine controls, safe drilling practices, maintenance procedures and emergency protocols. The supplier can often provide or recommend training.
Request a quote from the XRCore dealer or sales representative with project details (quantity, required drilling diameter/depth, terrain, and any special tooling). They can provide pricing, delivery lead times and available customization or optional accessories.
Discover our latest orders