The XCM-G 10t XCH907K is an empty container handler designed for efficient handling of containers in various construction and industrial works. It is built to handle ISO 20’ and 40’ containers and features a robust engine, transmission system, and excellent lifting capabilities.
Key Features:
Engine: Powered by a VOLVO TAD851VE engine providing a rated power of 185 kW at 2200 rpm and a maximum torque of 1160 Nm at 1350 rpm.
Gearbox: Equipped with a DANA 13.7HR32334 gearbox for smooth and reliable transmission.
Drive Axle: Kessler D81PL488 for enhanced stability and durability.
Spreader Model: XDJ90 with a side shift distance of 600 mm for accurate container placement.
Self-respect Capacity: Handles containers with a self-respect of 4.7t.
Tires: 14.00-24-28PR, providing strong grip and support for heavy loads.
Specifications:
Parameter
Unit
XCH907K
Engine Model
-
VOLVO TAD851VE
Rated Power/Speed
kW/rpm
185/2200
Maximum Torque/Speed
Nm/rpm
1160/1350
Exhaust Emission Standards
-
3 stages
Gearbox Model
-
DANA 13.7HR32334
Drive Axle Model
-
Kessler D81PL488
Spreader Model
-
XDJ90
Side Shift Distance
mm
600
Self-respect
t
4.7
Suitable for
-
ISO 20’/40’ container
Tires
-
14.00-24-28PR
Optional Configuration:
Tire pressure monitoring system
Bromma spreader
TE14 gearbox
Applications:
Ideal for handling empty containers in construction works, warehouses, and logistics yards.
Designed for efficient container lifting, stacking, and transportation tasks.
Advantages:
High Efficiency: With a strong 185 kW engine and reliable transmission, this handler ensures smooth and efficient operations.
Versatility: Can handle both 20’ and 40’ ISO containers, making it ideal for various container handling tasks.
Durability: Built with high-quality components like Kessler axles and DANA gearbox, ensuring longevity and performance in demanding environments.
The XCM-G 10t XCH907K is a powerful and versatile container handler designed for heavy-duty applications in construction and industrial works, offering enhanced productivity and efficiency in container management.
Spec
Unit
AX1015/E
AX1030/E
AX2060/E
AX2080/E
Capacity
L
15
30
60
80
Filter area 1
CM3
10800
10800
22680
22680
Filter area 2
CM3
6480
6480
16200
16200
Air flow
M3/H
150
150
280
280
Noise
DB
53
53
53
53
Vacuum suction
MBAR
280
280
280
280
Net weight
KG
11
13
26.5
27.5
Detailed Images
Shipping Timeframes: All orders are processed within 2-5 business days (excluding weekends and holidays). After your order has been processed, the estimated delivery time is before 31 Mar, 2025, depending on customs, Please note that due to high demand, some items may experience longer shipping times, which will be communicated at order confirmation email.
Order Processing Time: Please allow 2-5 business days for us to process your order before it is shipped . Orders placed after 16:00 on Fridays, or during weekends and public holidays, will begin processing on the next business day. Processing times may be extended during peak seasons or sales events.
Manufacturing Time: Some products needs manufacturing time, the manufacturing process will take approximately 10-30 business days depending on the product. This timeframe may vary depending on the complexity of the product and current demand. but this will be communicated with you during order confirmation.
Returns and Exchanges: We offer a 30-day return policy for most items. If you are not completely satisfied with your purchase, you may return it within 30 days of receipt for a refund or exchange. Items must be unused, in their original packaging, and accompanied by proof of purchase. Return shipping costs are the responsibility of the customer, unless the item was damaged or defective upon arrival.
0
0 Overall Rating
5
0%
0
4
0%
0
3
0%
0
2
0%
0
1
0%
0
Review this product
For you to write a review, you need to login first
At Afrimart, we strive to process all orders promptly. Once the payment has been successfully cleared into our account, your order will be processed within 2 to 5 business days. Please note that this processing time excludes weekends and public holidays.
Following the processing of your order, the estimated delivery lead time ranges between 35 to 60 days. However, please be aware that this timeframe is subject to variations due to potential delays in shipping and customs clearance. While we aim to adhere to the original delivery schedule, unforeseen circumstances may occasionally extend the delivery window beyond the anticipated 35 to 60 days.
In the event of high demand or other factors leading to longer shipping times for certain items, we will communicate any expected delays during the initial order confirmation. We appreciate your understanding and patience as we work to ensure your order arrives as swiftly as possible.