High Performance Automatic Hydraulic Metal Steel Square Tube Cold Roll Forming Machine
PRODUCT DESCRIPTION
Product Paramenters
Name
Parameter
Number of Head Work
50-130times/min
Head travel
450mm
Distance between rolling center and swing shaft
225mm
Distance between rolling center and crank Center
435mm
Rocker swing angle
60°30′
Rocker swing beta angle
32°59′
Crank radius
150mm
Connecting rod length
1304.5mm
Slideway length
210mm
Adjust the displacement of oblique block
25mm
Adjustment of Slide Block Connecting Head and Upper Link
22mm
Adjustment of upper connecting rod and rocker joint
20mm
(lower) Adjustment of connecting rod on rocker
15mm
Billet feed
1.5-2-2.5-3-4-5
Fast Moving Quantity of Tube Block
0.16m/s
Total Speed Ratio of Mechanical Drive
7.85
Rolling Center Height
850mm
Outside dimension of rolling mill
9000 × 1300 ×1400
Total weight of rolling mill
15t
Liaocheng Huihao Metal Products Co., Ltd.
Products Description
HIGH ACCURACY
High precision, stable performance,
high yield, full automation,
simple operation, durable, strong machine, continuous production, high efficiency, less material waste, low production cost.
SIMPLE OPERATION
Reasonable design, easy to operate,
simple and easy to understand
operation panel, mode can be freely
switched, accurate control.
Shipping Timeframes: All orders are processed within 2-5 business days (excluding weekends and holidays). After your order has been processed, the estimated delivery time is before 25 Apr, 2025, depending on customs, Please note that due to high demand, some items may experience longer shipping times, which will be communicated at order confirmation email.
Order Processing Time: Please allow 2-5 business days for us to process your order before it is shipped . Orders placed after 16:00 on Fridays, or during weekends and public holidays, will begin processing on the next business day. Processing times may be extended during peak seasons or sales events.
Manufacturing Time: Some products needs manufacturing time, the manufacturing process will take approximately 10-30 business days depending on the product. This timeframe may vary depending on the complexity of the product and current demand. but this will be communicated with you during order confirmation.
Returns and Exchanges: We offer a 30-day return policy for most items. If you are not completely satisfied with your purchase, you may return it within 30 days of receipt for a refund or exchange. Items must be unused, in their original packaging, and accompanied by proof of purchase. Return shipping costs are the responsibility of the customer, unless the item was damaged or defective upon arrival.
0
0 Overall Rating
5
0%
0
4
0%
0
3
0%
0
2
0%
0
1
0%
0
Review this product
For you to write a review, you need to login first
At Afrimart, we strive to process all orders promptly. Once the payment has been successfully cleared into our account, your order will be processed within 2 to 5 business days. Please note that this processing time excludes weekends and public holidays.
Following the processing of your order, the estimated delivery lead time ranges between 35 to 60 days. However, please be aware that this timeframe is subject to variations due to potential delays in shipping and customs clearance. While we aim to adhere to the original delivery schedule, unforeseen circumstances may occasionally extend the delivery window beyond the anticipated 35 to 60 days.
In the event of high demand or other factors leading to longer shipping times for certain items, we will communicate any expected delays during the initial order confirmation. We appreciate your understanding and patience as we work to ensure your order arrives as swiftly as possible.