This advanced glass tempering furnace is designed for high-efficiency, large-scale glass production. It features multiple sections for loading, heating, tempering, cooling, and unloading, all controlled through a user-friendly system. The furnace is suitable for processing glass of varying sizes and thicknesses, making it ideal for both standard and custom glass projects.
Key Sections:
Loading Section: Efficient and smooth loading process for glass sheets.
Heating Section: Uniform heat distribution to prepare glass for tempering.
Tempering Section: Specialized for toughening glass to improve its strength.
Blower System: Ensures rapid cooling for tempered glass.
Control System: Provides precise control over the entire process.
Unloading Section: Seamless unloading of processed glass.
Product Specifications:
Model
Max Glass Size (mm)
Min Glass Size (mm)
Glass Thickness (mm)
Productivity (㎡/h)
Installed Capacity (KVA)
AT-TA1225
1250×2500
100×250
3—19
53
200
AT-TA1636
1600×3660
100×250
3—19
91
400
AT-TA2036
2000×3660
100×250
4—19
126
500
AT-TA2436
2440×3660
100×300
4—25
152
630
AT-TA2442
2440×4200
100×300
4—25
173
630
AT-TA2450
2440×5000
100×300
4—25
202
800
AT-TA2460
2440×6000
100×300
4—25
245
1000
AT-TA2842
2850×4200
200×350
5—25
213
800
AT-TA2850
2850×5000
200×350
5—25
247
1000
AT-TA2860
2850×6000
200×350
5—25
301
1000
AT-TA3050
3000×5000
200×400
5—25
267
1000
AT-TA3060
3000×6000
200×400
5—25
321
1250
AT-TA3350
3300×5000
200×400
5—25
300
1000
AT-TA3360
3300×6000
200×400
5—25
352
1250
Key Features:
Versatility: Processes a wide range of glass sizes and thicknesses.
High Productivity: Delivers efficient output, ideal for large-scale production.
Precise Control: Advanced control systems for consistent and high-quality results.
Energy Efficient: Optimized to reduce energy consumption while maintaining performance.
Durability: Built to withstand continuous use with minimal maintenance.
This glass tempering furnace ensures high productivity and precision, making it an excellent choice for industries that require high-quality tempered glass for a variety of applications.
Loading Section
Heating Section
Tempering Section
Blower System
Control System
Shipping Timeframes: All orders are processed within 2-5 business days (excluding weekends and holidays). After your order has been processed, the estimated delivery time is before 11 Apr, 2025, depending on customs, Please note that due to high demand, some items may experience longer shipping times, which will be communicated at order confirmation email.
Order Processing Time: Please allow 2-5 business days for us to process your order before it is shipped . Orders placed after 16:00 on Fridays, or during weekends and public holidays, will begin processing on the next business day. Processing times may be extended during peak seasons or sales events.
Manufacturing Time: Some products needs manufacturing time, the manufacturing process will take approximately 10-30 business days depending on the product. This timeframe may vary depending on the complexity of the product and current demand. but this will be communicated with you during order confirmation.
Returns and Exchanges: We offer a 30-day return policy for most items. If you are not completely satisfied with your purchase, you may return it within 30 days of receipt for a refund or exchange. Items must be unused, in their original packaging, and accompanied by proof of purchase. Return shipping costs are the responsibility of the customer, unless the item was damaged or defective upon arrival.
0
0 Overall Rating
5
0%
0
4
0%
0
3
0%
0
2
0%
0
1
0%
0
Review this product
For you to write a review, you need to login first
At Afrimart, we strive to process all orders promptly. Once the payment has been successfully cleared into our account, your order will be processed within 2 to 5 business days. Please note that this processing time excludes weekends and public holidays.
Following the processing of your order, the estimated delivery lead time ranges between 35 to 60 days. However, please be aware that this timeframe is subject to variations due to potential delays in shipping and customs clearance. While we aim to adhere to the original delivery schedule, unforeseen circumstances may occasionally extend the delivery window beyond the anticipated 35 to 60 days.
In the event of high demand or other factors leading to longer shipping times for certain items, we will communicate any expected delays during the initial order confirmation. We appreciate your understanding and patience as we work to ensure your order arrives as swiftly as possible.