Fruit: apple, pear, pineapple, lemon, raspberry, blueberry, cantaloupe, watermelon, coconut, grape, pure seabuckthorn fruit and other fruit juice.
Vegetables: ginger, garlic, onion, wheat seedling, tomato, carrot, leek, cabbage, green vegetables, pumpkin, cucumber and other vegetables juice.
Product Parameter
Structure
It is composed of front support, feed hopper, screw, filter screen, juice holder, back support, slag discharge groove and other parts. The spiral spindle is supported in the rolling bearing, and the right end is supported in the handwheel bearing. The motor drives the screw through a pair of triangular pulleys.
Model
KLCY-0.5
KLCY-1.5
KLCYP-0.5
KLCYP-1.5
Voltage
220V/380V
220V/380V
220V/380V
220V/380V
Power
2.2KW/1.5KW
4KW/4KW
1.5+2.2KW/0.75+1.5KW
2.2+4KW/2.2+4KW
Capacity
0.5T/H
1.5T/H
0.5T/H
1.5T/H
Size
1100×320×920MM
1280×520×1340MM
1100×350×1280MM
1280×550×1485MM
Weight
83KG
250KG
200KG
550KG
Type
Without crusher
Without crusher
With crusher
With crusher
More real pictures
The main component of the equipment is that the bottom diameter of the screw is gradually increased along the direction of the slag outlet and the screw pitch is gradually reduced. When the material is pushed by the screw, the volume of the screw cavity is reduced to form the squeezing of the material.
The rotation direction of the spiral spindle is clockwise, looking from the hopper to the slag tank.
Product Usage
The raw material is added into the hopper and pressed under the push of the screw. The pressed juice flows into the juice collector at the bottom through the filter screen, while the waste is discharged through the annular void formed between the screw and the conical part of the pressure regulating.
Installation operation and maintenance
1. The machine must be installed horizontally and fixed with foundation screws.
2. Operation: when the equipment is started, the pressure head should be adjusted to make the annular clearance to the maximum, and then the clearance is gradually reduced to meet the process requirements.
Then fix the position of the handwheel bearing seat with the brake.
3, the feeding must be uniform, it is forbidden to enter the hopper hard foreign matter, so as not to damage the screen. In this case, the net is washed once more, and all the machines are cleaned with hot water after the pressing is finished.
4. Maintenance: the filter must be washed with water and a brush after each shift. If more fine filter fiber juice, depending on the production situation.
5. The bearing should be replaced with clean grease regularly, and the normal working temperature of the bearing should be less than 75 degrees.
Shipping Timeframes: All orders are processed within 2-5 business days (excluding weekends and holidays). After your order has been processed, the estimated delivery time is before 22 Jan, 2025, depending on customs, Please note that due to high demand, some items may experience longer shipping times, which will be communicated at order confirmation email.
Order Processing Time: Please allow 2-5 business days for us to process your order before it is shipped . Orders placed after 16:00 on Fridays, or during weekends and public holidays, will begin processing on the next business day. Processing times may be extended during peak seasons or sales events.
Manufacturing Time: Some products needs manufacturing time, the manufacturing process will take approximately 10-30 business days depending on the product. This timeframe may vary depending on the complexity of the product and current demand. but this will be communicated with you during order confirmation.
Returns and Exchanges: We offer a 30-day return policy for most items. If you are not completely satisfied with your purchase, you may return it within 30 days of receipt for a refund or exchange. Items must be unused, in their original packaging, and accompanied by proof of purchase. Return shipping costs are the responsibility of the customer, unless the item was damaged or defective upon arrival.
0
0 Overall Rating
5
0%
0
4
0%
0
3
0%
0
2
0%
0
1
0%
0
Review this product
For you to write a review, you need to login first
Afrimart Online stands as Africa's foremost e-commerce hub, featuring an expansive array of product categories spanning electronics, machinery, toys, furniture, and more. Committed to excellence, our platform delivers swift and streamlined logistics and customs clearance solutions, offering a comprehensive one-stop service for cross-border imports.
Leveraging over three decades of international trade expertise, we ensure a seamless and hassle-free importing experience, providing top-tier products at competitive prices to meet the diverse needs of African consumers.
At Afrimart, we strive to process all orders promptly. Once the payment has been successfully cleared into our account, your order will be processed within 2 to 5 business days. Please note that this processing time excludes weekends and public holidays.
Following the processing of your order, the estimated delivery lead time ranges between 35 to 60 days. However, please be aware that this timeframe is subject to variations due to potential delays in shipping and customs clearance. While we aim to adhere to the original delivery schedule, unforeseen circumstances may occasionally extend the delivery window beyond the anticipated 35 to 60 days.
In the event of high demand or other factors leading to longer shipping times for certain items, we will communicate any expected delays during the initial order confirmation. We appreciate your understanding and patience as we work to ensure your order arrives as swiftly as possible.