π Important:
All orders, emails, and quotations will be processed and responded to once we reopen on 3rd January 2025.
Thank you for your understanding and patience!
π Festive Closing Notice:
We will be closed from 21st December 2024 to 3rd January 2025.
Wishing you a joyous holiday season! π
100 litre mash tun microbrewery beer mash tun 100l
The brewhouse is the heart of every brewery and therefore crucial to the quality of the beer. Hulkβs brewhouse technology guarantees an effective, economic and at the same time gentle production of wort without compromising on bequality. Above all, the focus lies in addition to economic advantages, ultimate flebilit and eas handlin on the hihest ualit wort with high extract yields.
How to place an order?
1-Consult
2-Quotation
3-Process Evaluation
we will recommend the most suitable equipments to you after being informed by your requirements, such as the per day producing capacity you want, the appearance of the equipment, the site size (Length*Width*Height) which you place your brewing equipment and other requirements.
We will supply you with our detail quotation according to our consulted Beer Brewing equipments which with best quality and competitive price.
Both sides carefully evaluate and discuss all the details(including technical parameters,specifications and business terms) of the order, in case to exclude any misunderstanding.
4-Placing Order
5-Production
6-Quality Control
If without any doubt, we will send you the PI(Proforma invoice), after you pay the payment, please send us the bank slip.
We will send you the latest news and pictures about your equipment each step during the production.
The whole production procedure will be under regular inspection and strict quality control. And also we can apply the certificate you want.
Product Description
Today, we mainly introduce the 100l 2 vessel beer brewing equipment, Our 100l 2 vessel beer brewing equipment have complete sytem( In moved platform).
3D drawing
HULK 100l beer equipment has been widely used around the world, such as home brewing, small breweries, pubs, restaurants, hotels, brewpubs, bars, teaching laboratories and leisure field.
We have more incredible selection! We can desiign your equipment according your reqirement.
Product information
Miller: Particle adjustable rolling crusher
Brew house: The mashing system is composed of mash tun, lauter pot, kettle, whirlpool, hop back, hop filter, plate heat exchanger, wort pump and pipeline, etc.
Fermentation:The fermenting system equipped with safety valve, sample valve, temperature probe, temperature sensor, racking arm, hop adding port, pressure relief valve, cleaning ball, wort inlet port, beer outlet port, drain outlet port and more accessories.
Cooling Unit: cooling wort and refrigerate the fermentation tanks.
Controlling Unit: Brewhouse/fermentation tanks/chiller/glycol water tanks temperature control.
Comtrol system & Cooling system
Product Details
Welding and polishing
Deails
Beer brewing process
Miller
*Process:we pour a small amount of water to make the barley fresh and moist, then smash it with a malt mill to get a complete barley shell and grain.
Note * Malt resurgence * Slow feeding
Brewhouse
* Process: Before mashing system, cleaning the inner tank use cleaning ball or according to your own way of cleaning.
we transfer the boiling water from the kettle to the mash/lauter tun and thoroughly soak the comminuted grain at a specific temperature.
Mashing
Note * Malt is 1:4 than water * Slow feeding, pay attention to mix * Temperature control at 50 degreesto 75 degrees * Time is 2 hours to 2.5 hours
Filtration
Note
* Two grain washing
* The slow pace
* Grain washing twice( first wort, final wort)
*Temperature control at 72 degreesto 82 degrees
* Time is 2 hours to 2.5 hours
Kettle
Note
* Hops plus two or three times
*Temperature control at 100 degrees
* Time is 1 hours to 1.5 hours
* Add suger that you want
Fermenting
We only need to add yeast and wait, but some types of beer need to add hops during the fermentation process.
Shipping Timeframes: All orders are processed within 2-5 business days (excluding weekends and holidays). After your order has been processed, the estimated delivery time is before 22 Feb, 2025, depending on customs, Please note that due to high demand, some items may experience longer shipping times, which will be communicated at order confirmation email.
Order Processing Time: Please allow 2-5 business days for us to process your order before it is shipped . Orders placed after 16:00 on Fridays, or during weekends and public holidays, will begin processing on the next business day. Processing times may be extended during peak seasons or sales events.
Manufacturing Time: Some products needs manufacturing time, the manufacturing process will take approximately 10-30 business days depending on the product. This timeframe may vary depending on the complexity of the product and current demand. but this will be communicated with you during order confirmation.
Returns and Exchanges: We offer a 30-day return policy for most items. If you are not completely satisfied with your purchase, you may return it within 30 days of receipt for a refund or exchange. Items must be unused, in their original packaging, and accompanied by proof of purchase. Return shipping costs are the responsibility of the customer, unless the item was damaged or defective upon arrival.
0
0 Overall Rating
5
0%
0
4
0%
0
3
0%
0
2
0%
0
1
0%
0
Review this product
For you to write a review, you need to login first
Afrimart Online stands as Africa's foremost e-commerce hub, featuring an expansive array of product categories spanning electronics, machinery, toys, furniture, and more. Committed to excellence, our platform delivers swift and streamlined logistics and customs clearance solutions, offering a comprehensive one-stop service for cross-border imports.
Leveraging over three decades of international trade expertise, we ensure a seamless and hassle-free importing experience, providing top-tier products at competitive prices to meet the diverse needs of African consumers.
At Afrimart, we strive to process all orders promptly. Once the payment has been successfully cleared into our account, your order will be processed within 2 to 5 business days. Please note that this processing time excludes weekends and public holidays.
Following the processing of your order, the estimated delivery lead time ranges between 35 to 60 days. However, please be aware that this timeframe is subject to variations due to potential delays in shipping and customs clearance. While we aim to adhere to the original delivery schedule, unforeseen circumstances may occasionally extend the delivery window beyond the anticipated 35 to 60 days.
In the event of high demand or other factors leading to longer shipping times for certain items, we will communicate any expected delays during the initial order confirmation. We appreciate your understanding and patience as we work to ensure your order arrives as swiftly as possible.