Quantity | Price |
---|
Product Overview
Gold Sluices are long, narrow "boxes" that water passes through when put in a creek or stream. Sluicing is a method of separating and recovering gold from the placer gravel by the use of running water. Gold is caught or trapped by golden trapet.
Gold sluice boxes are often used in the recovery of black sands, gold, and other minerals from placer deposits during placer mining operations.
The vibrating gold sluice box is a new type of placer gold ore beneficiation equipment developed on the basis of a fixed chute. It belongs to the mineral gravity separation tank equipment. It effectively overcomes the compaction phenomenon of the chute andsignificantly improves the recovery rate of fine-grained gold. It has a very good effect on capillary gold.
Details Images
Product parameters
ITEM | Model 1 | Model 2 |
Overall dimensions (m) | 5.3*1.9*1.2M | 4.3*1.7*1 |
Number of spray pipes | 1set | 1set |
Diameter of spray pipe | 50 | 50 |
Pump flow rate (m³) | 25 | 20 |
Pump head | 26 | 26 |
Pump power (kw) | 2.2 | 2.2 |
Number of sensors | 4 | 4 |
Drive chain model | 10A | 10A |
Support material | 8/10#Channel steel | 8/10#Channel steel |
Base material | 12#Square tube | 12#Channel steel |
Number of bearings and supporting wheels | 16 | 12 |
Bearing and supporting roller model | 6309/6203 | 6309/6203 |
Lifting frame materials | 89 thick-walled round tube | 89 thick-walled round tube |
Electric lifting weight (T) | 1 | 1 |
Number of supporting legs | 2 | 2 |
Rubber sheet size | 1.5----4.3 | 1.2---3.3 |
Motor power (kw) | 3 | 3 |
Motor manufacturer | HUAYU | HUAYU |
Reducer model | 200 | 200 |
Reducer manufacturers | TAIYANG | TAIYANG |
Control cabinet switch manufacturer | Delixi/Chint | Delixi/Chint |
Number of control cabinets | 1 | 1 |
Number of V-belts | 2 piece | 2piece |
Total weight of equipment (T) | 1.8 | 1.4 |
At Afrimart, we strive to process all orders promptly. Once the payment has been successfully cleared into our account, your order will be processed within 2 to 5 business days. Please note that this processing time excludes weekends and public holidays.
Following the processing of your order, the estimated delivery lead time ranges between 35 to 60 days. However, please be aware that this timeframe is subject to variations due to potential delays in shipping and customs clearance. While we aim to adhere to the original delivery schedule, unforeseen circumstances may occasionally extend the delivery window beyond the anticipated 35 to 60 days.
In the event of high demand or other factors leading to longer shipping times for certain items, we will communicate any expected delays during the initial order confirmation. We appreciate your understanding and patience as we work to ensure your order arrives as swiftly as possible.