π Important:
All orders, emails, and quotations will be processed and responded to once we reopen on 3rd January 2025.
Thank you for your understanding and patience!
π Festive Closing Notice:
We will be closed from 21st December 2024 to 3rd January 2025.
Wishing you a joyous holiday season! π
Rotary dryers are used to dry small, powdery or granular wet materials such as wood chips, sawdust, sand, mineral dust, agricultural waste, etc.The raw material is transported by the scraper conveyor to the inside of the rotary dryer.and the front is equipped with a hot blast stove. The generated hot air enters the dryer by the fire separating device, and the material is dispersed by the low-speed rotation and bending plate.so that the high-temperature airflow passes through the material and make heat exchange, the rotary dryer has a certain angle of inclination, and sufficient air volume to drive the material forward.Finally, the dried material is discharged from the discharge port.
Model
Main motor
(kw)
Capacity( t/h)
οΌmoisture from 50% to 15%οΌ
fan
(kw)
airlock
(kw)
Diameter
(m)
ZSHG1.0-10
5.5
0.2ο½0.4
7.5
1.5
Ξ¦1.0*10
ZSHG1.2-12
5.5
0.3ο½0.6
7.5
1.5
Ξ¦1.2*12
ZSHG1.5-12
7.5
0.4ο½1.0
15
2.2
Ξ¦1.5*12
ZSHG1.5-15
11
0.5ο½1.2
18.5
2.2
Ξ¦1.5*15
ZSHG1.6-18
15
0.7-1.8
22
3
Ξ¦1.6*18
ZSHG1.8-18
15
0.9ο½2.1
22
3
Ξ¦1.8*18
ZSHG2.0-20
18.5
1.2ο½2.8
30
3
Ξ¦2.0*20
ZSHG2.2-24
18.5
1.7ο½3.8
30
4
Ξ¦2.2*24
Sawdust dryer are widely used for the drying of straw briquette, charcoal, wood pellet fuel, sawdust briquette, corn straw, soybean straw, cotton stalk, wheat straw, sorghum stalk, wood shavings, sawdust, gingko leaf, mulberry leaves and other fiber materials.
According to your raw materials, we also provide three-layer rotary drum dryer, three-layer rotary drum dryer which can improve the internal structure of the original single drum dryer, increase the pre-drying of wet materials before entering the machine and prolong the drying time of wet materials in the machine, Coupled with sealing, heat preservation and reasonable supporting measures, the production capacity of the dryer is increased by 48-80% compared with the original single cylinder dryer, the evaporation intensity per unit volume can reach 120-180kg/m3, and the standard coal consumption is only 6-8kg/t. Moreover, it effectively reduces the occupied area, and the smaller volume is convenient for sea transportation.
Temperature measurement sensors and digital display instruments are installed at the high and low-temperature pipelines of the drying system to achieve the best drying effect and ensure the safe operation of the system.
It can be equipped with a mechanical chain coal-fired hot blast stove, which has strong adaptability to coal types, and the overall thermal efficiency can reach more than 80%. The average coal consumption per ton of precipitation is not more than 176kg of standard coal.
This machine also have gas cleaning system. With cyclone, air fan, wet dust filter. Without pollution.
The drum body adopts screw + plate structure, double-layer plate and turnover plate are continuously turned up and down to make the material fully touch with the hot air, promote the heat exchange, ensure the drying efficiency.
We will provide you with professional and detailed 3D drawings and production plans after receiving your inquiry.
The following are the installation locations of our customers:After the transaction is concluded, Zhang Sheng engineer will fly to your address, install and adjust the machine freely for you, and train your operation skills until you are satisfied.
4-5t/h wood waste drying pellet plant
Capacity:4-5t/hPellet size:6/8mm pelletMain machine:Wood chipper,hammer mill,wood drying plant,wood pellet mill,cooling machine and packing machineDelivery time:40-50 working daysProduction line:Morroco
2-3t/h wood waste drying pellet plant
Capacity:2-3t/hPellet size:8/10mm pelletMain machine:Wood chipper,hammer mill,wood drying plant,wood pellet mill,cooling machine and packing machineDelivery time:35 working daysProduction line:Russia
Shipping Timeframes: All orders are processed within 2-5 business days (excluding weekends and holidays). After your order has been processed, the estimated delivery time is before 23 Feb, 2025, depending on customs, Please note that due to high demand, some items may experience longer shipping times, which will be communicated at order confirmation email.
Order Processing Time: Please allow 2-5 business days for us to process your order before it is shipped . Orders placed after 16:00 on Fridays, or during weekends and public holidays, will begin processing on the next business day. Processing times may be extended during peak seasons or sales events.
Manufacturing Time: Some products needs manufacturing time, the manufacturing process will take approximately 10-30 business days depending on the product. This timeframe may vary depending on the complexity of the product and current demand. but this will be communicated with you during order confirmation.
Returns and Exchanges: We offer a 30-day return policy for most items. If you are not completely satisfied with your purchase, you may return it within 30 days of receipt for a refund or exchange. Items must be unused, in their original packaging, and accompanied by proof of purchase. Return shipping costs are the responsibility of the customer, unless the item was damaged or defective upon arrival.
0
0 Overall Rating
5
0%
0
4
0%
0
3
0%
0
2
0%
0
1
0%
0
Review this product
For you to write a review, you need to login first
Afrimart Online stands as Africa's foremost e-commerce hub, featuring an expansive array of product categories spanning electronics, machinery, toys, furniture, and more. Committed to excellence, our platform delivers swift and streamlined logistics and customs clearance solutions, offering a comprehensive one-stop service for cross-border imports.
Leveraging over three decades of international trade expertise, we ensure a seamless and hassle-free importing experience, providing top-tier products at competitive prices to meet the diverse needs of African consumers.
At Afrimart, we strive to process all orders promptly. Once the payment has been successfully cleared into our account, your order will be processed within 2 to 5 business days. Please note that this processing time excludes weekends and public holidays.
Following the processing of your order, the estimated delivery lead time ranges between 35 to 60 days. However, please be aware that this timeframe is subject to variations due to potential delays in shipping and customs clearance. While we aim to adhere to the original delivery schedule, unforeseen circumstances may occasionally extend the delivery window beyond the anticipated 35 to 60 days.
In the event of high demand or other factors leading to longer shipping times for certain items, we will communicate any expected delays during the initial order confirmation. We appreciate your understanding and patience as we work to ensure your order arrives as swiftly as possible.