📌 Important:
All orders, emails, and quotations will be processed and responded to once we reopen on 3rd January 2025.
Thank you for your understanding and patience!
🎄 Festive Closing Notice:
We will be closed from 21st December 2024 to 3rd January 2025.
Wishing you a joyous holiday season! 🌟
1, The transmission mechanism adopts two-drive or three-drive form, the rack and pinion force is uniform, safe and smooth.
2、To ensure the safe operation of the elevator, safety switches such as overload and speed limit are set in the circuit. When the above situation occurs in the operation, the elevator will avoid accidents immediately and automatically. Each door on the cage is also equipped with a limit switch, so that when any door opens abnormally, the cage cannot start or stop running immediately. 3、Each cage is equipped with fall arrester, which can effectively prevent the cage from falling and ensure the safe and reliable operation of the elevator. 4、The electric control system of the elevator is simple, easy to operate and maintain, and reliable. When the elevator is in normal operation, the elevator can be operated by handle or button inside the cage, and it can be stopped at any time at any position where it needs to be stopped; at the upper and lower terminal stations, the upper and lower terminal limit switches will control the automatic stopping; if the upper and lower terminal limit switches do not work due to failure, the limit switches set on the elevator can cut off the power supply in time to make it braked. 5、Steel structure design is scientifically and closely calculated to meet the requirements of reasonable structure, reliable strength and light weight. 6、The lift can install or dismantle the rail frame by itself using the boom on the cage. The rest of the parts can be easily installed and disassembled, and the parts are easy to replace.
Model
Unit
SC200/200TD(0-36m/min)
Quantity
Unit
1
Payload
kg
2*2000
Erect payload
kg
2*1000
Payload of crane fram
kg
200
mast installation height
m
60
Safety device
SAJ40-1.2
Cage size
mm
3200×1500×2350
Mast specification
mm
650×650×1508
Quantity of tie-in
set
Ⅱ Models(2900mm-3600mm)
Cable protection frame
set
7
Cable
m
2×70(3*16+2*6)
Guide rail frame selection
A variety of guide frame size selection, recommended 650 * 650 * 1508mm.
Quantity of tie-in
A variety of Quantity of tie-in size selection, recommended Ⅱ Models.
Shipping Timeframes: All orders are processed within 2-5 business days (excluding weekends and holidays). After your order has been processed, the estimated delivery time is before 23 Feb, 2025, depending on customs, Please note that due to high demand, some items may experience longer shipping times, which will be communicated at order confirmation email.
Order Processing Time: Please allow 2-5 business days for us to process your order before it is shipped . Orders placed after 16:00 on Fridays, or during weekends and public holidays, will begin processing on the next business day. Processing times may be extended during peak seasons or sales events.
Manufacturing Time: Some products needs manufacturing time, the manufacturing process will take approximately 10-30 business days depending on the product. This timeframe may vary depending on the complexity of the product and current demand. but this will be communicated with you during order confirmation.
Returns and Exchanges: We offer a 30-day return policy for most items. If you are not completely satisfied with your purchase, you may return it within 30 days of receipt for a refund or exchange. Items must be unused, in their original packaging, and accompanied by proof of purchase. Return shipping costs are the responsibility of the customer, unless the item was damaged or defective upon arrival.
0
0 Overall Rating
5
0%
0
4
0%
0
3
0%
0
2
0%
0
1
0%
0
Review this product
For you to write a review, you need to login first
Afrimart Online stands as Africa's foremost e-commerce hub, featuring an expansive array of product categories spanning electronics, machinery, toys, furniture, and more. Committed to excellence, our platform delivers swift and streamlined logistics and customs clearance solutions, offering a comprehensive one-stop service for cross-border imports.
Leveraging over three decades of international trade expertise, we ensure a seamless and hassle-free importing experience, providing top-tier products at competitive prices to meet the diverse needs of African consumers.
At Afrimart, we strive to process all orders promptly. Once the payment has been successfully cleared into our account, your order will be processed within 2 to 5 business days. Please note that this processing time excludes weekends and public holidays.
Following the processing of your order, the estimated delivery lead time ranges between 35 to 60 days. However, please be aware that this timeframe is subject to variations due to potential delays in shipping and customs clearance. While we aim to adhere to the original delivery schedule, unforeseen circumstances may occasionally extend the delivery window beyond the anticipated 35 to 60 days.
In the event of high demand or other factors leading to longer shipping times for certain items, we will communicate any expected delays during the initial order confirmation. We appreciate your understanding and patience as we work to ensure your order arrives as swiftly as possible.