Quantity | Price |
---|
Material Specifications:
Machine Specifications:
Cutter Specifications:
Power and Control:
Options:
Product Showcase: The C Solar Photovoltaic Bracket Panel Mounting Structure Strut Channel Roll Form Machine is designed for high efficiency and durability in producing strut channels for solar photovoltaic bracket panels. It is highly suitable for large-scale production and has multiple configurations available for customization to meet specific needs.
Product Name | C solar strut channel roll form machine | |
Material | Applicable material | GI(Galvanized Steel Sheet)/HR/PPGL |
Material thickness | 1.0-2.5mm | |
With yield strength | 235-345-550Mpa Yield Strength | |
Machine | Base frame | H400 type steel |
Roller material | bearing steel GCr15 with hard chrome coating or mold steel Cr12 | |
Hardness | Heat treatment to HRC52-58 degree | |
Roller station | 22-24 to form | |
Shaft diameter | 70mm/ 75mm | |
Machine size | 10000*1200*1500mm | |
Machine weight | 10-15tons | |
Machine color | 2.Blue(RAL5015)+ orange (RAL2004), as per the seller factory’s color standard | |
Working speed | 15m/min | |
Cutter | Hardness | Heat treatment to HRC58-62 degree |
Cutting tolerance | ≤±1mm | |
Material | Cr12MoV(= Z200C12 with at least one million times of cutting life) | |
Operate | By PLC | |
Power | Driving way | Gear/Sprocket transmission, |
Main motor | 15-18.5KW | |
Pump motor for cutter | 5.5kw/11kw | |
Voltage | 220/380/415/480V- 60/50Hz/3Ph --should be confirmed | |
PLC Control System | Inverter | Schneider Electric/Siemens/DELTA (Taiwan brand) |
Touch screen | Schneider Electric/Siemens/WEINVIEW(Taiwan brand) | |
Encoder | OMRON (Japan brand) or KOYO (Japan brand) | |
Cut-to-length tolerance | ≤±1mm | |
Control voltage | 24V | |
Automatic Stacker and Printer | Options |
Product Show
Profile Drawing
At Afrimart, we strive to process all orders promptly. Once the payment has been successfully cleared into our account, your order will be processed within 2 to 5 business days. Please note that this processing time excludes weekends and public holidays.
Following the processing of your order, the estimated delivery lead time ranges between 35 to 60 days. However, please be aware that this timeframe is subject to variations due to potential delays in shipping and customs clearance. While we aim to adhere to the original delivery schedule, unforeseen circumstances may occasionally extend the delivery window beyond the anticipated 35 to 60 days.
In the event of high demand or other factors leading to longer shipping times for certain items, we will communicate any expected delays during the initial order confirmation. We appreciate your understanding and patience as we work to ensure your order arrives as swiftly as possible.