Quantity | Price |
---|
Factory Price 12 ton / h Rotary Drum Dryer Price Machine Slag Coal Slurry Sludge River Sand
ROTARY DRUM DRYER
Such dryer is a new model heavy duty dryer with an output of more than 1000t/d, which is invented and produced by our company during the long term production experience and demand of the customers. It has the features
such as: large output,stable and safe running of the equipment, high thermal efficiency, save energy and protect the environment etc, it is widely used to calcine and dry variety of materials with high humanity and very different.
Specification(m) | Production Capacity (t/h) | Power(kw) | Weight(t) |
Φ 0.6*8 | 0.5-22 | 4 | 5.1 |
Φ0.8*10 | 0.8-2.8 | 4 | 6.9 |
Φ1.0*10 | 1.0-3.5 | 5.5 | 7.5 |
Φ1.2*10 | 2.5 | 7.5 | 13.5 |
Φ1.5*12 | 3.3-4.9 | 15 | 18.9 |
Φ1.5*15 | 4-6 | 18.5 | 21 |
Φ1.8*12 | 4-6 | 18.5 | 22.83 |
Φ2.2*12 | 7-12 | 22 | 37.6 |
Φ2.2*14 | 7-12 | 22 | 40 |
Φ2.2*16 | 12 | 22 | 45 |
Φ2.4*14 | 12 | 37 | 51 |
Φ2.4*18 | 10-13 | 37 | 54 |
Φ2.4*20 | 10-14 | 37 | 54 |
Φ3*20 | 25 | 55 | 78 |
Three Drum Rotary Dryer
This Dryer adopt the newest energy saving technology in Europe--Italy structure.Inner cylinder, middle cylinder and outer cylinder are formed together into one self -insulated structure, Out of the cylinder, it is also covered by the insulated materials and steel less plate which is to reduce the hot less, and then the thermal efficiency is improved .Special thermal design philosophy is adopted to eliminate the heat loss of the wind tunnel. By increasing the heat exchange area and the Evaporation per unit volume, the heat utilization rate is improved about 40%,and the energy cost can be saved more than 50%.Due to that the area covered by the equipment is decreased, the base investment of the customer is reduced, it is suitable for coal, oil, gas and other many fuel, the user can choose the fuel according to their own situation.
At Afrimart, we strive to process all orders promptly. Once the payment has been successfully cleared into our account, your order will be processed within 2 to 5 business days. Please note that this processing time excludes weekends and public holidays.
Following the processing of your order, the estimated delivery lead time ranges between 35 to 60 days. However, please be aware that this timeframe is subject to variations due to potential delays in shipping and customs clearance. While we aim to adhere to the original delivery schedule, unforeseen circumstances may occasionally extend the delivery window beyond the anticipated 35 to 60 days.
In the event of high demand or other factors leading to longer shipping times for certain items, we will communicate any expected delays during the initial order confirmation. We appreciate your understanding and patience as we work to ensure your order arrives as swiftly as possible.