This Automatic Filling Machine is designed to fill liquid products accurately and efficiently into bottles. It offers high precision with a filling accuracy of 0.05% and is capable of handling a wide range of bottle volumes. With different model options and filling speeds, it suits various production scales, from small batches to high-volume production lines. The system uses advanced PLC control with a touch screen interface for easy operation and adjustments.
Specifications
Feature
OM-AT-L4
OM-AT-L6
OM-AT-L8
OM-AT-L16
Metering Range
40-1000ml
40-1000ml
40-1000ml
40-1000ml
Filling Accuracy
0.05% F.S.
0.05% F.S.
0.05% F.S.
0.05% F.S.
Filling Speed
0-900 bph
0-1500 bph
0-2400 bph
0-3600 bph
Air Pressure
0.5-0.7 MPa
0.5-0.7 MPa
0.5-0.7 MPa
0.5-0.7 MPa
Gas Consumption
200L/T
200L/T
200L/T
200L/T
Voltage/Power
380V 50HZ / 1.0KW
380V 50HZ / 1.0KW
380V 50HZ / 1.0KW
380V 50HZ / 1.5KW
Weight
260Kg
260Kg
260Kg
260Kg
Size (cm)
40080210
40080210
40080210
60083220
Bottled Water Plant Machinery
Bottle Making: Full Automatic or Semi-Automatic Bottle Blow Machine.
Water Filtration: RO Water Purification or UF Mineral Water Filtration Machine.
Filling: Bottle Washing, Filling, and Capping Machine.
Labeling: Shrink Sleeve Labeling Machine or Sticker Labeling Machine.
Printing: Date Printing Machine.
Packaging: Full Automatic or Semi-Automatic Shrink Wrapping Packing Machine, Carton Box Packing Machine.
Product Features
Made of Selected Materials: Only high-quality materials are used to ensure long-lasting performance and top-tier filling results.
Touch Screen Operation: The PLC programmable control system with a touch screen human-machine interface makes adjustments and operation easier than ever.
Quantitative Filling: The system allows one-touch adjustments via the touch screen, and the quick connection design makes it easy to disassemble and clean. The diving mode ensures no water dripping during filling.
High-Quality Three-Way Valve: The machine is equipped with a three-way valve that eliminates dead corners and residue, ensuring hygienic and efficient filling.
Factory Real Shot
The factory images show the robust construction and high-quality materials used in manufacturing this filling machine, ensuring reliability and durability in production environments.
Product Details
Shipping Timeframes: All orders are processed within 2-5 business days (excluding weekends and holidays). After your order has been processed, the estimated delivery time is before 24 Apr, 2025, depending on customs, Please note that due to high demand, some items may experience longer shipping times, which will be communicated at order confirmation email.
Order Processing Time: Please allow 2-5 business days for us to process your order before it is shipped . Orders placed after 16:00 on Fridays, or during weekends and public holidays, will begin processing on the next business day. Processing times may be extended during peak seasons or sales events.
Manufacturing Time: Some products needs manufacturing time, the manufacturing process will take approximately 10-30 business days depending on the product. This timeframe may vary depending on the complexity of the product and current demand. but this will be communicated with you during order confirmation.
Returns and Exchanges: We offer a 30-day return policy for most items. If you are not completely satisfied with your purchase, you may return it within 30 days of receipt for a refund or exchange. Items must be unused, in their original packaging, and accompanied by proof of purchase. Return shipping costs are the responsibility of the customer, unless the item was damaged or defective upon arrival.
0
0 Overall Rating
5
0%
0
4
0%
0
3
0%
0
2
0%
0
1
0%
0
Review this product
For you to write a review, you need to login first
At Afrimart, we strive to process all orders promptly. Once the payment has been successfully cleared into our account, your order will be processed within 2 to 5 business days. Please note that this processing time excludes weekends and public holidays.
Following the processing of your order, the estimated delivery lead time ranges between 35 to 60 days. However, please be aware that this timeframe is subject to variations due to potential delays in shipping and customs clearance. While we aim to adhere to the original delivery schedule, unforeseen circumstances may occasionally extend the delivery window beyond the anticipated 35 to 60 days.
In the event of high demand or other factors leading to longer shipping times for certain items, we will communicate any expected delays during the initial order confirmation. We appreciate your understanding and patience as we work to ensure your order arrives as swiftly as possible.