PVC series pipes are mainly used for agricultural water supply system, sewer system, waters discharge systems for civil and industrial buildings, cable conduits, protection sheathing for electric cables, etc.
PVC Series pipe solution, equipped with new design high-efficiency twin-screw conical extruder, which is high speed high efficiency; Reasonable flow channel design, accurate melting temperature control; planetary non-dust cutting, uniform chamfering.
Model
Pipe range (mm)
Extruder model
Output(kg/h)
Extruder motor power(kw)
ACM-63PVC
Φ16-63 Dual pipe
SJZ65/132
280-350
37
ACM-110PVC
Φ50-110 Dual pipe
SZJ80/156
400-550
55
ACM-160PVC
Φ40-160
SJZ65/132
280-350
37
ACM-250PVC
Φ50-250
SJZ65/132
280-350
37
ACM-315PVC
Φ160-450
SZJ80/156
400-550
75
ACM-450PVC
Φ280-630
SZJ80/156
400-550
75
ACM-630PVC
Φ315-800
SZJ92/188
750-850
110
ACM-800PVC
Φ500-1200
SZJ105/216
900-1100
160
Detailed Images
Main electric part supplier
Inverter: ABBAir Switch: LS Contactor: SchneiderRelay &Temperature controller: Omron
Conical double screw extruder
Technical parameter
Material of screw: 38CrMoAl
Heating zones: 4 Heating power: 35kw
Cooling mode: Air fans
Driving motor: 55KW (siemens)Dosing feeding motor: 1.5KWVacuum pump: 1 set
Cool mode: Air fans: 3 Sets
Mould
Technical parameter
Include calibration sleeveMaterial: Made by 40Cr.Diameter spec: Ф160, 200, 250, 315 mm
Wall thickness:Providing by customerQTY. of heating zone:14 Heating power: 32KW
scrap collecting device;Independent control system
Cutting method: mechanical enter knifeDiameter of saw: 130mmCutting motor: 2.2KWRevolution motor: 1.5KWCutting saw: steel alloyDuralumin clamping for accurate cutting.Dust collection motor power 0.75KWWith chamfering function
PVC 2 strand pipe extrusion line,We can customize the size of the tube, the output and the number of strands according to customer needs.
Shipping Timeframes: All orders are processed within 2-5 business days (excluding weekends and holidays). After your order has been processed, the estimated delivery time is before 23 Jan, 2025, depending on customs, Please note that due to high demand, some items may experience longer shipping times, which will be communicated at order confirmation email.
Order Processing Time: Please allow 2-5 business days for us to process your order before it is shipped . Orders placed after 16:00 on Fridays, or during weekends and public holidays, will begin processing on the next business day. Processing times may be extended during peak seasons or sales events.
Manufacturing Time: Some products needs manufacturing time, the manufacturing process will take approximately 10-30 business days depending on the product. This timeframe may vary depending on the complexity of the product and current demand. but this will be communicated with you during order confirmation.
Returns and Exchanges: We offer a 30-day return policy for most items. If you are not completely satisfied with your purchase, you may return it within 30 days of receipt for a refund or exchange. Items must be unused, in their original packaging, and accompanied by proof of purchase. Return shipping costs are the responsibility of the customer, unless the item was damaged or defective upon arrival.
0
0 Overall Rating
5
0%
0
4
0%
0
3
0%
0
2
0%
0
1
0%
0
Review this product
For you to write a review, you need to login first
Afrimart Online stands as Africa's foremost e-commerce hub, featuring an expansive array of product categories spanning electronics, machinery, toys, furniture, and more. Committed to excellence, our platform delivers swift and streamlined logistics and customs clearance solutions, offering a comprehensive one-stop service for cross-border imports.
Leveraging over three decades of international trade expertise, we ensure a seamless and hassle-free importing experience, providing top-tier products at competitive prices to meet the diverse needs of African consumers.
At Afrimart, we strive to process all orders promptly. Once the payment has been successfully cleared into our account, your order will be processed within 2 to 5 business days. Please note that this processing time excludes weekends and public holidays.
Following the processing of your order, the estimated delivery lead time ranges between 35 to 60 days. However, please be aware that this timeframe is subject to variations due to potential delays in shipping and customs clearance. While we aim to adhere to the original delivery schedule, unforeseen circumstances may occasionally extend the delivery window beyond the anticipated 35 to 60 days.
In the event of high demand or other factors leading to longer shipping times for certain items, we will communicate any expected delays during the initial order confirmation. We appreciate your understanding and patience as we work to ensure your order arrives as swiftly as possible.