PP PLA Drink Straw Making Machine PVC pipe extrusion machine hot sale
The straw production line is an automated equipment used to produce various types and sizes of straws, usually consisting of multiple separate equipment, including straw extrusion molding machines, cooling tanks, cutting machines, packaging machines, etc.
Technology parameter
Model
ORXG-12
ORXG11-50
ORXG11-65
ORXG12-PLA
Feature
Material
PP
PLA PP PE
PLA PP PE
PLA/PP
Color
2
1
1
2
Straw diameter
φ3.0 ~ φ12 mm
φ3.0 ~ φ12 mm
φ3.0 ~ φ12 mm
φ3.0 ~ φ12 mm
thickness
0.10 ~ 0.35 mm
0.10 ~ 0.35 mm
0.10 ~ 0.35 mm
0.10 ~ 0.35 mm
Straw length
80 ~ 300 mm
80 ~ 300 mm
80 ~ 300 mm
80 ~ 300 mm
Stripes
Straight or Helical
Straight or Helical
Straight or Helical
Straight or Helical
Capability
400 ~ 1800 pcs/min
400 ~ 1800 pcs/min
400 ~ 1800 pcs/min
400 ~ 1800 pcs/min
Extruding output range
20 ~40 kgs/hr
30 ~ 50 kgs/hr
60 ~100 kgs/hr
20 ~ 40 kgs/hr
Extruder
Main Screw diameter
φ50 mm ( BM Screw)
Φ50 mm ( BM Screw)
Φ65mm ( BM Screw)
φ50 mm ( BM Screw)
Screw L/D
28 : 1
33 : 1
33 : 1
33 : 1
Main driving motor
11 Kw
22 Kw
30 Kw
18.5 Kw
Vice screw diameter
φ25 mm×1
φ25 mm×1
0
φ25 mm×1
Vice driving motor
0.75Kw ×1
0.75Kw ×1
0
0.75Kw ×1
Gearbox
ZLY133
ZLY146 hardened face gear
ZY173
ZLY146 hardened face gear
Automatic thermo-controller
8 sets
6 sets
6 sets
8 sets
Heating power
11.63 kw
1set
1set
11.63 kw
Water cooling tank
Forming device
1 set
1 set
1 set
1 set
Vacuum Pump motor
1.1 kw(choose)
1.1 kw(choose)
1.1 kw(choose)
1.1 kw(choose)
Water storage tank
3400 mm /304 Steel stainless
5600 mm /304 Steel stainless
3800 mm /304 Steel stainless
3400 mm /304 Steel stainless
Base frame material
304 Steel stainless
304 Steel stainless
304 Steel stainless
304 Steel stainless
Blow dry device
1 set
3 set
3 set
1 set
Take up & Cutting Unit
Take up unit
1 set
1 set
1 set
1 set
traction motor
0.75kW×1
0.75kW×1
0.75kW×1
0.75kW×1
Cutting knife unit
1 set
1 set
1 set
1 set
Cutting motor
0.75kW×1
1.5kW×1
1.5kW×1
0.75kW×1
angle of port
90°/60°/45°
90°/60°/45°
90°/60°/45°
90°/60°/45°
Machine details
Shipping Timeframes: All orders are processed within 2-5 business days (excluding weekends and holidays). After your order has been processed, the estimated delivery time is before 23 Jan, 2025, depending on customs, Please note that due to high demand, some items may experience longer shipping times, which will be communicated at order confirmation email.
Order Processing Time: Please allow 2-5 business days for us to process your order before it is shipped . Orders placed after 16:00 on Fridays, or during weekends and public holidays, will begin processing on the next business day. Processing times may be extended during peak seasons or sales events.
Manufacturing Time: Some products needs manufacturing time, the manufacturing process will take approximately 10-30 business days depending on the product. This timeframe may vary depending on the complexity of the product and current demand. but this will be communicated with you during order confirmation.
Returns and Exchanges: We offer a 30-day return policy for most items. If you are not completely satisfied with your purchase, you may return it within 30 days of receipt for a refund or exchange. Items must be unused, in their original packaging, and accompanied by proof of purchase. Return shipping costs are the responsibility of the customer, unless the item was damaged or defective upon arrival.
0
0 Overall Rating
5
0%
0
4
0%
0
3
0%
0
2
0%
0
1
0%
0
Review this product
For you to write a review, you need to login first
Afrimart Online stands as Africa's foremost e-commerce hub, featuring an expansive array of product categories spanning electronics, machinery, toys, furniture, and more. Committed to excellence, our platform delivers swift and streamlined logistics and customs clearance solutions, offering a comprehensive one-stop service for cross-border imports.
Leveraging over three decades of international trade expertise, we ensure a seamless and hassle-free importing experience, providing top-tier products at competitive prices to meet the diverse needs of African consumers.
At Afrimart, we strive to process all orders promptly. Once the payment has been successfully cleared into our account, your order will be processed within 2 to 5 business days. Please note that this processing time excludes weekends and public holidays.
Following the processing of your order, the estimated delivery lead time ranges between 35 to 60 days. However, please be aware that this timeframe is subject to variations due to potential delays in shipping and customs clearance. While we aim to adhere to the original delivery schedule, unforeseen circumstances may occasionally extend the delivery window beyond the anticipated 35 to 60 days.
In the event of high demand or other factors leading to longer shipping times for certain items, we will communicate any expected delays during the initial order confirmation. We appreciate your understanding and patience as we work to ensure your order arrives as swiftly as possible.