Quantity | Price |
---|
Product Description
Introduction
The mesh belt drying machine is using hot air as drying medium, material is conveyed by multi-layers stainless steel mesh belt. The hot air through the mesh belt from the bottom layer to the top layer, finally, the moisture goes out the top of the dryer and the dried goes out the discharge conveyor. The heat source have electricity, gas, diesel, wood, biomass, boiler. You can choose the one that is most convenient and economical for you.
Characteristics
1. The mesh belt drying machine uses the hot air produced by the oven heat as the drying medium. Through the hot air distribution unit, the hot air is transported to the mesh belt.
2. The volume of hot air, mesh belt running speed, temperature and humidity can be adjusted through the electric control system, to ensure continuous and automatic operation.
3. The mesh belt drying machine not only according to the heat to dry, but also according to the strong air, the air volume can reach 40000 cube meters per hour.
Product Detatil
Parameter
Model | GD-8 | GD-9 | GD-10 | GD-12 |
Layer | 4 layers, 5 layers, 6 layers | |||
Material thickness | 10-70mm | |||
Drying temperature | 40~120°C | |||
Humidity reduce | 75% to 8% (Customized) | |||
Drying time | 0.5-5 hours | |||
Power of main engine | 1.5kw | 1.5kw | 2.2kw | 3kw |
Hot air draft fan | 15kw | 15kw | 22kw | 22kw |
Conveyor discharge | B500(0.12kw) | B500(0.12kw) | B500(0.12kw) | B500(0.12kw) |
Note:The above parameters are for reference, we customize the machine according to customers’ requirements and provide the best solutions. |
Afrimart Online stands as Africa's foremost e-commerce hub, featuring an expansive array of product categories spanning electronics, machinery, toys, furniture, and more. Committed to excellence, our platform delivers swift and streamlined logistics and customs clearance solutions, offering a comprehensive one-stop service for cross-border imports.
Leveraging over three decades of international trade expertise, we ensure a seamless and hassle-free importing experience, providing top-tier products at competitive prices to meet the diverse needs of African consumers.
At Afrimart, we strive to process all orders promptly. Once the payment has been successfully cleared into our account, your order will be processed within 2 to 5 business days. Please note that this processing time excludes weekends and public holidays.
Following the processing of your order, the estimated delivery lead time ranges between 35 to 60 days. However, please be aware that this timeframe is subject to variations due to potential delays in shipping and customs clearance. While we aim to adhere to the original delivery schedule, unforeseen circumstances may occasionally extend the delivery window beyond the anticipated 35 to 60 days.
In the event of high demand or other factors leading to longer shipping times for certain items, we will communicate any expected delays during the initial order confirmation. We appreciate your understanding and patience as we work to ensure your order arrives as swiftly as possible.