Electric hydraulic grab bucket for crane that can open and close to grasp the sediment and all kinds of bulk cargo. It is a kind of spreader that mainly rely on the left and right two combined bucket or multiple jaw opening crawl and unloading material.
Specialized in handling all kinds Powder and Granular bulk materials. The grab adapts Single twisted axis bucket. The grab overall structure is light and durable, offering high grabbing ratio, strong closing force and high material filling rate. We can also supply dust cover, cutting edge sealing parts according to the environmental requirement, marine environmental and other special working condition. Design for working with tower crane, ship crane, and unloading ship crane. Widely used in Wharf, steel mills, power plants, ships, etc.
Technical Data
Grab Bucket Parameter
Model
LD1
LD2
LD3
LD4
Volume
M3
0.5
1
1.5
0.75
Type
Heavy
Heavy
Medium
Heavy
Proportion of materials
t/m3
1.2
1.6-2
1.7-1.8
1.2
Capturing the materials
t
1.3
1.3-1.73
2.1-2.3
1.3
Percentage of pulley
4
4
4
4
The diameter of steel wires
mm
9.2
19
19.5
9.2
The diameter of pulley
mm
250
260
260
250
Tons of the match hoist crane
t
3
5
5
3
Self-weight of grab
t
0.93
2.35
3.1
1.53
Total height of grab
mm
1860
1941
2720
2250
Notes
Design as customer’s demand
Above information just for reference, detail parameter based on different lifting weight.
Product Advantage
1) Simple structure ,easy in installation and maintain.
2) Adopting advanced world famous brand components in electric parts and operation parts.
3) with the great abrasive resistance, high strength and can grab the material very well.
4) Running in a high authorization and internationalization,no pollution
5) Widely used in Wharf, steel mills, power plants, ships, etc.
Aplication
It has been widely used in ports,steel plants,power stations,ships and garbage treatment,plants, and is used together with tower cranes,ship cranes,ship unloaders,traveling cranes and other type of cranes.The grab has its own hydraulic system,the key elements of which are of recognized brand imported abroad which ensure the high performance of the grab.
Shipping Timeframes: All orders are processed within 2-5 business days (excluding weekends and holidays). After your order has been processed, the estimated delivery time is before 27 Nov, 2024, depending on customs, Please note that due to high demand, some items may experience longer shipping times, which will be communicated at order confirmation email.
Order Processing Time: Please allow 2-5 business days for us to process your order before it is shipped . Orders placed after 16:00 on Fridays, or during weekends and public holidays, will begin processing on the next business day. Processing times may be extended during peak seasons or sales events.
Manufacturing Time: Some products needs manufacturing time, the manufacturing process will take approximately 10-30 business days depending on the product. This timeframe may vary depending on the complexity of the product and current demand. but this will be communicated with you during order confirmation.
Returns and Exchanges: We offer a 30-day return policy for most items. If you are not completely satisfied with your purchase, you may return it within 30 days of receipt for a refund or exchange. Items must be unused, in their original packaging, and accompanied by proof of purchase. Return shipping costs are the responsibility of the customer, unless the item was damaged or defective upon arrival.
0
0 Overall Rating
5
0%
0
4
0%
0
3
0%
0
2
0%
0
1
0%
0
Review this product
For you to write a review, you need to login first
Afrimart Online stands as Africa's foremost e-commerce hub, featuring an expansive array of product categories spanning electronics, machinery, toys, furniture, and more. Committed to excellence, our platform delivers swift and streamlined logistics and customs clearance solutions, offering a comprehensive one-stop service for cross-border imports.
Leveraging over three decades of international trade expertise, we ensure a seamless and hassle-free importing experience, providing top-tier products at competitive prices to meet the diverse needs of African consumers.
At Afrimart, we strive to process all orders promptly. Once the payment has been successfully cleared into our account, your order will be processed within 2 to 5 business days. Please note that this processing time excludes weekends and public holidays.
Following the processing of your order, the estimated delivery lead time ranges between 35 to 60 days. However, please be aware that this timeframe is subject to variations due to potential delays in shipping and customs clearance. While we aim to adhere to the original delivery schedule, unforeseen circumstances may occasionally extend the delivery window beyond the anticipated 35 to 60 days.
In the event of high demand or other factors leading to longer shipping times for certain items, we will communicate any expected delays during the initial order confirmation. We appreciate your understanding and patience as we work to ensure your order arrives as swiftly as possible.