π Important:
All orders, emails, and quotations will be processed and responded to once we reopen on 3rd January 2025.
Thank you for your understanding and patience!
π Festive Closing Notice:
We will be closed from 21st December 2024 to 3rd January 2025.
Wishing you a joyous holiday season! π
Pet food production line is suitable to make dry animal food pellet (dog, cat,bird,etc).The final animal food shapes and sizes can be various by changing the extruder dies. Supply different shapes of dies free for customer. Double screw dog food machine with gearbox, smooth operation, the double screw structure of the product expanded degree of maturity good.
Model
Main Motor Power
Drying Method
Output
Size
SR65-II
22kw
Gas/electric heating
100-150kg/h
20000*5000*2000mm
SR65 with
pre-conditoner
22kw
Gas/electric heating
200-300kg/h
20000*5000*4000mm
SR70 with
pre-conditoner
30kw
Gas/electric heating
400-500kg/h
22000*5000*5000mm
SR75 with
pre-conditoner
40kw
Gas/electric heating
800-1200kg/h
22000*5000*8000mm
SR85 with
pre-conditoner
55-75kw
Gas/electric heating
1500-2000kg/h
25000*5000*8000mm
SR95 with
pre-conditoner
132-160kw
Steam/Electricity/gas
2000-2500kg/h
35000*5000*8500mm
SR115 with
pre-conditoner
160-180kw
Steam/Electricity/gas
3000-4000kg/h
45000*5000*9000mm
SR132 with
pre-conditoner
200-250kw
Steam/Electricity/gas
5000-7000kg/h
55000*5000*9000mm
Advantage of dog food production line:
1). All pet food equipment are made of stainless steel.2). The pet food whole line fully continuous and automatic.3). Our company provide basic pet food formula according to your require.4). The final pet food shapes and sizes can be various by changing the mould.5). Supply different size mould free of charge.6). Packing machine could be supplied to work with the pet feed production line (depending on your demand).
Equipment Display
Main Accessories
Function
Anti-blocking feeder
Makes sure the even feeding and stable discharge of materials.
Double shaft preconditioner
Enables the materials stay longer in the preconditioner and evenness in precondtioning, improves the precure degree and increases the capacity.
Gearbox
Processed by internationally advanced process technology, ensuring the machines run in long time without malfunction.
Lubrication and cooling system
Adopts refined filtration forced cooling, creating best working conditions for the bearings.
The feeding system
Adopts double spiral forced feeding, feeding uniformly and widely.
The screw
Segmented combined screw, suitable for a wide range of raw materials. With self-cleaning function.
The rotary cutting device
Adopts a suspended mold (knife) assembly and a linear bearing tool adjusting device to adjust the tool safely, accurately and quickly.
Key highlights of Sunrising dryerοΌ
β Unique structure, high utilization rate of heat energy, high efficiency,environmental protection and energy saving;
β Circulation drying process, the moisture difference of the dried product is small, and the drying effect is good. β Horizontal overall layout, simple structure, reliable control, convenient and intuitive operation. β The frequency motor controls the speed of the mesh belt, and the drying quality can be adjusted flexibly. β The food contact part is all stainless steel, corrosion resistant. β Energy can be gas heating and steam heating.
Name
Driving power
Heating Power
Output
Size
Single drum
Flavoring machine
0.75kw
------
100-150kg/h
3500x1500x2000mm
Double drum
Flavoring machine
4.8kw
9kw
250-350kg/h
6500x2000x2800mm
Octagonal drum
8kw
------
150-200kg/h
5000x1500x2000mm
Shipping Timeframes: All orders are processed within 2-5 business days (excluding weekends and holidays). After your order has been processed, the estimated delivery time is before 23 Feb, 2025, depending on customs, Please note that due to high demand, some items may experience longer shipping times, which will be communicated at order confirmation email.
Order Processing Time: Please allow 2-5 business days for us to process your order before it is shipped . Orders placed after 16:00 on Fridays, or during weekends and public holidays, will begin processing on the next business day. Processing times may be extended during peak seasons or sales events.
Manufacturing Time: Some products needs manufacturing time, the manufacturing process will take approximately 10-30 business days depending on the product. This timeframe may vary depending on the complexity of the product and current demand. but this will be communicated with you during order confirmation.
Returns and Exchanges: We offer a 30-day return policy for most items. If you are not completely satisfied with your purchase, you may return it within 30 days of receipt for a refund or exchange. Items must be unused, in their original packaging, and accompanied by proof of purchase. Return shipping costs are the responsibility of the customer, unless the item was damaged or defective upon arrival.
0
0 Overall Rating
5
0%
0
4
0%
0
3
0%
0
2
0%
0
1
0%
0
Review this product
For you to write a review, you need to login first
Afrimart Online stands as Africa's foremost e-commerce hub, featuring an expansive array of product categories spanning electronics, machinery, toys, furniture, and more. Committed to excellence, our platform delivers swift and streamlined logistics and customs clearance solutions, offering a comprehensive one-stop service for cross-border imports.
Leveraging over three decades of international trade expertise, we ensure a seamless and hassle-free importing experience, providing top-tier products at competitive prices to meet the diverse needs of African consumers.
At Afrimart, we strive to process all orders promptly. Once the payment has been successfully cleared into our account, your order will be processed within 2 to 5 business days. Please note that this processing time excludes weekends and public holidays.
Following the processing of your order, the estimated delivery lead time ranges between 35 to 60 days. However, please be aware that this timeframe is subject to variations due to potential delays in shipping and customs clearance. While we aim to adhere to the original delivery schedule, unforeseen circumstances may occasionally extend the delivery window beyond the anticipated 35 to 60 days.
In the event of high demand or other factors leading to longer shipping times for certain items, we will communicate any expected delays during the initial order confirmation. We appreciate your understanding and patience as we work to ensure your order arrives as swiftly as possible.