π Important:
All orders, emails, and quotations will be processed and responded to once we reopen on 3rd January 2025.
Thank you for your understanding and patience!
π Festive Closing Notice:
We will be closed from 21st December 2024 to 3rd January 2025.
Wishing you a joyous holiday season! π
The flotation machine is suitable for the separation of non-ferrous and ferrous metals, as well as for the separation of non-metals such as coal fluorite and talc. The SF flotation machine is driven by the V-belt drive of the motor to rotate the impeller, which produces a centrifugal effect to form negative pressure. On the one hand, it sucks in sufficient air to mix with the slurry, on the other hand, it stirs the slurry and the medicine, and at the same time refines the foam, so that the mineral is bound to the foam. , Float to the pulp surface and then form mineralized foam. Adjust the height of the gate to control the liquid level, so that the useful foam is scraped out by the scraper.
Product Paramenters
SF Model
diameter (mm)
Rotate speed (r/min)
Processing capacity (m3βmin)
Main motor
Scraper motor
Overall dimension (mm)
Model
Motor power(kw)
Model
Motor power(kw)
SF0.15
200
536
0.06-0.18
Y100-6
1.5
Y80L-4
0.55
500Γ500Γ600
SF0.37
296
386
0.2-0.4
Y90L-4
1.5
Y80L-4
0.55
700Γ700Γ750
SF0.37
450
312
0.6-1.2
Y32M-6
5.5
90S-4
1.1
1100Γ1100Γ1100
SF-1.2
550
268
1.5-3.5
Y180L-6
11
Y100L6
1.5
1700Γ1600Γ1150
SF-4
650
220
2-4
Y200L-8
15
Y100L6
1.5
1850Γ2050Γ1200
SF-8
760
191
4-8
Y250M8
30
Y100L6
1.5
2200Γ2900Γ1700
SF-10
760
191
5-10
Y250M8
30
Y100L6
2.2
2200Γ2900Γ1700
JIF-4
410
305
2-5
Y160L-6
11
Y100L6
1.5
1600Γ2150Γ1250
JIF-8
540
233
4-10
Y200L26
22
Y100L6
1.5
2200Γ2900V1400
JIF-10
540
233
4-12
Y200L26
22
Y100L6
2.2
2200Γ2600Γ1700
Application field
Structure Composition of Mine Flotation Machine:
γγ The structure of the flotation machine for mining: This machine is mainly composed of a slurry tank, agitating device, aeration device, a mineralized bubble discharge device, and a motor.
γγ1. Slurry tank: It has a slurry inlet and a gate device for adjusting the slurry surface. It is mainly composed of a tank body welded by steel plate and a gate welded by steel plate and round steel.
γγ2. Stirring device: It is used to stir the ore slurry to prevent the ore from depositing in the tank. It is mainly composed of a pulley, an impeller, a vertical shaft, etc. The impeller is made of wear-resistant rubber.
3. Aeration device: It is composed of a duct air inlet pipe. When the impeller rotates, negative pressure is generated in the impeller cavity, which sucks in the air through the hollow pump tube and disperses it in the slurry to form a group of bubbles. This kind of slurry with a large number of bubbles The impeller is quickly thrown to the stator by the rotating force of the impeller, which further refines the bubbles in the slurry and eliminates the rotating motion of the slurry flow in the flotation tank, resulting in a large number of vertically rising microbubbles, which provides necessary for the flotation process condition.
γγ4. Device for removing mineralized bubbles: it scrapes out the foam floating on the surface of the tank. It is mainly composed of a motor driving a reducer and a reducer driving a scraper.
Products Description
The flotation machine is mainly used to sort non-ferrous metals such as copper, zinc, lead, nickel, gold, etc., and can also be used for the rough selection and selection of ferrous metals and non-metals.The unmineralized coal particles on the bottom of the tank will be mixed, mineralized and separated again through the circulation hole and the upper suction port. Part of the slurry under the tank, which is not sucked by the impeller, enters the bottom of the second chamber through the middle ore box buried in the slurry. After all the processes in the first chamber are completed, it enters the third chamber. After one room, it enters the tailings box to discharge the final tailings. It is an indispensable important equipment for ore dressing production line
Shipping Timeframes: All orders are processed within 2-5 business days (excluding weekends and holidays). After your order has been processed, the estimated delivery time is before 23 Feb, 2025, depending on customs, Please note that due to high demand, some items may experience longer shipping times, which will be communicated at order confirmation email.
Order Processing Time: Please allow 2-5 business days for us to process your order before it is shipped . Orders placed after 16:00 on Fridays, or during weekends and public holidays, will begin processing on the next business day. Processing times may be extended during peak seasons or sales events.
Manufacturing Time: Some products needs manufacturing time, the manufacturing process will take approximately 10-30 business days depending on the product. This timeframe may vary depending on the complexity of the product and current demand. but this will be communicated with you during order confirmation.
Returns and Exchanges: We offer a 30-day return policy for most items. If you are not completely satisfied with your purchase, you may return it within 30 days of receipt for a refund or exchange. Items must be unused, in their original packaging, and accompanied by proof of purchase. Return shipping costs are the responsibility of the customer, unless the item was damaged or defective upon arrival.
0
0 Overall Rating
5
0%
0
4
0%
0
3
0%
0
2
0%
0
1
0%
0
Review this product
For you to write a review, you need to login first
Afrimart Online stands as Africa's foremost e-commerce hub, featuring an expansive array of product categories spanning electronics, machinery, toys, furniture, and more. Committed to excellence, our platform delivers swift and streamlined logistics and customs clearance solutions, offering a comprehensive one-stop service for cross-border imports.
Leveraging over three decades of international trade expertise, we ensure a seamless and hassle-free importing experience, providing top-tier products at competitive prices to meet the diverse needs of African consumers.
At Afrimart, we strive to process all orders promptly. Once the payment has been successfully cleared into our account, your order will be processed within 2 to 5 business days. Please note that this processing time excludes weekends and public holidays.
Following the processing of your order, the estimated delivery lead time ranges between 35 to 60 days. However, please be aware that this timeframe is subject to variations due to potential delays in shipping and customs clearance. While we aim to adhere to the original delivery schedule, unforeseen circumstances may occasionally extend the delivery window beyond the anticipated 35 to 60 days.
In the event of high demand or other factors leading to longer shipping times for certain items, we will communicate any expected delays during the initial order confirmation. We appreciate your understanding and patience as we work to ensure your order arrives as swiftly as possible.