Let's make a brife introduce about our HY-7660 theremoforming machine. First, compared with previous normal vacuum machine, our HY-7660 is a fully automatic plastic theremofroming machine which integrated sheet loading, sheet convey,heating, forming, cutting ,stacking and rewinding. Becuase of the fully automatic which brings high speed, more efficiency, lower human resouce cost (as vacuum theremofroming macine speed is around 8-10 cycles/min but our HY-7660 can reach up to 30 cycles/min. The working theory is a combination of pastive and negative pressure with assiting strenthing in mould by some nylon plugs.Which makes it have more powerful ability of making products. So it brings wider application just like big deep and more complicated botton. HY-7660 is driven by full servo motor, which makes more precise, more efficient, lower noise, longer machine using time. HY-7660 final products will have a widely used, such as food container, egg tray, seedling plate, plate, coffee lid etc.
Process Flow Diagram
Efficient production
The four-station plastic thermoforming machine is an advanced equipment designed for efficient and large-scale production of plastic products. It can quickly produce plastic products of various shapes and specifications by heating, forming, punching, cutting, stacking and other operations on plastic sheets.
Application
Plastic lids
Plastic bowls
Plastic packaging trays
Plastic egg trays
Plastic takeaway boxes
Plastic clamshell boxes
Technical Parameter
Technical Parameters
Station
Four stations
Three station
Four stations
Three station
Model
HY-700AF
HY-7660
HY-520AF
HY-520A
Forming Area
760mm x 600 mm
520mm x 400 mm
Forming Depth (Max.)
125mm
110mm
Sheet thickness
0.1-2.0mm
Forming Speed (Max.)
30times/min
Air pressure
0.6-0.8mpa
Air consumption
3.6 m³/min
3.0 m³/min
Water consumption
0.7 m³/h
Sheet width (Max.)
730mm
570mm
Suitable Sheet
PP, PS, HIPS, PET, PVC, PLA etc.
Power supply
AC 380V, 50Hz, Three-phase, Four-wire
Used power
105Kw
95Kw
55Kw
50Kw
Rated power
210Kw
190kw
110Kw
100Kw
Heating power
118Kw
75Kw
Procedure
Forming-punching-cutting-stacking
Forming-cutting-stacking
Forming-punching-cutting-stacking
Forming-cutting-stacking
Dimension
L13000*W4700*H2750mm
L12540*W3200*H3200mm
L11000*W4600*H2700mm
L9700*W4600*H2700mm
Weight
About 25.0T
About 14.0T
About 11.0T
About 9.0T
Product Display
Feeding station
Dual-station coil supply device, the maximum coil diameter is 900mm. The system automatically transports the sheet to the heating station.
Heating station
The efficient heating system uses infrared heating technology to evenly heat the plastic sheet, ensuring that the material is evenly heated to reach the optimal molding temperature.
Forming station
Advanced mold design and pressing technology enable the plastic sheets to be precisely formed in the molding mold, ensuring the consistency and high quality of each product.
Punching station
The press drives the punch to press down quickly, and the plastic product is punched through the punching die.
Cutting station
The automatic cutting system cuts the formed products into individual finished products according to the preset program, with neat cutting edges and no secondary processing required.
Stacking station
It adopts push-down palletizing method and replaceable suction rod device to meet the needs of different products. It is economical and meets the requirements of most products. The palletizing is driven by servo motor with high precision and high efficiency.
Control panel
The touch screen human-machine interface is convenient and fast. It can store 100 sets of mold data and corresponding parameters for easy access. It can accurately control key parameters such as temperature, time, and pressure to ensure the stability of the production process and product quality. Real-time data monitoring and feedback facilitate operators to adjust production parameters in a timely manner.
Shipping Timeframes: All orders are processed within 2-5 business days (excluding weekends and holidays). After your order has been processed, the estimated delivery time is before 23 Jan, 2025, depending on customs, Please note that due to high demand, some items may experience longer shipping times, which will be communicated at order confirmation email.
Order Processing Time: Please allow 2-5 business days for us to process your order before it is shipped . Orders placed after 16:00 on Fridays, or during weekends and public holidays, will begin processing on the next business day. Processing times may be extended during peak seasons or sales events.
Manufacturing Time: Some products needs manufacturing time, the manufacturing process will take approximately 10-30 business days depending on the product. This timeframe may vary depending on the complexity of the product and current demand. but this will be communicated with you during order confirmation.
Returns and Exchanges: We offer a 30-day return policy for most items. If you are not completely satisfied with your purchase, you may return it within 30 days of receipt for a refund or exchange. Items must be unused, in their original packaging, and accompanied by proof of purchase. Return shipping costs are the responsibility of the customer, unless the item was damaged or defective upon arrival.
0
0 Overall Rating
5
0%
0
4
0%
0
3
0%
0
2
0%
0
1
0%
0
Review this product
For you to write a review, you need to login first
Afrimart Online stands as Africa's foremost e-commerce hub, featuring an expansive array of product categories spanning electronics, machinery, toys, furniture, and more. Committed to excellence, our platform delivers swift and streamlined logistics and customs clearance solutions, offering a comprehensive one-stop service for cross-border imports.
Leveraging over three decades of international trade expertise, we ensure a seamless and hassle-free importing experience, providing top-tier products at competitive prices to meet the diverse needs of African consumers.
At Afrimart, we strive to process all orders promptly. Once the payment has been successfully cleared into our account, your order will be processed within 2 to 5 business days. Please note that this processing time excludes weekends and public holidays.
Following the processing of your order, the estimated delivery lead time ranges between 35 to 60 days. However, please be aware that this timeframe is subject to variations due to potential delays in shipping and customs clearance. While we aim to adhere to the original delivery schedule, unforeseen circumstances may occasionally extend the delivery window beyond the anticipated 35 to 60 days.
In the event of high demand or other factors leading to longer shipping times for certain items, we will communicate any expected delays during the initial order confirmation. We appreciate your understanding and patience as we work to ensure your order arrives as swiftly as possible.