π Important:
All orders, emails, and quotations will be processed and responded to once we reopen on 3rd January 2025.
Thank you for your understanding and patience!
π Festive Closing Notice:
We will be closed from 21st December 2024 to 3rd January 2025.
Wishing you a joyous holiday season! π
* Easy maintenances β The structural parts inherit the excellent and stable quality of Shantui mature products. β The electric harnesses adopt seamless corrugated pipes and deconcentrators for branching, featuring high protection grade. β The core electric and hydraulic parts adopt imported products, featuring stable and reliable quality and extremely high reliability.
The whole machine feature high strength, high stability, and beautiful appearance. 1. The hook rod winch and working hydraulic system adopt joint venture products or imported products. 2. The pilot control mode is adopted for the operations of hook rod winch and counterweight. 3. The four-link counterweight structure is adopted. 4. Optional air conditioned cab is available. 5. The corresponding measures are taken in consideration of diversified environment adaptabilities. 6. The working device and the counterweight feature good disassembling and assembling performance.
The pipelayer is an important construction equipment in the construction of oil and natural gas pipelines. It is mainly used for the transportation of pipelines such as oil and gas, that is, pipeline transportation and piping operations, pipeline counterpart operations, and pipeline trenching operations. The pipelayer was developed and designed on the basis of the bulldozer in the 1930s. The vast majority of pipelayers produced in the world are based on bulldozer chassis
Product Parameters
Model
SP25Y
SP45Y
SP70Y
SP90Y
Weight and dimensions
Operating weight
22000 kg
34000 kg
49500 kg
55000 kg
Maximum lifting weight
25000 kg
45000 kg
70000 kg
90000 kg
Track shoe width
560 mm
610/660mm
760 mm
860 mm
Minimum turning radius
2950 mm
3200 mm
3950 mm
3950 mm
Ground length
2635 mm
3050 mm
3620 mm
3620 mm
Ground clearance
400 mm
400 mm
485 mm
550 mm
Service refill
Fuel tank capacity
300 L
440 L
550 L
550 L
Hydraulic tank capacity
148 L
180 L
196 L
196 L
Engine oil
45 L
45 L
45 L
45 L
Cooling system
62.8 L
79 L
121 L
121 L
Engine
Rated power
120 kW
169 kW
235 kW
257 kW
Model
Shangchai SC11CB184G2B1
Weichai WD10G178E25
Cumins NT855-C280S10
Cumins NTA855-C360S10
Cumins NTA855-C360S10
Piston displacement
9.7261 L
14 L
14 L
14 L
Strokeβ bore Γ stroke
6β 126 Γ 130 mm
6- 139.7 Γ 152.4 mm
6β139.7 Γ 152.4 mm
6β139.7 Γ 152.4 mm
Rated revolution
1850 rpm
2000 rpm
2000 rpm
2000 rpm
Transmission system
Type
Hydraulic transmission
Hydraulic transmission
Hydraulic transmission
Hydraulic transmission
Hydraulic torque converter
3-element, 1 stage, 1 phase
3-element, 1 stage, 1 phase
3-element, 1 stage, 1 phase
3-element, 1 stage, 1 phase
Transmission
Planetary gear, forced lubrication power shift
Planetary gear, forced lubrication power shift
Planetary gear, forced lubrication
Planetary gear, forced lubrication
Number of track rollers (each side)
7
7
9
9
Number of carriers (each side)
2
2
2
2
Travel speed 1st (forward/reverse)
3.29/4.28 km/h
3.8/4.9 km/h
3.7/4.5 km/h
3.6/4.4 km/h
Travel speed 2nd (forward/reverse)
5.82/7.59 km/h
6.8/8.5 km/h
6.8/8.2 km/h
6.6/7.8 km/h
Travel speed 3rd (forward/reverse)
9.63/12.53 km/h
9.63/12.53 km/h
9.63/12.53 km/h
-
Working pump
Type
Duplex pump
Duplex pump
Duplex pump
Duplex pump
Displacement of large pump
100 ml/r
116 ml/r
201.49 ml/r
225 ml/r
Displacement of small pump
10 ml/r
10 ml/r
10.16 ml/r
201 ml/r
Rated working pressure
18 MPa
18 MPa
20 MPa
21 MPa
Pipelaying equipment
Boom Length
5500 mm(6100 mm)
6500 mm(7500 mm)
7300 mm(9000 mm)
8600 mm
Max.lifting height
4400 mm
5250 mm
6550 mm
7000 mm
Boom swing amplitude
1220~5400 mm
1220~6650 mm
1200~7200 mm
1200~7200 mm
Boom Line speed
0~12 m/min
0~6 m/min
0~6 m/min
6 m/min
Gradeability
20Β°
20Β°
20Β°
20Β°
Ground press
0.07 MPa
0.086 MPa
0.086 MPa
0.0866 MPa
Shipping Timeframes: All orders are processed within 2-5 business days (excluding weekends and holidays). After your order has been processed, the estimated delivery time is before 22 Feb, 2025, depending on customs, Please note that due to high demand, some items may experience longer shipping times, which will be communicated at order confirmation email.
Order Processing Time: Please allow 2-5 business days for us to process your order before it is shipped . Orders placed after 16:00 on Fridays, or during weekends and public holidays, will begin processing on the next business day. Processing times may be extended during peak seasons or sales events.
Manufacturing Time: Some products needs manufacturing time, the manufacturing process will take approximately 10-30 business days depending on the product. This timeframe may vary depending on the complexity of the product and current demand. but this will be communicated with you during order confirmation.
Returns and Exchanges: We offer a 30-day return policy for most items. If you are not completely satisfied with your purchase, you may return it within 30 days of receipt for a refund or exchange. Items must be unused, in their original packaging, and accompanied by proof of purchase. Return shipping costs are the responsibility of the customer, unless the item was damaged or defective upon arrival.
0
0 Overall Rating
5
0%
0
4
0%
0
3
0%
0
2
0%
0
1
0%
0
Review this product
For you to write a review, you need to login first
Afrimart Online stands as Africa's foremost e-commerce hub, featuring an expansive array of product categories spanning electronics, machinery, toys, furniture, and more. Committed to excellence, our platform delivers swift and streamlined logistics and customs clearance solutions, offering a comprehensive one-stop service for cross-border imports.
Leveraging over three decades of international trade expertise, we ensure a seamless and hassle-free importing experience, providing top-tier products at competitive prices to meet the diverse needs of African consumers.
At Afrimart, we strive to process all orders promptly. Once the payment has been successfully cleared into our account, your order will be processed within 2 to 5 business days. Please note that this processing time excludes weekends and public holidays.
Following the processing of your order, the estimated delivery lead time ranges between 35 to 60 days. However, please be aware that this timeframe is subject to variations due to potential delays in shipping and customs clearance. While we aim to adhere to the original delivery schedule, unforeseen circumstances may occasionally extend the delivery window beyond the anticipated 35 to 60 days.
In the event of high demand or other factors leading to longer shipping times for certain items, we will communicate any expected delays during the initial order confirmation. We appreciate your understanding and patience as we work to ensure your order arrives as swiftly as possible.