450W/420G intelligent model Plastic Lid Forming Machine
it is newest advance model Plastic lid machine with PLC control and touch screen which is easy to set the parameters and operate. The full production process is including plastic sheet feeding (PS ,PET,PVC etc.) (transmission by robot hand and controlled by servo motor) ,heating and forming , and punching hole in the lid / tray, finished products are collected in conveyor unit .The mould can be customized design for different size and design coffee lid , plastic tray etc .
Machine
Plastic Thermoforming Machine
Model
DPP-450W
DPP-420G
Punch Speed
15-35 punch/min
15-35 punch/min
Max. Forming size
430*300mm
430*150mm
Max. Forming depth
Standard Type 46mm Max Target 60 MM
Max.Material width
450mm
450mm
Stroke Range
100-280mm
65-165mm
Compressed Air
0.4-0.7Mpa
0.6-0.8Mpa
Mold Cooling
60L/H tap water /recycle water
Total Power
8.2Kw
4.5Kw
Material Thickness
0.15-1 mm
0.15-0.5*340mm
Overall Dimension
2900*1000*1800MM
2500*1000*1700mm
Packing Size
3100*1100*1900MM
2150*1060*1750MM
Weight
1500 KG
1000 KG
Voltage
380V1220V 50HZ
Selling point of a product
Electric System
High stability of inovance PLC control system and Schneider brandElectric system of the machine components to achieve reliable qualityand easy maintenance
Touch Screen
It adopts PLC controller and touch screen (man -machine interface)all the working parameters can be set up on the control panel whichis convenient for parameter setting and adjusting.(easy to operate)
Servo Motor
The plastic sheets feeding is controlled by a large servo motor toensure feeding more accuratly and more stably
Big Air Cylinder/Punching Mould
Circular holes ,crossed holes ,different options are available
Shipping Timeframes: All orders are processed within 2-5 business days (excluding weekends and holidays). After your order has been processed, the estimated delivery time is before 23 Jan, 2025, depending on customs, Please note that due to high demand, some items may experience longer shipping times, which will be communicated at order confirmation email.
Order Processing Time: Please allow 2-5 business days for us to process your order before it is shipped . Orders placed after 16:00 on Fridays, or during weekends and public holidays, will begin processing on the next business day. Processing times may be extended during peak seasons or sales events.
Manufacturing Time: Some products needs manufacturing time, the manufacturing process will take approximately 10-30 business days depending on the product. This timeframe may vary depending on the complexity of the product and current demand. but this will be communicated with you during order confirmation.
Returns and Exchanges: We offer a 30-day return policy for most items. If you are not completely satisfied with your purchase, you may return it within 30 days of receipt for a refund or exchange. Items must be unused, in their original packaging, and accompanied by proof of purchase. Return shipping costs are the responsibility of the customer, unless the item was damaged or defective upon arrival.
0
0 Overall Rating
5
0%
0
4
0%
0
3
0%
0
2
0%
0
1
0%
0
Review this product
For you to write a review, you need to login first
Afrimart Online stands as Africa's foremost e-commerce hub, featuring an expansive array of product categories spanning electronics, machinery, toys, furniture, and more. Committed to excellence, our platform delivers swift and streamlined logistics and customs clearance solutions, offering a comprehensive one-stop service for cross-border imports.
Leveraging over three decades of international trade expertise, we ensure a seamless and hassle-free importing experience, providing top-tier products at competitive prices to meet the diverse needs of African consumers.
At Afrimart, we strive to process all orders promptly. Once the payment has been successfully cleared into our account, your order will be processed within 2 to 5 business days. Please note that this processing time excludes weekends and public holidays.
Following the processing of your order, the estimated delivery lead time ranges between 35 to 60 days. However, please be aware that this timeframe is subject to variations due to potential delays in shipping and customs clearance. While we aim to adhere to the original delivery schedule, unforeseen circumstances may occasionally extend the delivery window beyond the anticipated 35 to 60 days.
In the event of high demand or other factors leading to longer shipping times for certain items, we will communicate any expected delays during the initial order confirmation. We appreciate your understanding and patience as we work to ensure your order arrives as swiftly as possible.